BCRM
Jun 2016
0
Contents
Key Takeaways
Pre-Cutover
Thu
Fri
Sat
Cutover
Fri
Sat
Post-Cutover
Fri
Sat
Fri
30 Jun 1 Jul 1 Jul 3 Jul 4 Jul 5 Jul 6 Jul 7 Jul 8 Jul 9 Jul 10 Jul11 Jul12 Jul13 Jul14 Jul15 Jul16 Jul17 Jul18 Jul 19 Jul20 Jul21 Jul22 Jul
< Day 0
Day 0 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9Day 10Day 11Day 12Day 13Day 14
e-Application System
Outage Period
6 July 12:00 PM
Block for
Contractor
submission for:
NC
Rewiring
and Application
submission for:
COT Type 2
COA
NO ACCESS
myTNB Go Live!
1 July 12:00 AM
Block for
Applicant
submission for:
NC
Rewiring
COT Type 1
Group NC
Group Ind
Security Deposit
Disconnection Order/
Disconnection Notice
Connection Charges
Stamp Duty
Sundries
Type
New Application without
Construction
i) Move In Existing
Premise/COT Type 5 (Move
In Only))
ii) Move In Group-Individual
Accepted
Not Accepted
OPC Non-Domestic
OPC Domestic
All LPC
Customized Contract
Rewiring
All types
CC Payment
Change of Tariff
All types
Meter Charges
10
6 July 2016
Last day for
Contractor to
update New
Supply
Application
including
Rewiring
6-20 July
2016 NO
ACCESS
TO eAPPS
20 July
2016
www.myTNB
.com.my
Contents
Key Takeaways
12
Action
Individual*
Contractor
Role
Process
Action
Individual*
>100kVA Supply
Application
Individual*/ Contractor
Project Information
To view project
details (e.g.
Functional Location,
Project ID, SN #)
To add additional
project PIC
To add electrical
contractor
To view parcel
Move-In Application
Contents
Key Takeaways
.
Notes:
1. Developers/Consultants/Contractors need to register themselves for an individual
myTNB account.
16
Notes:
1.Upon successful registration, users will receive an email from TNB SSP Admin that
an individual account has been successfully created.
2.Users can click on the link provided to activate their account and they will be
navigated to myTNB SSP.
17
Notes:
1. Click on the View Profile button at My Summary Profile on the MY Dashboard page.
18
Notes:
1.Click on the My Setting tab to enter My Setting page. Users can choose to create an individual role
or a contractor role.
2.Users have options to choose Individual account or contractor account as homepage
19
Notes:
1. Search for your ROC number and fill in the contractor enrollment form
Contents
Key Takeaways
22
Step 3: Key in all the information required for the following tabs.
Developer/Owner Information
23
Consultant Information
Step 3: Key in all the information required for the following tabs.
Main Contractor information
24
Premise Information
Step 4:
4.1 Download Map A, Map B and Map C forms.
4.2 Attach the printed documents together with other mandatory documents.
4.3 Tick Terms and Condition and Acknowledgement box and click submit.
25
Step 5: Applicant can view the status of the application and make
payment when the status shows Pending CC Payment.
a) View status of application
26
b) Make Payment
27
28
29
30
Premise Information
Step 9:
9.1 Download and submit the printed form.
9.2 Attach the printed document together with other mandatory documents.
9.3 Tick Terms and Condition and Acknowledgement box and click submit.
31
Contents
Key Takeaways
Technical Details
Step 3:
3.1 Download and print form.
3.2 Attach the printed document together with other mandatory documents.
3.3 Tick Terms and Condition and Acknowledgement box and click submit.
Contents
Key Takeaways
2
100% of
applications to be
submitted online
4
Encourage
customers to
register with
myTNB
39
Ensure accurate
customer data
(phone numbers,
email addresses,
etc)
Online payment
limited to amounts of
RM 30,000 and
below
6
Advise customers
on the downtime
expedite/delay
applications and
payment
40
Contractors need to
clear cheques
prepared by
customers at Kedai
Tenaga by keeping
the myTNB
application number
Thank You