Atr 72
Atr 72
Atr 72
PARKING
PKG 10000-001
1
MAR14
ZONING DATA
___________
ZONE
: 211
212
260
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
AH
_________
MAN-HOURS
02
10-10-00
PKG 10000-001
2-400 PAGE
1
MAR 01/14
10-10-00
PARKING
PKG 10000-001
2
001
MAR14
____________
INSTALLATION
FOR AIRCRAFT OUT OF OPERATION,MOORING PROCEDURE
COULD BE REQUIRED TO AVOID AIRCRAFT MOVEMENT,
ACCORDING TO THE WIND SPEED CONDITIONS (CURRENT
OR FORECASTED),AIRCRAFT WEIGHT AND CENTER OF
GRAVITY.
MOORING SHOULD BE ALWAYS PERFORMED ON SNOW OR
ICE COVERED SURFACES.
REF. FIG. 101000-PKG-00100
REF. FIG. 101000-PKG-00110
REF. FIG. 101000-PKG-00120
1. PARK AIRCRAFT HEAD INTO WIND.
NOTE:THE PARKING BRAKE IS EFFICIENT FOR A
MAXIMUM 8 HOURS.
AFTER 8 HOURS PRESSURIZE BLUE HYDRAULIC
SYSTEM.
REF.JIC 292500-OPT-10000.
RE-SET THE PARKING BRAKE.
2. CHECK THAT PARKING BRAKE IS APPLIED.
NOTE: DO NOT APPLY HAND BRAKE IF EXTERNAL
TEMPERATURE IS LOWER THAN 0 DEG. C
(32 DEG. F).
3. ENGAGE GUST LOCK SYSTEM (THE SYSTEM CONTROL
LEVER IS LOCATED ON CENTER PEDESTAL FORWARD
POWER LEVER).
4. CHECK THE FULL TRAVEL OF THE RUDDER, BY
CHECKING THAT THE TLU SELECTOR SWITCH (11CY)
ON PANEL 25 VU, IS IN AUTO POSITION.
5. INSTALL MAIN AND NOSE LANDING GEAR WHEEL
CHOCKS.
6. POSITION TAIL STRUT ON TAIL BUMPER SHOE
*** CONTINUED ***
AH
10-10-00
PKG 10000-001
2-400 PAGE
2
MAR 01/14
10-10-00
PARKING
PKG 10000-001
3
MAR14
10-10-00
PKG 10000-001
2-400 PAGE
3
MAR 01/14
10-10-00
PARKING
PKG 10000-001
4
MAR14
003
_______
REMOVAL
REF. FIG. 101000-PKG-00100
101000-PKG-00110
101000-PKG-00120
WARNING: BEFORE TO REMOVE TE WHEEL CHOCKS
|
|
MAKE CERTAIN OF THE EFFICIENCY OF
|
|
THE PARKING BRAKE.
|
|---------------------------------------------|
1. REMOVE ALL INSTALLED COVERS AND PROTECTIVE
DEVICES :
A. THE TWO TEMPERATURE PROBES (7) COVERS.
B. THE SIX STATIC PORT COVER ASSIES (5).
C. THE THREE PITOT PROBE COVERS (6).
*** CONTINUED ***
AH
10-10-00
PKG 10000-001
2-400 PAGE
4
MAR 01/14
10-10-00
PARKING
PKG 10000-001
5
MAR14
AH
E N D
O F
T E X T
*****
10-10-00
PKG 10000-001
2-400 PAGE
5
MAR 01/14
10-10-00
6
AH
PARKING
PKG 10000-001
MAR14
10-10-00
PKG 10000-001
2-400
PAGE
6
MAR 01/14
10-10-00
7
AH
PARKING
PKG 10000-001
MAR14
10-10-00
PKG 10000-001
2-400
PAGE
7
MAR 01/14
10-10-00
8
AH
PKG 10000-001
MAR14
10-10-00
PKG 10000-001
2-400
PAGE
8
MAR 01/14
10-21-00
MOORING
MOG 10000-003
1
MAR15
ZONING DATA
___________
ZONE
: 730
740
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
GSE
: 01
MOORING KIT
___
MEN
_________
MAN-HOURS
02
98S10205000004
PUBLICATION
___________
JIC
: PARKING
AH
10-10-00-PKG-10000
10-21-00
MOG 10000-003
2-400 PAGE
1
MAR 01/15
10-21-00
MOORING
MOG 10000-003
2
001
MAR15
_______
WARNING
REF.
REF.
REF.
REF.
FIG.
FIG.
FIG.
FIG.
102100-MOG-00100
102100-MOG-00110
102100-MOG-00120
102100-MOG-00125
R
R
R
R
R
R
R
10-21-00
MOG 10000-003
2-400 PAGE
2
MAR 01/15
10-21-00
MOORING
MOG 10000-003
3
R
R
MAR15
___________
PREPARATION
1. POSITION THE AIRCRAFT SO THAT MAIN LANDING
GEAR DE-BOGGING FIXTURES AND NOSE LANDING
GEAR TOWING FIXTURES CORRESPOND TO MOORING
SHACKLES ON GROUND.
A. PERFORM THE LAST METERS OF ANY TAXIING
PROCEDURE STRAIGHT FORWARD SO THAT NO
TORSION LOAD IS EXERTED ON TIRES AND
LANDING GEARS HINGE POINTS.
NOTE : THE ACCURACY OF AIRCRAFT
POSITIONING WITH RESPECT TO THE
MOORING POINTS MUST BE OF 100MM
(3.94 IN.) FOR MOORING WITH CABLES
AND TURNBUCKLES (7 MOORING RINGS
ON THE GROUND).
2. CONNECT AIRCRAFT TO GROUND.
003
_______
PARKING
SEE JOB INSTRUCTION CARD
101000-PKG-10000
004
_________________
MOORING
PRINCIPLE
1. MOORING PRINCIPLE
10-21-00
MOG 10000-003
2-400 PAGE
3
MAR 01/15
10-21-00
MOORING
MOG 10000-003
4
MAR15
R
R
R
R
R
R
R
R
R
R
_______________________________
GROUND
MOORING RINGS DEFINITION
REF. FIG. 102100-MOG-00150
REF. FIG. 102100-MOG-00155
1. 7 MOORING RINGS ARE REQUIRED.
2. EACH MOORING RING MUST BE DESIGNED
TO WITHSTAND A MINIMUM LOAD OF 4000DAN
AT 25DEG WITH RESPECT TO GROUND.
10-21-00
MOG 10000-003
2-400 PAGE
4
MAR 01/15
10-21-00
MOORING
MOG 10000-003
5
006
MAR15
_______________________________________
MOORING
PROCEDURE USING ATR MOORING KIT
REF. FIG. 102100-MOG-00150
REF. FIG. 102100-MDG-00160
R
R
R
R
R
R
R
R
10-21-00
MOG 10000-003
2-400 PAGE
5
MAR 01/15
10-21-00
MOORING
MOG 10000-003
6
MAR15
ON NLG.
B. INSTALL TURNBUCKLE (23) AND ITS SHACKLE
(24) ON FITTING (10).
C. SECURE TURNBUCKLE (23) WITH GROUND
MOORING RING (27).
R
R
R
R
R
_______
REMOVAL
1. DISCONNECT MOORING TURNBUCKLES.
2. REMOVE ALL SHACKLES AND ADAPTERS FROM
LANDING GEAR LEGS.
3. CHECK THAT NO TOOLING OBSTRUCTS LANDING
GEAR OPERATING MECHANISM.
4. CLEAN AREA AROUND AIRCRAFT.
*****
AH
E N D
O F
T E X T
*****
10-21-00
MOG 10000-003
2-400 PAGE
6
MAR 01/15
10-21-00
7
AH
COMPUTATION OF A/C
CENTER OF GRAVITY WITH
ENGINE(S) REMOVED
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
7
MAR 01/15
10-21-00
8
AH
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
8
MAR 01/15
10-21-00
9
AH
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
9
MAR 01/15
10-21-00
10
MOG 10000-003
MAR15
R
AH
10-21-00
MOG 10000-003
2-400
PAGE
10
MAR 01/15
10-21-00
11
AH
MOORING - ANCHORING
POINT LOCATION
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
11
MAR 01/15
10-21-00
12
AH
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
12
MAR 01/15
10-21-00
13
AH
MOG 10000-003
MAR15
10-21-00
MOG 10000-003
2-400
PAGE
13
MAR 01/15
12 - MAR 01/15
10-21-00-MOG-10000-003
ALL
AH
12
PAGE
1
MAR 01/15
PAGE
8 MAR/14
13 MAR/15
ALL
ALL
REVISION NO 12 - MAR/15
10-10-00-PKG-10000-001 PARKING
R 10-21-00-MOG-10000-003 MOORING
AH
1 TO
1 TO
1
MAR/15