0% found this document useful (0 votes)
104 views1 page

Eclipse Error Log

The ABAP communication layer is not configured properly which may be caused by missing Microsoft Runtime DLLs for VS2010. Initialization of JCo failed with an UnsatisfiedLinkError because the sapjco3 library could not be found in the Java library path. The document recommends consulting the installation guide or download page to properly install the missing components.

Uploaded by

SANJEEV SINGH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views1 page

Eclipse Error Log

The ABAP communication layer is not configured properly which may be caused by missing Microsoft Runtime DLLs for VS2010. Initialization of JCo failed with an UnsatisfiedLinkError because the sapjco3 library could not be found in the Java library path. The document recommends consulting the installation guide or download page to properly install the missing components.

Uploaded by

SANJEEV SINGH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 1

ABAP communication layer is not configured properly.

This might be caused by mis


sing Microsoft Runtime DLLs VS2010. Consult the installation guide or download p
age for further details on how to install this component.
JCo initialization failed with java.lang.UnsatisfiedLinkError: no sapjco3 in jav
a.library.path

You might also like