INSTALLATION &
SERVICING INSTRUCTIONS
SAFETY &
REGULATIONS
CONTENTS
INSTALLATION REGULATIONS
4
APPLIANCE
INFORMATION
APPLIANCE INFORMATION
GENERAL INFORMATION
TECHNICAL DATA
PRE-INSTALLATION
MAINS SUPPLY
10
11
CONDENSATE PIPEWORK
12
13
14
PLUMBING MANIFOLD
16
FLUE OPTIONS
17
18
PRE INSTALLATION
INSTALLATION
INSTALLATION
20
21
22
BOILER CONNECTIONS
23
FLUE INSTALLATION
25
CONDENSATE CONNECTION
28
ELECTRICAL
29
30
COMMISSIONING
PRE-COMMISSIONING CHECKS
31
32
33
WATER TREATMENT
34
COMMISSIONING
35
FINISHING COMMISSIONING
36
SERVICING
& SPARES
COMMISSIONING
CONVERSION
KITS
REPLACEMENT OF PARTS
43
53
55
CONVERSION KITS
56
FAULT FINDING
& DIAGRAMS
L.P.G. CONVERSION
FAULT FINDING & DIAGNOSIS
FAULT FINDING
57
BOILER FUNCTION
58
PROTECTION FUNCTION
59
3
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
CONTENTS
SAFETY &
REGULATIONS
SAFETY PRECAUTIONS
INSTALLATION REGULATIONS
British Standards:
The relevant British Standards should be followed,
including:
BS7074:1 : Code of practice for domestic and hot
water supply
BS6891 : Installation of low pressure gas pipework
up to 28mm (R1)
BS5546 : Installation of gas hot water supplies for
domestic purposes
EN:12828 : Central heating for domestic premises
BS5440:1 : Flues and ventilation for gas appliances of rated heating not exceeding 70kW (net) :
Flues
BS5440:2 : Flues and ventilation for gas appliances of rated heating not exceeding 70kW (net) :
Air Supply
BS7593 : Treatment of water in domestic hot water
central heating systems
BS 6798 : Installation of gas fired boilers of rated
input up to 70kW (net)
Where no specific instruction is given, reference
should be made to the relevant British Standard
codes of Practice.
L.P.G. Installation:
An appliance using L.P.G. must not be installed in a
room or internal space below ground level unless
one side of the building is open to the ground.
A Benchmark Checklist is provided by Worcester, Bosch Group, at the back of this manual,
for the installer to complete. The checklist will include their CORGI registration number to
confirm that the boiler has been installed, commissioned and serviced according to the
manufacturers instructions.
IMPORTANT: The completed Benchmark Checklist will be required in the event of any
warranty work and may be required by the local Building Control Inspector.
warranty.
FITTING & MODIFICATIONS
Fitting the appliance and any controls to the appliance may only be carried out by a
competent engineer in accordance with the current Gas Safety (Installation and Use)
Regulations.
Flue systems must not be modified in any way other than as described in the fitting
instructions. Any misuse or unauthorised modifications to the appliance, flue or
associated components and systems will invalidate the warranty. The manufacturer
accepts no liability arising from any such actions, excluding statutory rights.
SERVICING
Advise the user to have the system serviced annually by a competent, qualified
engineer (such as British Gas or other CORGI registered personnel) using approved
spares, to help maintain the economy, safety and reliability of the appliance.
IMPORTANT - The service engineer must complete the Service Record on the
Benchmark Checklist after each service.
4
SAFETY PRECAUTIONS
& INSTALLATION REGULATIONS
GENERAL INFORMATION
APPLIANCE
INFORMATION
700mm*
B
400mm
C
STANDARD PACKAGE:
Check List
Hardware/Literature pack
Item
Qty
Greenstar 12i/24i System Installation/Servicing Instructions . . . . . . . . . . .1
Users Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Consumer Guarantee Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Sealing Pack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Compression Nut 22mm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Compression Ring 22mm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Compression Nut 15mm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Compression Ring 15mm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Fibre Washer 23.9 x 17.2 x 1.5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Bonded Washer 3/4 For Gas Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Syphon assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Installation instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Irish Guidelines Leaflet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Warranty Return Envelope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
5
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
GENERAL INFORMATION
TECHNICAL DATA
DESCRIPTION
NATURAL
L.P.G.
UNITS
12i
24i
12i
24i
m3/h
1.33
2.67
kg/h
0.96
1.91
APPLIANCE
INFORMATION
Central Heating
Max. rated heat input
kW
kW
3.70
kW
kW
kW
12
24
12
24
82
82
82
82
75
75
75
75
bar
2.5
2.5
2.5
2.5
2.0
2.0
2.0
2.0
7.38
5.95
9.64
Flue
Flue Gas Temp. 80/60C, rated/min. load
9.8
9.8
11.0
11.0
9.2
9.2
10.5
10.5
0.93
2.0
0.7
1.5
4.8
4.8
4.8
4.8
NOx - class
Condensate
Max. condensation rate
l/h
pH value, approx.
Electrical
Electrical power supply voltage
AC...V
230
230
230
230
Frequency
Hz
50
50
50
50
140
140
140
140
band
IP
X4D
X4D
X4D
X4D
IP
20
20
20
20
0-50
0-50
0-50
0-50
Iitres
3.9
3.9
3.9
3.9
dB(A)
42
42
42
42
kg
44.4
44.4
44.4
44.4
kg
39.5
39.5
39.5
39.5
Lift weight
kg
27.1
27.1
27.1
27.1
SEDBUK
90.1
90.2
91.4
92.0
General Data
SEDBUK
6
TECHNICAL DATA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
APPLIANCE
INFORMATION
7
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
APPLIANCE
INFORMATION
8
LAYOUT & COMPONENTS
CAUTION: ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
PRE INSTALLATION
9
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
MAINS SUPPLY
PRE INSTALLATION
ELECTRIC SUPPLY:
Supply: 230V - 50Hz, 140 watts
Cable: PVC insulated 0.75mm2 (24 x 0.2mm)
temperature rated to 90C.
External 3A fuse to BS1362.
The appliance must be earthed.
This appliance must not be connected to a
three phase supply.
IPX4D.
NOTE: this is reduced to IP20 if the
following mechanical timers are fitted:
7 716 192 036 or 7 716 192 037.
Wiring must comply with latest IEE wiring
regulations.
GAS SUPPLY:
Boilers using NG must be connected to a
governed meter.
LPG boilers must be connected to a
regulator.
Installation and connection of the gas supply
to the boiler must be in accordance with
BS6891.
The meter or regulator and pipework to the
meter must be checked, preferably by the gas
supplier, to ensure it is in good working order
and can meet the gas flow and pressure
requirements in addition to the demand from
any other appliance being served.
24 iSystem
Under no circumstances should the size of
the gas supply pipe be less than 22mm.
GAS SUPPLY PIPE SIZING
12 iSystem models
Provided that the correct gas supply working
pressure and gas rate can be achieved (see
technical data on page 6, commissioning section page 35, also refer to B.S. 6891)
Then it may be possible to reduce the gas
supply pipe diameter to 15mm.
Generally the appliance would need to be within
3 to 4 metres of the gas meter. However, this
will depend upon the distribution pipe size and
route.
10
MAINS SUPPLY
S PLAN LAYOUT
Y PLAN LAYOUT
WITH EXTERNAL DIVERTER VALVE
PRE INSTALLATION
INSTALLATION
COMMISSIONING
Boiler flow
Return from
cylinder
Return from
central heating
11
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
PRE INSTALLATION
12
CONDENSATE PIPEWORK
PRE INSTALLATION
M
L - Outside wall
O,M - Drain pipe
N - External drain
O
N
13
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
SERVICING CLEARANCES
VENTED COMPARTMENT
930mm
+ 30mm
above elbow
5mm
5mm
20mm
to removable door
PRE INSTALLATION
CLEARANCES
600mm
front clearance
for service
COMPARTMENTS:
Follow the requirements of BS6798 and
BS5440 Part 2 and note:
Minimum clearances must be maintained
An access door is required to install, service
and maintain the boiler and any ancilliary
equipment.
If fitting the boiler into an airing cupboard
use a non-combustible perforated material
(maximum hole sizes of 13mm) to separate
the boiler from the airing space.
BOILER CLEARANCES:
The diagram opposite shows the minimum
space required to install and service the boiler.
200mm
Vent
position
12 & 24 kW
To room or
internal space
High
level
Minimum free
area 122 cm2
Minimum
free area
61 cm2
Low
level
Minimum free
area 122 cm2
Minimum
free area
61cm2
Direct to
outside
Above
Below
400mm
170mm approx.
(30mm above
the elbow)
200mm
(Note: Top and bottom clearances must not be reduced below these values as they are the
minimum required for servicing).
**
350mm
OR
441mm
129mm
300mm
523mm
161mm
250mm
617mm
200mm
200mm
727mm
243mm
150mm
856mm
295mm
100mm
1012mm
358mm
50mm
1202mm
434mm
50mm
25mm
511mm
596mm
OR
**
505mm
569mm
14
BOILER LOCATION & CLEARANCES
1
2
A boiler with a mechanical timer, or RF mechanical timer with room thermostat must only be
installed outside the shaded area.
Additional RCD (Residual Current Device) protection may be required.
PRE INSTALLATION
1
2
1
2
15
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
PLUMBING MANIFOLD
Flow 22mm
CONNECTIONS:
Heating System: 22mm compression fittings
Gas:
22mm compression fittings
Use the fittings supplied in the Lit/Hardware
pack.
CAUTION:
The side rails of the wall mounting frame are
manufactured from a plastic material!
Do not apply excessive heat in these areas.
There exists the possibility of damage to the
plastic side rail when soldering copper pipe
connections.
PRE INSTALLATION
Flow 22mm
Return 22mm
Mains Gas Supply 22mm
16
PLUMBING MANIFOLD
FLUE OPTIONS
The Greenstar series has the option of two horizontal RSF (60/100 telescopic and
80/125) flue systems and two vertical RSF (60/100 or 80/125) flue systems:
The systems have different maximum flue lengths
This page shows various fluing options with the straight flue lengths required to achieve
the maximum flue length. Note that:
each 90 bend used is equivalent to 2 metres of straight flue
each 45 bend used is equivalent to 1 metre of straight flue
NOTE: Plume management kits are available for the 60/100 horizontal flue option.
Refer to the manual supplied with the Plume management kits for complete
installation instructions
125mm
2,600mm 11,000mm
100mm
125mm
12 i system
570mm
1,070mm
24 i system
570mm
1070mm
125mm
12 i system
N/A
9,000mm
24 i system
N/A
9,000mm
PRE INSTALLATION
100mm
125mm
4,600mm
13,000mm
4,600mm
13,000mm
125mm
6,400mm 15,000mm
125mm
12 i system
4,600mm
13,000mm
24 i system
4,600mm
13,000mm
125mm
12 i system
4,400mm 13,000mm
18 i system
4,400mm 13,000mm
125mm
12 i system
2,600mm
11,000mm
24 i system
2,600mm
11,000mm
12 i system
125mm
2,400mm 11,000mm
17
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
FLUE OPTIONS
PRE INSTALLATION
18
FLUE TERMINAL POSITIONS
PRE INSTALLATION
19
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
ANCILLARY ITEMS
LIFTING AND CARRYING PRECAUTIONS:
Lift only a manageable weight, or ask for
help.
When lifting or putting things down, bend
the knees, and keep the back straight
and feet apart.
Do not lift and twist at the same time.
Lift and carry objects close to the body
A - Straps
B - Outer carton
C - Installer pack
D - Bottom panel
B
G - Inner packaging
H - Front fascia panel
J - Syphon assembly
INSTALLATION
3
C
D
F
20
UNPACKING WALL FRAME AND
ANCILLARY ITEMS
X4
X4
SAFETY:
All relevant safety precautions must be undertaken.
Protective clothing, footwear, gloves and safety
goggles must be worn as appropriate.
USE APPROPRIATE
FIXINGS FOR
WEIGHT AND
WALL TYPE
COMMISSIONING
189mm
INSTALLATION
21
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
A - Outer carton
5
B
B
C
6.1
6.2
INSTALLATION
22
UNPACKING THE APPLIANCE
BOILER CONNECTIONS
IMPORTANT: IF FITTING OPTIONAL
INTEGRAL DIVERTER VALVE
Disregard this and the following page and
refer to the correct version for installing
t he int egral divert er valve in t he
ADDITIONAL INFORMATION section at the
back of this book.
A
B
INSTALLATION
2&4
22mm
Handling
Hole
22mm
A
B
1
23
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
BOILER CONNECTIONS
BOILER CONNECTIONS
INSTALLATION
7
A
B
C
6
E
F
A
22mm
C
22mm
B
22mm
24
BOILER CONNECTIONS
FLUE INSTALLATION
WALL
HORIZONTAL FLUE
(60/100mm diameter)
For vertical flues and 80/125mm horizontal flues, please
refer to separate instructions supplied with the flue kit.
93mm
Edge of
case
200mm
570mm
350mm
INSTALLATION
189mm
D
E
130mm
MIN
25
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
FLUE INSTALLATION
FLUE INSTALLATION
TOP
110
mm
INSTALLATION
110mm
TOP
VIEW
H
NOTE:
For more information refer to the
60/100 Horizontal Flue kit Instruction Manual
B
C
D
FLUE TERMINAL PLUME RE-DIRECTION:
A
A
180
3
80
26
FLUE INSTALLATION
FLUE INSTALLATION
ASSEMBLING THE FLUE
Apply silicone
grease to seal
INSTALLATION
Flat at back
27
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
FLUE INSTALLATION
CONDENSATE CONNECTION
SUMP
CONNECTION
1
CONDENSATE CONNECTION:
Never terminate or discharge into any open
source, including; sink, bath, shower, bidet,
toilet etc.
Note: Any external condensate pipework
should be protected with weather
resistant insulation to help prevent
freezing.
Ensure that the condensate drain is 22mm
diameter plastic pipe. It must fall at least
50mm per metre towards the outlet.
SUMP
BLANKING CAP
INSTALLATION
DISCHARGE
HOSE
SYPHON
Maintenance
4
DRAINAGE CAP
WALL FRAME
CONNECTOR
28
CONDENSATE CONNECTION
1
A
ELECTRICAL
CAUTION: ISOLATE THE MAINS
ELECTRICITY SUPPLY BEFORE STARTING
ANY WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS
FROSTSTAT
WATER VALVE(S)
TANKSTAT
ROOMSTAT
TIMER
boiler
demand
brown
green/yellow
blue
live
neutral
230V
MAINS
SUPPLY
switched live
earth
INSTALLATION
SYSTEM
WIRING
CENTRE
5 Refit panels.
F1
F3
F2
NOTES:
External diverter valve(s) and all other 230V
parts are not supplied with the boiler.
A fascia mounted programmer/timer cannot be
fitted unless optional integral diverter
valve is used (see instructions at the rear of
this manual).
Refer to manufacturers instructions when
connecting external parts to the wiring centre.
Worcester, Bosch Group cannot be held
responsible for wiring errors.
There is an option to fit an internal diverter
valve. This also requires fitting an extra
harness and a code plug change. See
Optional Diverter Valve Section in these
instructions or the instructions supplied with
the integral diverter valve kit.
This option is also covered in the Fault
Finding Guide on page 55 of these instructions.
29
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
ELECTRICAL
POSITION OF WIRED
COMMISSIONING
INSTALLATION
COMPONENTS
30
POSITION OF WIRED COMPONENTS
PRE-COMMISSIONING
CHECKS
CAUTION: ISOLATE THE MAINS
SUPPLIES BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS
1 Check that the service and water pipes are
connected to the correct position on the
manifold.
A - Flow (22mm)
B - Return (22mm)
C - Gas inlet (22mm)
A
22mm
C
22mm
B
22mm
COMMISSIONING
H
3
Condensate pipe
Preplumbing manifold
connector
31
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
PRE-COMMISSIONING CHECKS
COMMISSIONING
32
FILLING THE SYSTEM
A - On/off button
B - On/off and fault indicator (BLUE)
C - Central heating temperature control
D - Burner indicator (GREEN)
E - Reset button
F - Service button
G - Not used
H - System pressure gauge
I - Cover or optional programmer
33
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
WATER TREATMENT
IMPORTANT: ARTIFICIALLY SOFTENED WATER
MUST NOT BE USED TO FILL THE CENTRAL
HEATING SYSTEM.
COMMISSIONING
34
WATER TREATMENT
COMMISSIONING
D
F
SIT VALVE
A - On/off button
B - On/off and fault indicator (BLUE)
C - Central heating temperature control
D - Burner indicator (GREEN)
E - Reset button
F - Service button
COMMISSIONING
G - Not used
H - System pressure gauge
I - Cover or optional programmer
Inlet Test Nipple
DUNGS VALVE
35
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
COMMISSIONING
FINISHING COMMISSIONING
The boiler has been factory set, so there should
be no need to adjust any controls.
REPLACE OUTER CASING:
1 Replace outer casing making sure that the
securing points are properly located.
Replace top two screws (A).
Re-tighten bottom two screws (B).
A
A
COMMISSIONING
HANDOVER:
Complete the Benchmark Gas Boiler
Commissioning Checklist.
NOTE: The Benchmark Checklist can be found
at the rear of these instructions.
A
C
D
E
36
FINISHING COMMISSIONING
CAUTION: TURN OFF THE GAS SUPPLY AND ISOLATE THE MAINS
S U P P LI E S B E FOR E STARTI NG ANY WOR K AN D OB S E RVE ALL
RELEVANT SAFETY PRECAUTIONS.
Inspection
Check that the terminal and the terminal
guard, if fitted, are clear and undamaged.
2 If the appliance is in a compartment or
cupboard check that the specified service
space around the appliance is clear.
3 Check all the joints and connections in the
system and remake any that show signs of
leakage. Refill and re-pressurise if
applicable as described in Commissioning.
Operate the appliance and take note of any
irregularities.
Refer to Fault Finding for rectification
procedures.
SERVICING
& SPARES
37
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
1.
1.1
1.2
1.
B
1.3
2.1
SERVICING
& SPARES
2.2
31
38
INSPECTION AND SERVICE
SERVICING
& SPARES
- 3.9 mbar
- 4.1 mbar
2
B
39
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
IMPORTANT:
IF THE JOINT BETWEEN THE
AIR/GAS MANIFOLD AND THE HEAT
EXCHANGER IS DISTURBED THE
SEALING GASKET MUST BE
REPLACED.
AFTER COMPLETING THE
SERVICE OF THE APPLIANCE, THE
CO/CO2 MUST BE CHECKED AND
SET TO THE LIMITS SHOWN IN THE
SETTING THE AIR/GAS RATIO
B
A
SERVICING
& SPARES
D
3
C
40
INSPECTION AND SERVICE
H
4
5
6
I
SERVICING
& SPARES
41
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
R
9
Small
tab
SERVICING
& SPARES
I M P ORTANT: I F TH E JOI NT
BETWEEN THE AIR/GAS MANIFOLD
AN D TH E H EAT E XCHANG E R I S
DISTURBED THE SEALING GASKET
MUST BE REPLACED.
42
INSPECTION AND SERVICE
REPLACEMENT OF PARTS
CAUTION: TURN OFF THE GAS SUPPLY AND ISOLATE THE MAINS
S U P P LI E S B E FOR E STARTI NG ANY WOR K AN D OB S E RVE ALL
RELEVANT SAFETY PRECAUTIONS.
1.1
1.2
2. Primary sensor
Remove electrical connection (B) by pulling
upwards. Squeeze retaining clip on plastic
moulding (C) and pull sensor (D) upwards
until clear of pocket in heat exchanger.
Coat new sensor with heat conductive
paste and replace.
3. Overheat thermostat
2
B
C
SERVICING
& SPARES
4.2
43
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
5.1
REPLACEMENT OF PARTS
SIT AND DUNGS VALVES
5.2
6.1
6. Gas valve*
SERVICING
& SPARES
6.2
6.3
44
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
A
7
8. PCB fuse
Remove fuse F1 (B) from the PCB and
replace.
There is a spare fuse clipped into the
underside of the electrical cover.
8.Transformer
SERVICING
& SPARES
45
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
10
10.1
C
10.2
NOTE:
After re-assembly, check the CO/CO2
levels as described in the setting of the
air/gas ratio section.
F
E
SERVICING
& SPARES
10.3
46
REPLACEMENT OF PARTS
11.1
A
REPLACEMENT OF PARTS
The following components require
the air / gas manifold and fan
assembly to be removed:
Pressure switch
Fan
Electrode assembly
Burner
Heat exchanger
11.2
B
11.3
I M P ORTANT: I F TH E JOI NT
BETWEEN THE AIR/GAS MANIFOLD
AN D TH E H EAT E XCHANG E R I S
DISTURBED THE SEALING GASKET
MUST BE REPLACED.
IMPORTANT: AFTER REASSEMBLY
TH E C OM B USTION M UST B E
CH ECK E D US I NG TH E P RO CEDURE IN THE SECTION SETTING
THE GAS AIR RATIO. MEASUREMENT AND SETTING (IF NECESSARY) OF THE GAS RATIO MUST
NOT BE ATTEMPTED UNLESS THE
P E R SON I S EQU I P P E D W ITH A
C OM B USTION ANALYS E R C ONFORMING TO BS 7927 AND IS COMPETENT IN ITS USE.
SERVICING
& SPARES
47
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
12.1
12.2
12.3
13
12. Fan
14. Burner
Remove seal (F) from the top of the heat
exchanger.
Remove burner (G).
Replace new burner in correct position.
Ensure that burner tab fits correctly into hole.
Ensure that the seal is replaced with a new one.
Check CO/CO 2 levels as described in
the setting the air/gas ratio section.
14
SERVICING
& SPARES
15.4
15.1
15.2
15.3
48
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
16.1
NOTE:
Removal of the syphon assembly will give access
to Auto air vent.
To release the syphon from the sump connection,
pull towards you (A).
Disconnect the discharge hose (B) at the
plumbing manifold.
Remove the complete syphon assembly.
17.1
SERVICING
& SPARES
18.1
18.2
49
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
19.1
REPLACEMENT OF PARTS
19.2
SERVICING
& SPARES
21.1
21.2
50
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
22.1
22.2
23.1
SERVICING
& SPARES
23.2
51
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
REPLACEMENT OF PARTS
24.1
24.2
25.1
25.2
SERVICING
& SPARES
25.3
Removing boiler
Isolate electrical supply.
Isolate system and gas connections at the
service valves.
Drain boiler.
Disconnect electrical supply and any external
controls.
Disconnect flue connection from the boiler.
Undo connection to boiler at the service valves.
Remove clip from expansion vessel
connection to the boiler.
Gently raise the boiler off the mounting frame.
Replace expansion vessel and refit the boiler
to the mounting frame.
Follow the commissioning procedure in this
manual.
52
REPLACEMENT OF PARTS
THIS PAGE SHOWS THE SETTING PROCEDURE FOR THE SIT VALVE
FOR ALTERNATIVE VALVES SEE PAGE 54 FOR DUNGS VALVE.
Max
B
Min
C
26.1
26.2
26.3
Max
B
CO2 setting
minimum
Natural gas
9.8% 0.5%
9.2% 0.5%
Gas type
A
LPG
26.4
D
SERVICING
& SPARES
26.5
Min
C
53
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
26.1
26.2
26.3
CO2 setting
maximum
CO2 setting
minimum
Natural gas
9.8% 0.5%
9.2% 0.5%
B
SERVICING
& SPARES
LPG
26.4
D
26.5
54
REPLACEMENT OF PARTS
SIT
Fan
WORCESTER Part No. 8 717 204 453 0
GC No.
H26 536
2 Burner
WORCESTER Part No. 8 718 120 609 0
GC No.
H26 538
3 Gas valve
NG WORCESTER Part No. 8 716 107 052 0
NG GC No.
H26 540
LPGWORCESTER Part No. 8 716 107 053 0
LPGGC No.
H26 539
4 Control box
WORCESTER Part No. 8 716 109 539 0
GC No.
H28 966
5 Flue overheat thermostat (Grommet type)
WORCESTER Part No. 8 717 206 213 0
1
Expansion vessel
WORCESTER Part No. 8 716 105 545 0
GC No.
H05 206
Electrodes
WORCESTER Part No. 8 718 107 087 0
GC No.
H26 544
Gasket - burner/electrodes
WORCESTER Part No. 8 716 106 506 0
GC No.
H26 545
Seal - inner case/mantel
WORCESTER Part No. 8 716 106 635 0
GC No.
H26 546
10
11
12
13
14
16
17
12 By-pass valve
WORCESTER Part No. 8 716 106 434 0
GC No.
H02 532
13 Diverter valve assembly
WORCESTER Part No. 8 716 106 845 0
GC No.
H02 533
14 Diverter valve motor
WORCESTER Part No. 8 716 106 847 0
GC No.
H02 534
15 Control sensor - primary
WORCESTER Part No. 8 716 106 688 0
GC No.
H26 542
16 High limit stat
WORCESTER Part No. 8 707 206 196 0
GC No.
H26 584
15
18
F1
19
20
F2
F3
SERVICING
& SPARES
11 Pressure gauge
WORCESTER Part No. 8 717 208 107 0
GC No.
H02 528
55
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
REPLACEMENT OF PARTS
1.1
1.2
L. P. G. CONVERSION
I S O LATE
MAI N S
E LE CTR I C AL
SUPPLY AND REMOVE OUTER CASE
AS SHOWN IN THE INSTALLATION,
C O M M I S S I O N I N G & S E RVI C I N G
INSTRUCTIONS
2.1
2.2
2.3
2. Gas valve
3.1
3.2
E
D
Code plugs
12kW NG
12kW LPG
24kW NG
24kW LPG
12kW NG
12kW LPG
24kW NG
24kW LPG
TH E AI R / GAS R ATI O M U ST B E
R ESET AFTE R CONVE R SION. TH E
P R O C E D U R E C AN B E F O U N D I N
THE SETTING THE AIR/GAS RATIO
SECTION OF THIS MANUAL.
56
LPG CONVERSION
CONVERSION
KITS
3. Code plug
FAULT FINDING
NOTE : This fault finding information is for guidance only. Worcester cannot be held responsible for costs incurred by persons not deemed
to be competent.
The electronic control system for this boiler incorporates a blue central indicator. This normally confirms the permanent mains supply but, by
flashing at different rates during a fault, provides a guide to the cause as listed.
This fault finding system assumes that the appliance has been operating normally until the time of failure (i.e. not a first installation error).
PRELIMINARY CHECKS : Preliminary electrical system checks are the first electrical checks to be carried out during a fault-finding
procedure. On completion of the Service/Fault-Finding task which has required the breaking and remaking of electrical connections, check
(a) EARTH CONTINUITY, (b) SHORT CIRCUIT CHECK, (c) POLARITY and (d) RESISTANCE TO EARTH.
Blue light
indication
Lockout reset
button
Fault
Possible solution/check
Off
Off
On
Off
Boiler operating
without live demand at
ST10-LR (from external
roomstat timer).
Slow flash
Ignition lockout
Flue overheat
(normally off,
flashes on)
Slow flash
(normally on,
FAULT FINDING
& DIAGRAMS
flashes off)
Fast flash
Off
Flue blockage
Volatile lockout
Fast flash
2 pulses
5 pulses
Flashing
No light
No light
Internal fault
Not a fault code
Not a fault code
Water pressure.
All air vented.
Pump / harness / connections.
Water leaks / blockages.
Safety thermostats / low voltage wiring harness / connections.
Otherwise replace control board.
Blockage in flue system.
Temperature sensor (8000-20,000).
Low voltage wiring harness / connections to sensor.
Fan / fan harness / connections to fan.
Code plug fitted.
Replace control board
Service mode selected to min, press service button to return to normal.
Service mode selected to max, press service button to return to normal.
57
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
FAULT FINDING
58
BOILER FUNCTION
BLUE
LIGHT
ON
FAULT FINDING
& DIAGRAMS
POWER
SWITCH
ON
System demand
at ST10
AND
temperature
control knob
ON
Fan to
start
speed.
LOCKOUT
YES
Diverter valve
in CH position
Pump ON
when optional
integral valve
is used.
BOILER
DEMAND
3 minute wait
5th
attempt?
NO
Spark
ignition
4 seconds
Stop spark.
Wait
10 seconds
NO
BURNER
LIT?
IGNITION SEQUENCE
IGNITION
SEQUENCE
(see detail)
GREEN
FLAME
LIGHT
ON
YES
10 second
stabilisation
period.
Gas valve
OFF
Pump run 3
minutes
Fan run 30
seconds
END OF
BOILER
DEMAND
BOILER FUNCTION
PROTECTION FUNCTION
Run autofroststat
function
Pump antiseize
FAULT FINDING
& DIAGRAMS
Boiler temperature
below 8C
59
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
PROTECT FUNCTION
THESE ADDITIONAL
INSTRUCTIONS
MUST BE USED IN
CONJUNCTION WITH
THE MAIN
INSTRUCTION MAN UAL
INSTALLATION,COMMISSIONING
& SERVICING
UK/IE
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22mm compression fittings
Gas:
22mm compression fittings
Cylinder Return 15mm compression fittings
Flow 22mm
Cylinder Return
15mm
CH Return 22mm
PRE INSTALLATION
B
A
Flow 22mm
CH Return 22mm
Mains Gas
Supply 22mm
Cylinder
Return 15mm
16
PLUMBING MANIFOLD
BOILER CONNECTIONS
INSTALLATION
C
C
4.1
23A
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
BOILER CONNECTIONS
BOILER CONNECTIONS
A
D
A - Flow (22mm)
B - CH return (22mm)
C - Gas inlet (22mm)
D - Cylinder return (15mm)
INSTALLATION
IMPORTANT:
Before hanging the boiler onto the wall
mounting frame ensure that the pressure relief
valve connection is in the DOWN position. This
is located on the right hand side of the wall
frame at the rear.
6. Pull the extended tab/lever forward and
down until there is no further travel.
6
6&8
22mm
22mm
bonded
washer
15mm
Handling
Hole
22mm
A
B
D
23B
BOILER CONNECTIONS
BOILER CONNECTIONS
9
INSTALLATION
H
11
A
10
C
D
A
22mm
C
22mm
D
15mm
B
22mm
24
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
BOILER CONNECTIONS
INSTALLATION
2
B
26A
BOILER CONNECTIONS
ELECTRICAL
ROOMSTAT
FROSTSTAT 5
TANKSTAT
brown
blue
green/yellow
neutral
230V
MAINS
SUPPLY
live
switched live
calling
ST8
ST6
ST10
F1
F3
F2
INSTALLATION
ELECTRICAL
POSITION OF WIRED
INSTALLATION
COMPONENTS
30
POSITION OF WIRED COMPONENTS
PRE-COMMISSIONING
1
A
B
CHECKS
B
D
A
22mm
C
22mm
D
15mm
COMMISSIONING
B
22mm
Condensate pipe
Preplumbing manifold
connector
31
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167a (06/2008)
POWER
SWITCH
ON
BLUE
LIGHT
ON
FAULT FINDING
& DIAGRAMS
Room
thermostat ON
(and/or link fitted
at ST10)
AND
Facia mounted
programmer ON
AND
Temperature
control
ON
BOILER FUNCTION
Fan to
start
speed.
58
LOCKOUT
YES
Diverter valve
in CH position
Pump ON.
CENTRAL
HEATING
DEMAND
3 minute wait
5th
attempt?
NO
Spark
ignition
4 seconds
Stop spark.
Wait
10 seconds
NO
BURNER
LIT?
IGNITION SEQUENCE
IGNITION
SEQUENCE
(see detail)
GREEN
FLAME
LIGHT
ON
YES
10 second
stabilisation
period.
Gas valve
OFF
Pump run 3
minutes
Fan run 30
seconds
END OF
BOILER
DEMAND
BOILER FUNCTION
Pack Number
No HW or CH demand
Is there a demand from external controls? To eliminate the boiler as a fault,
remove the switched live from the wiring centre to LR on ST10, then fit a link
between the Ls and LR. If the boiler and pump run normally then it is likely
there is a fault with the external controls. Please contact your electrician.
General checks
1. Is all the air bled from the gas supply?
2. Is all the air bled from the primary water system?
3. Is there 230v ac across the boiler live and neutral terminals?
(L & N on ST10)
4. Is the polarity correct?
5. Is the incoming gas pressure at least 18mbar with the boiler at maximum
output?
www.worcester-bosch.co.uk
8 716 115 167a (06/2008)
CONTACT INFORMATION
WORCESTER, BOSCH GROUP:
TECHNICAL:
08705 266241
SERVICE:
08457 256206
SPARES:
01905 752571
LITERATURE:
01905 752556
TRAINING:
01905 752526
SALES:
01905 752640
WEBSITE: www.worcester-bosch.co.uk