Key Plan: W-11 Match To Existing Finish
Key Plan: W-11 Match To Existing Finish
Key Plan: W-11 Match To Existing Finish
STRUCTURAL CONSULTANT:
ELECTRICAL CONSULTANT:
PLUMBING CONSULTANT:
HVAC CONSULTANT:
NOTES:
1.
0.00.
2. DRAWING TO BE READ IN CONJUNCTION WITH
RELEVANT CONSULTANTS' DRAWINGS.
3. ANY DISCREPANCIES TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECT.
4. DRAWING TO BE READ AND NOT SCALED.
5. ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED.
6. ALL DIMENSIONS TO BE VERIFIED ON THE SITE BY THE
SITE ENGINEER.
7. ALL LEVELS ARE FINISHED LEVELS.
8. THE DRAWING IS THE COPYRIGHT OF THE
ARCHITECT AND SHOULD NOT BE USED FOR ANY
OTHER PURPOSE.
KEY PLAN
CODE
MATERIAL
W-01
PAINT
W-02
GLAZING + FROSTING
AS/DESIGN
W-03
TILE
W-04
W-05
FABRIC
W-06
W-07
MIRROR PANELLING
W-08
W-09
W-10
MODULAR PARTITION
PREPARED BY:
CHECKED BY:
W-11
APPROVED BY:
01
NORTH
CLIENT:
SUN PHARMACEUTICAL INDUSTRIES LTD
PROJECT:
R&D CENTER BLOCK-II
AT VILLAGE SARHAUL- GURGAON
PROJECT TITLE :
PROJECT NUMBER :
DATE :
DRAWN BY :
CHECKED BY :
DRAWING NUMBER:
SCALE :
103 - SPG
18.08.2015
KP
DK
SP-WF-01
1:75 REV. NO. :
--