1. The document describes the construction of a flat roof using a half-monolithic slab system ("LMT") with concrete beams spaced 40cm apart and filled with concrete blocks. 2. Reinforcing details are provided for the beams and slabs. Beams use class A1 rebar and additional rebar is added based on calculations. Slabs are reinforced in the middle with mesh. 3. Load calculations are provided for various span lengths between 0.5-6.2m, accounting for insulation, slab self-weight, ceiling loads, and usable loads. Required reinforcing areas are specified for each case.

Uploaded by

Stojkovic Cale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views152 pages

Antic St3

1. The document describes the construction of a flat roof using a half-monolithic slab system ("LMT") with concrete beams spaced 40cm apart and filled with concrete blocks. 2. Reinforcing details are provided for the beams and slabs. Beams use class A1 rebar and additional rebar is added based on calculations. Slabs are reinforced in the middle with mesh. 3. Load calculations are provided for various span lengths between 0.5-6.2m, accounting for insulation, slab self-weight, ceiling loads, and usable loads. Required reinforcing areas are specified for each case.

Uploaded by

Stojkovic Cale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 152

POS 100 +

/ KONSTRUKCIJA IZNAD SPRATA /

TAVANICA

USVAJA SE POLUMONTA@NA TAVANICA "LMT". TAVANICA SE SASTOJI OD GREDICA /NOSA^A/


NA RAZMAKU OD B=40cm / izme|u kojih se postavljaju blokovi ispune dimenzija 28x25x16cm /
I ARMIRANO BETONSKE PLO^E /dpl = 4cm, MB 30 / LIVENE NA LICU MESTA /Huk = 20cm/.
OSNOVNA ARMATURA GREDICA JE VARENA ^ELI^NA RE[ETKA (7/7/4) Aa1 =2F7 (GA 500/560)
DODATNA ARMATURA Aa2 JE REBRASTA RA 400/500/prema prora~unu/.
A.B. PLO^A ARMIRA SE U POLOVINI VISINE MRE@OM Aam =Q 131 (MAG 500/560).
TAVANICE RASPONA Lo > 4m, OJA^AVAJU SE PO SREDINI REBROM ZA UKRU]ENJE b/d=15/20cm
ARMIRANIM SA 2RF8 ; Uz F6/25.(Za raspone preko 5m zadati nadvi{enje L/300).
ISPOD PREGRADNIH ZIDOVA PARALELNIH SA PRAVCEM NO[ENJA TAVANICE, IZVODI SE
SKRIVENA A.B. GREDA /armirana prema prora~unu/ ILI SE UDVOJE GREDICE.

POS 101 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 4.41

qu =
Au=Bu=

8.30 KN/m'
18.30 kN/m'

Ag =
Bg =
Ap=Bp=

7.72 kN/m'
7.72 kN/m'
3.31 kN/m'

lo =
4.20
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
20.177 KNm
za jednu gredicu:
Aa = 1.177 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 1RF10 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 101a - LMT 40 , d =16+4= 20cm , MB 2014.00


, fb =
Gu
qu
A

3.20
L = 4.41

Ag =
Bg =
Ap=Bp=

11.56 kN/m'
17.88 kN/m'
3.31 kN/m'

Au =

24.45 kN/m'

lo =
4.20
1) Termoizolacija
0.10
2) LMT konstrukcija
3.00
3) Plafon
0.40
g=
3.50
4) Krov
G=
14.00
5) Korisno
p=
1.50
qu=1.6*g+1.8*p=
8.30
Gu =
22.40
maxMu=
35.700
za jednu gredicu:
Aa = 2.684
Aa1 = 2F7 (GA 500/560)

m
KN/m2
kN/m2
kN/m2
kN/m2
kN
kN/m2
kN/m'
kN
kNm
cm2

Bu =

34.56 kN/m'

Aa2 = 2RF12 (RA 400/500)


Aam= Q 131 (MA 500/560)

POS 102 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 4.25

qu =
Au=Bu=

8.30 KN/m'
17.65 kN/m'

Ag =
Bg =
Ap=Bp=

7.44 kN/m'
7.44 kN/m'
3.19 kN/m'

lo =
4.05
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
18.762 KNm
za jednu gredicu:
Aa = 1.092 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 1RF10 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 103 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 2.50

qu =
Au=Bu=

8.30 KN/m'
10.37 kN/m'

Ag =
Bg =
Ap=Bp=

4.37 kN/m'
4.37 kN/m'
1.87 kN/m'

lo =
2.38
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
6.479 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

POS 104 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 2.15

qu =
Au=Bu=

8.30 KN/m'
8.93 kN/m'

Ag =
Bg =
Ap=Bp=

3.77 kN/m'
3.77 kN/m'
1.61 kN/m'

lo =
2.05
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
4.807 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

POS 105 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 3.73

qu =
Au=Bu=

8.30 KN/m'
15.47 kN/m'

Ag =
Bg =
Ap=Bp=

6.52 kN/m'
6.52 kN/m'
2.80 kN/m'

lo =
3.55
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
14.415 KNm
za jednu gredicu:
Aa = 0.820 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 1RF8 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 106 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =

lo =
2.20
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
5.536 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

qu
A

B
L = 2.31

qu =
Au=Bu=

8.30 KN/m'
9.59 kN/m'

Ag =
Bg =
Ap=Bp=

4.04 kN/m'
4.04 kN/m'
1.73 kN/m'

POS 107 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =

lo =
2.70
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
8.339 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

qu
A

B
L = 2.84

qu =
Au=Bu=

8.30 KN/m'
11.77 kN/m'

Ag =
Bg =
Ap=Bp=

4.96 kN/m'
4.96 kN/m'
2.13 kN/m'

POS 108 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =

lo =
5.45
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
33.975 KNm
za jednu gredicu:
Aa = 1.973 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF10 (RA 400/500)
Aam= Q 131 (MA 500/560)

qu
A

B
L = 5.72

qu =
Au=Bu=

8.30 KN/m'
23.75 kN/m'

Ag =
Bg =
Ap=Bp=

10.01 kN/m'
10.01 kN/m'
4.29 kN/m'

POS 108a - AB Skrivena greda , MB 20, RA 400/500,


lo =

Pu

A
2.50

Au=
Bu=
max

5.45

21.02
22.06
0.51

m
qu
B

0.90
5.72
kN
kN
MPa < 0.80 MPa
3R F 14

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Gb+Pd/krov/

30
20

cm
cm

1.50 kN/m'
9.20 kN

qu=1.6g+1.8p=
2.40
Pu= 14.72 kN
maxMu =
45.10 kNm

USVOJENO: Aa = 6RF 14

kN/m'

20

uz = F6 /20
(Dvojno armiran presek)

uz F6
6R F 14

30

POS 109 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 6.20

qu =
Au=Bu=

8.30 KN/m'
25.71 kN/m'

Ag =
Bg =
Ap=Bp=

10.84 kN/m'
10.84 kN/m'
4.65 kN/m'

lo =
5.90
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
39.817 KNm
za jednu gredicu:
Aa = 2.350 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF12 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 110 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 0.53

qu =
Au=Bu=

8.30 KN/m'
2.18 kN/m'

Ag =
Bg =
Ap=Bp=

0.92 kN/m'
0.92 kN/m'
0.39 kN/m'

lo =
0.50
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
0.286 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

POS 111 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 4.91

qu =
Au=Bu=

8.30 KN/m'
20.37 kN/m'

Ag =
Bg =
Ap=Bp=

8.59 kN/m'
8.59 kN/m'
3.68 kN/m'

lo =
4.68
m
1) Termoizolacija
0.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
3.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
5.00 KN/m2
maxMu=
24.999 KNm
za jednu gredicu:
Aa = 1.438 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF8 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 112 - LMT 40 , d =16+4= 20cm , MB 20 ,14.00


fb =
qu
A

B
L = 4.20

qu =

8.30 KN/m'

lo =
1) Termoizolacija
2) LMT konstrukcija
3) Plafon
g=
4) Korisno
p=
q=

4.00
0.10
3.00
0.40
3.50
1.50
5.00

m
KN/m2
KN/m2
KN/m2
KN/m2
KN/m2
KN/m2

Au=Bu=

17.43 kN/m'

Ag =
Bg =
Ap=Bp=

7.35 kN/m'
7.35 kN/m'
3.15 kN/m'

maxMu=
18.302 KNm
za jednu gredicu:
Aa = 1.063 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 1RF8 (RA 400/500)
Aam= Q 131 (MA 500/560)

POS 112a - AB Skrivena greda , MB 20, RA 400/500,


lo =

Pu

A
2.1
Au=
Bu=
max

4.00

14.51
14.51
0.40

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Krov

m
qu
B

2.10
4.20
kN
kN
MPa < 0.80 MPa

25
20

cm
cm

1.25 kN/m'
12.50 kN

qu =
Pu=

2.00
20.63

kN/m'
kN

maxMu =
Aa =

26.10
4.99

kNm
cm2

2R F 12

20

USVOJENO: Aa = 3RF 14
uz = F6 /20

uz F6
3R F 14

25

POS 113 -AB Konzolna plo~a, MB 20, GA 240/360 dpl =


lo =

Gu

qu
A
L = 0.74
Ag =
Ap =

2.71
0.74

KN/m'
KN/m'

Au =
Mumax=

5.66
2.46

KN/m'
KNm

h=
b=
fb=

cm

0.075
1.00
12.5

m
m
Mpa

Analiza optere}enja:
1) Sopstvena te`ina
2.50 KN/m2
2) Malter
0.30 KN/m2
g=
2.80 KN/m'
3) Bet.ograda
0.65 KN/m'
Gu=1.6G
1.04 KN
4) Korisno
p=
1.00 KN/m2
qu=1.6g+
6.28 KN/m'
k = 5.345
3.659
Aa=
1.43 cm2
Ap=
0.29 cm2
ea=
35 cm
ep=
98 cm
USVOJENO: Aa= F 8 /15cm (Gore glavna)
Ap= F 6/ 20cm (podeona)

35
5

70
F 6/15cm

10

0.70 m

25
F 8/30cm
F 8/30cm

G 101 - AB Greda , MB 20, RA 400/500,


lo =

1.20

qu
A

B
L = 1.26

Au=
Bu=
max

14.74
14.74
0.41

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 106
3) POS 107

25
20

cm
cm

1.25 kN/m'
9.60 kN/m'
11.80 kN/m'

qu=1.6g+
23.40 kN/m'
Mu =
4.64
kNm

2R F 12

Aa =
20

0.76

cm2

uz F6

USVOJENO: Aa = 2RF 12
uz =F6 /20

2R F 12

25

G 102 - AB skrivena vezna greda , MB 20, RA 400/500,


lo =

4.20

b=
d=

25
20

cm
cm

2R F 12

20

USVOJENO: Aa = 2RF 12
uz = F6 /20

uz F6
2R F 12

25

G 103 - AB Greda , MB 20, RA 400/500,


lo =

2.20

qu
A

B
L = 2.31

Au=
Bu=
max

17.94
17.94
0.62

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 104
3) Krov

20
20

1.00 kN/m'
8.93 kN/m'
5.00 kN/m'

qu=1.6g+
15.53 kN/m'
Mu =
10.36 kNm

2R F 12

Aa =
20

2.35

cm2

uz F6
3R F 12

20

cm
cm

USVOJENO: Aa = 3RF 12
uz =F6 /20

G 104 - AB Greda-nadvratnik , MB 20, RA 400/500,


lo =

2.20

qu
A

1)
2)
3)
4)

B
L = 2.31

Au=
Bu=
max

21.25
21.25
0.59

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
Sopst. te`ina
Zid
Krov
Serkla`

25
20
1.25
4.00
5.00
1.25

cm
cm
kN/m'
kN/m'
kN/m'
kN/m'

qu=1.6g+
18.40 kN/m'
Mu =
12.27 kNm

2R F 12

Aa =
20

2.09

cm2

uz F6

USVOJENO: Aa = 2RF 12
uz =F6 /20

2R F 12

25

G 105 - AB Greda , MB 20, RA 400/500,


lo =

2.40

qu
A

1)
2)
3)
4)

B
L = 2.52

Au=
Bu=
max

38.49
38.49
0.48

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
Sopst. te`ina
POS 102
Krov
POS 113

25
40

cm
cm

2.50
17.65
2.00
5.70

kN/m'
kN/m'
kN/m'
kN/m'

qu=1.6g+
30.55 kN/m'
Mu =
24.25 kNm

2R F 12

Aa =

9.39

cm2

LMT
uz F6
2 F 10

40

USVOJENO: Aa = 4RF 12
uz =F6 /20

4R F 12

25

G 106 - AB Greda , MB 20, RA 400/500,


lo =

2.20
qu

b=
d=
Analiza optere}enja:
1) Sopst. te`ina

25
20

cm
cm

1.25 kN/m'

2) POS 102

17.65 kN/m'

L = 2.31
Au=
Bu=
max

22.70
22.70
0.63

kN
kN
MPa < 0.80 MPa

qu=1.6g+
19.65 kN/m'
Mu =
13.11 kNm

2R F 12

Aa =
20

2.24

cm2

uz F6

USVOJENO: Aa = 3RF 12
uz =F6 /20

3R F 12

25

G 107 - AB greda , MB 20, RA 400/500,


lo =

0.88

b=
d=

25
40

cm
cm

2R F 12

LMT
uz F6
2 F 10

40

USVOJENO: Aa = 2RF 12
uz = F6 /20

2R F 12

25

G 108 - AB Greda , MB 20, RA 400/500,


lo =

4.10

qu
A

B
L = 4.31

Au=
Bu=
max

31.21
31.21
0.39

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 113
3) Krov

25
40

cm
cm

2.50 kN/m'
5.70 kN/m'
3.00 kN/m'

qu=1.6g+
14.50 kN/m'
Mu =
33.59 kNm

2R F 12

Aa =

3.78

cm2

LMT
USVOJENO: Aa = 4RF 12
uz =F6 /20

uz F6
2 F 10

40

4R F 12

25

G 109 - AB Greda , MB 20, RA 400/500,


lo =

2.00

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 103

25
40

cm
cm

2.50 kN/m'
10.40 kN/m'

L = 2.10
Au=
Bu=
max

24.47
24.47
0.30

3) Krov
4) POS 113

kN
kN
MPa < 0.80 MPa

2.00 kN/m'
5.70 kN/m'

qu=1.6g+
23.30 kN/m'
Mu =
12.84 kNm

2R F 12

Aa =

2.52

cm2

LMT
USVOJENO: Aa = 3RF 12
uz =F6 /20

uz F6
2 F 10

40

3R F 12

25

G 110 - AB greda , MB 20, RA 400/500,


lo =

4.35
Pu

A
1.9

m
qu
B

2.67
4.57

Au=
Bu=
max

84.09
78.13
1.17

1)
2)
3)
4)

b=
d=
Analiza optere}enja:
Sopst. te`ina
Krov
POS 108a
POS 108

kN
kN
MPa > 0.80 MPa

qu =
Pu=

cm
cm

2.50
8.10
22.10
23.75

kN/m'
kN
kN/m'
kN/m'

27.75
35.47

kN/m'
kN

maxMu = 109.76 kNm


Aa =
8.92
cm2

2R F 14

USVOJENO: Aa = 6RF 14
uz = F6 /20/10

uz F6
2 F 10

40

25
40

6R F 14

25
Neophodno je osiguranje od glavnih napona zatez. koso povijenom a (2RF 14)

G 111 - AB Skrivena greda , MB 20, RA 400/500,


lo =

4.68
Pu

A
2.2

m
qu
B

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Krov

25
20

cm
cm

1.25 kN/m'
10.40 kN

2.71
4.91

Au=
Bu=
max

14.38
12.60
0.40

kN
kN
MPa < 0.80 MPa

qu =
Pu=

2.00
17.16

kN/m'
kN

maxMu =
Aa =

2R F 12

20

26.80
5.18

kNm
cm2

uz F6

USVOJENO: Aa = 5RF 12
uz = F6 /20

5R F 12

25

G 112 - AB greda , MB 20, RA 400/500,


lo =

4.68
Pu

A
2.2

m
qu
B

1)
2)
3)
4)

2.71
4.91

Au=
Bu=
max

68.15
65.26
0.95

b=
d=
Analiza optere}enja:
Sopst. te`ina
Krov
POS 112a
POS 112

kN
kN
MPa > 0.80 MPa

2R F 14

cm
cm

2.50
8.10
14.51
17.50

kN/m'
kN
kN
kN/m'

qu =
Pu=

21.50
27.88

kN/m'
kN

maxMu =
Aa =

97.97
7.8

kNm
cm2

USVOJENO: Aa = 6RF 14
uz = F6 /20/10

uz F6
2 F 10

40

25
40

6R F 14

25
Neophodno je osiguranje od glavnih napona zatez. koso povijenom a (2RF 14)

G 113 - AB greda-serkla` , MB 20, RA 400/500,


lo =

2.25

b=
d=

50
2040

cm
cm

2R F 12

LMT
40

3R F 12

USVOJENO: Aa = 3RF 12
uz = F6 /20

uz F6
3R F 12

50

G 114 - AB greda , MB 20, RA 400/500,


lo =

2.70

b=
d=

25
40

cm
cm

2R F 12

LMT
uz F6
2 F 10

40

USVOJENO: Aa = 2RF 12
uz = F6 /20

2R F 12

25

G 115 - AB greda , MB 20, RA 400/500,


lo =

5.70
Pu

A
3.5

m
qu
B

2.49

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 111
3) G 111

25
40

cm
cm

2.50 kN/m'
20.40 kN/m'
14.40 kN

5.99
Au=
Bu=
max

79.00
81.44
1.13

kN
kN
MPa > 0.80 MPa

qu =
Pu=

40

kN/m'
kN

maxMu = 127.80 kNm


Aa =
10.8
cm2

2R F 14

uz F6
2 F 10

24.40
14.40

USVOJENO: Aa = 7RF 14
uz = F6 /20/10

7R F 14

25
Neophodno je osiguranje od glavnih napona zatez. koso povijenom a (2RF 14)

G 116 - AB Greda -nadvratnik , MB 20, RA 400/500,


lo =

2.40

b=
d=

25
40

2R F 12

40

uz F6
2 F 10

USVOJENO: Aa = 2RF 12
uz = F6 /20/10

cm
cm

2R F 12

25

G 117 - AB Greda , MB 20, RA 400/500,


lo =

3.90

qu
A

B
L = 4.10

Au=
Bu=
max

27.23
27.23
0.34

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 113
3) Krov

25
40

cm
cm

2.50 kN/m'
5.70 kN/m'
2.00 kN/m'

qu=1.6g+
13.30 kN/m'
Mu =
27.88 kNm

2R F 12

Aa =

3.15

cm2

LMT
USVOJENO: Aa = 3RF 12
uz =F6 /20

uz F6
2 F 10

40

3R F 12

25

G 118 - AB Greda , MB 20, RA 400/500,


lo =

4.40

qu
A

B
L = 4.62

Au=
Bu=
max

30.72
30.72
0.38

kN
kN
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 113
3) Krov

25
40

cm
cm

2.50 kN/m'
5.70 kN/m'
2.00 kN/m'

qu=1.6g+
13.30 kN/m'
Mu =
35.49 kNm

2R F 12

Aa =

3.78

cm2

LMT
USVOJENO: Aa = 4RF 12
uz =F6 /20

uz F6
2 F 10

40

4R F 12

25

G 119 - AB greda sa prepustima, MB 20, RA 400/500,


Pu2

qu

Pu
A
1

Pu1
'1)
2)
3)
4)
5)
6)
6)
6)

B
1.6

1.65

1.2

5.45
Au= 122.47 kN
Bu= 143.77 kN
max
0.73
MPa < 0.80 MPa
MAu =
MBu =
MABu =

-50.20
-68.54
26.20

kNm
kNm
kNm

b=
d=
Analiza optere}enja:
Sopst. te`ina
Krov
POS 112a
POS 112
POS 113
G 117
G 118
Gb
qu =
Pu=
Pu1=
Pu2=

65
2040

cm
cm

4.25
2.00
14.51
17.50
5.70
27.23
30.72
4.00
33.20
14.51
37.12
33.63

kN/m'
kN/m'
kN
kN/m'
kN/m'
kN
kN
kN
kN/m'
kN
kN
kN

2R F 12

LMT
40

4R F 12

PRESEK U POLJU A-B :


USVOJENO:
4RF 14 Gore
4RF 14 Dole

U F8/20
uz F6
4R F 12

65

5R F 12

PRESEK NAD OSLONCIMA A i B :

USVOJENO:

LMT
40

5RF 12 Gore
4RF 12 Dole
U F8/10

4R F 12
uz F6
4R F 12

65

G 120 - AB greda , MB 20, RA 400/500,


lo =

0.50

b=
d=

25
40

cm
cm

2R F 12

USVOJENO: Aa = 2RF 12
uz = F6 /20

LMT
uz F6
2 F 10

40

2R F 12

25

G 121 - AB Greda , MB 20, RA 400/500,


lo =

5.90

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 110

25
40

cm
cm

2.50 kN/m'
2.20 kN/m'

L = 6.20
Au=
Bu=
max

19.20
19.20
0.24

kN
kN
MPa < 0.80 MPa

qu=1.6g+
6.20 kN/m'
Mu =
29.74 kNm

LMT

2R F 12

Aa =
uz F6
2 F 10

40

3.78

cm2

USVOJENO: Aa = 4RF 12
uz =F6 /20

4R F 12

25

G 122 - AB Greda , MB 20, RA 400/500,


lo =

5.10

qu
A

B
L = 5.36

Au=
Bu=

55.69
55.69

kN
kN

1)
2)
3)
4)

b=
d=
Analiza optere}enja:
Sopst. te`ina
POS 110
Krov
POS 113
qu=1.6g+

25
40
2.50
5.70
3.00
5.70

cm
cm
kN/m'
kN/m'
kN/m'
kN/m'

20.80 kN/m'

max

0.69

MPa < 0.80 MPa

Mu =

74.56

kNm

5.76

cm2

2R F 12

Aa =
LMT

USVOJENO: Aa = 4RF 14
uz =F6 /20

uz F6
2 F 10

40

4R F 14

25

G 123 - AB Kontinualna greda , MB 20, RA 400/500,


qu
A

B
2.06

1)
2)
3)
4)

C
3.44

Au= 17.20 kN
Bu= 128.59 kN
Cu=
49.5
kN
max
0.90
MPa > 0.80 MPa

b=
d=
Analiza optere}enja:
Sopst. te`ina
POS 111
POS 113
krov
qu=1.6g+

25
40

cm
cm

2.50
20.40
5.70
3.00
35.50

kN/m'
kN/m'
kN/m'
kN/m'
kN/m'

POLJE A - B:
Mu =
4.07
kNm

2R F 12

LMT
Aa =

uz F6
2 F 10

40

1.12

cm2

USVOJENO: Aa = 2RF 12
uz =F6 /20 /10
2R F 12

25

POLJE B - C:
Mu =
34.45 kNm

2R F 12

LMT
40

uz F6
2 F 10

Aa =

3.42

cm2

USVOJENO: Aa = 4RF 12

uz =F6 /20 /10


4R F 12

25

4R F 12

Mu =

OSLONAC B:
-39.90 kNm

LMT
uz F6
2 F 10

40

Aa =

3.48

cm2

USVOJENO: Aa = 4RF 12
uz =F6 /20 /10
2R F 12

25

POS 1 +

/ KONSTRUKCIJA IZNAD PRIZEMLJA /

TAVANICA

USVAJA SE POLUMONTA@NA TAVANICA "LMT". TAVANICA SE SASTOJI OD GREDICA /NOSA^A/


NA RAZMAKU OD B=40cm / izme|u kojih se postavljaju blokovi ispune dimenzija 28x25x16cm /
I ARMIRANO BETONSKE PLO^E /dpl = 4cm, MB 30 / LIVENE NA LICU MESTA /Huk = 20cm/.
OSNOVNA ARMATURA GREDICA JE VARENA ^ELI^NA RE[ETKA (7/7/4) Aa1 =2F7 (GA 500/560)
DODATNA ARMATURA Aa2 JE REBRASTA RA 400/500/prema prora~unu/.
A.B. PLO^A ARMIRA SE U POLOVINI VISINE MRE@OM Aam =Q 131 (MAG 500/560).
TAVANICE RASPONA Lo > 4m, OJA^AVAJU SE PO SREDINI REBROM ZA UKRU]ENJE b/d=15/20cm
ARMIRANIM SA 2RF8 ; Uz F6/25.(Za raspone preko 5m zadati nadvi{enje L/300).
ISPOD PREGRADNIH ZIDOVA PARALELNIH SA PRAVCEM NO[ENJA TAVANICE, IZVODI SE
SKRIVENA A.B. GREDA /armirana prema prora~unu/ ILI SE UDVOJE GREDICE.

POS 1 - LMT 40 , d =16+4= 20cm , MB 20 , 14.00


fb =

lo =
5.45
m
1) Podna konstr.
1.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
4.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
6.00 KN/m2
maxMu=
40.524 KNm
za jednu gredicu:
Aa = 2.377 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF10 (RA 400/500)
Aam= Q 131 (MA 500/560)

qu
A

B
L = 5.72

qu =
Au=Bu=

9.90 KN/m'
28.33 kN/m'

Ag =
Bg =
Ap=Bp=

12.88 kN/m'
12.88 kN/m'
4.29 kN/m'

POS 2 - LMT 40 , d =16+4= 20cm , MB 20 , 14.00


fb =

5.90
m
1) Podna konstr.
1.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
4.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
6.00 KN/m2
maxMu=
47.493 KNm
za jednu gredicu:
Aa = 2.822 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF12 (RA 400/500)
Aam= Q 131 (MA 500/560)

qu
A

B
L = 6.20

qu =
Au=Bu=

9.90 KN/m'
30.67 kN/m'

Ag =
Bg =
Ap=Bp=

13.94 kN/m'
13.94 kN/m'
4.65 kN/m'

lo =

POS 3 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

0.50

m
1)
2)
3)

qu
A

B
0.53

Ag=
Bg=
Ap=
Bp=

1.09
1.09
0.53
0.53

4)

kN/m'
kN/m'
kN/m'
kN/m'

dpl =
b=
Analiza optere}enja :
Sop.te`ina
Malter
Podna konstr.
g=
Korisno
p=
qu=1.6g+

Aa=
Ap=
ea=
ep=
USVOJENO:

Aa=
1.69
0.34
29.63
82.98
A
Ap=

POS 3a - AB Skrivena greda , MB 20, RA 400/500,


5.90
qu

3.75
0.40
1.10
4.15
2.00
2.00

m
qu1

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

10.24 kN/m'

Mu = 0.125 *qu* L2 =

Au=
2.69 kN/m'
Bu=
2.69 kN/m'
max
T / 0.9 * h *b
max
0.02 MPa < 0.80MPa

lo =

15 cm
100 cm

0.35 kNm

1.69
cm2
cm2
cm2
cm
cm
F 8 /15cm
F 6 /20cm

b=
d=
Analiza optere}enja:

60
20

cm
cm

B
L = 6.20

Au=
Bu=
max

52.56
52.56
0.61

1)
2)
3)
4)

kN
kN
MPa < 0.80 MPa

Sopst. te`ina
POS 3
Zid
Zid 1

3.00
2.70
11.20
3.00

qu=1.6g+1.8p=
qu1=1.6g+1.8p=
Mu =

kN/m'
kN/m'
kN/m'
kN/m'

12.30 kN/m'
25.42 kN/m'
67.10 kNm

3R F 12

Aa =
20

12.77

cm2

uz F6
8R F 14

USVOJENO: Aa = 8RF 14
uz =F6 /20

60

POS 4 -AB Konzolna plo~a, MB 20, GA 240/360


lo =

dpl =
15
cm
Analiza optere}enja:
1) Podna konstr.
1.10 KN/m2
2) Sopstvena te`ina
3.75 KN/m2
3) Malter
0.40 KN/m2
g=
5.25 KN/m'
4) Bet.ograda
2.50 KN/m'
Gu=1.6G
4.00 KN
5) Korisno
p=
2.00 KN/m2
qu=1.6g+
12.00 KN/m'
k = 7.213
2.571
Aa=
1.67 cm2
Ap=
0.33 cm2
ea=
30 cm
ep=
84 cm
USVOJENO: Aa= F 8 /15cm (Gore glavna)
Ap= F 6/ 20cm (podeona)

0.50 m
Gu

qu
A
L = 0.53
Ag =
Ap =

5.26
1.05

KN/m'
KN/m'

Au =
Mumax=

10.30
3.75

KN/m'
KNm

h=
b=
fb=

0.125
1.00
12.5

m
m
Mpa

POS 5 - LMT 40 , d =16+4= 20cm , MB 20 , 14.00


fb =

lo =
4.70
m
1) Podna konstr.
1.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
4.50 KN/m2
4) Korisno
p=
1.50 KN/m2
q=
6.00 KN/m2
maxMu=
30.138 KNm
za jednu gredicu:
Aa = 1.764 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 = 2RF8 (RA 400/500)
Aam= Q 131 (MA 500/560)

qu
A

B
L = 4.94

qu =
Au=Bu=

9.90 KN/m'
24.43 kN/m'

Ag =
Bg =
Ap=Bp=

11.10 kN/m'
11.10 kN/m'
3.70 kN/m'

POS 6 - AB MASIVNA PLO^A , MB 20 , GA 240/360


maxlo =

1.35

m
1)
2)
3)

qu
A

B
1.42

Ag=

2.94 kN/m'

4)

dpl =
b=
Analiza optere}enja :
Sop.te`ina
Malter
Podna konstr.
g=
Korisno
p=

15 cm
100 cm
3.75
0.40
1.10
4.15
2.00
2.00

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

Bg=
Ap=
Bp=

2.94 kN/m'
1.42 kN/m'
1.42 kN/m'

qu=1.6g+

10.24 kN/m'

Mu = 0.125 *qu* L2 =

Au=
7.26 kN/m'
Bu=
7.26 kN/m'
max
T / 0.9 * h *b
max
0.06 MPa < 0.80MPa

Aa=
Ap=
ea=
ep=
USVOJENO:

Aa=
1.69
0.34
29.63
82.98
A
Ap=

2.57 kNm

1.69
cm2
cm2
cm2
cm
cm
F 8 /15cm
F 6 /20cm

POS 7 -AB Konzolna plo~a, MB 20, GA 240/360


maxlo =

1.20 m
Gu

qu
A
L = 1.26
Ag =
Ap =

9.12
2.52

KN/m'
KN/m'

Au =
Mumax=

19.12
14.57

KN/m'
KNm

h=
b=
fb=

0.125
1.00
12.5

m
m
Mpa

dpl =
15
cm
Analiza optere}enja:
1) Podna konstr.
1.10 KN/m2
2) Sopstvena te`ina
3.75 KN/m2
3) Malter
0.40 KN/m2
g=
5.25 KN/m'
4) Bet.ograda
2.50 KN/m'
Gu=1.6G
4.00 KN
5) Korisno
p=
2.00 KN/m2
qu=1.6g+
12.00 KN/m'
k = 3.662
7.94
Aa=
5.17 cm2
Ap=
1.03 cm2
ea=
10 cm
ep=
27 cm
USVOJENO: Aa= F 8 /10cm (Gore glavna)
F 8 /10cm (Dole )
Ap= F 6/ 20cm (podeona)
Betonsku ogradu armirati u obe zone F 8 /10cm

POS 8- KRSTATO ARM. PLO^A ;

dpl = 15.00
1)
2)
3)
4)

cm
Analiza optere}enja:
Pod
Malter
Sop.te`ina
Korisno
g=
p=

1.10
0.40
3.75
2.00
5.25
2.00

KN/m2
KN/m2
KN/m2
KN/m2
KN/m2
KN/m2

STATI^KI UTICAJI:
Ly/Lx=
1.25
My
5.00

Mx

Pg=g*Lx*Ly=
Pp=p*Lx*Ly=
uticaji-g:

105.00 KN
40.00 KN
Q=kj*P (kj-tablica)
kx=
0.276
ky=
0.224

4.00
Qxg=
Qyg=
Qxg=

28.98 KN
23.52 KN
5.80 KN/m'

Qyg=

Mx)
My)

uticaji-p:

k=
k=
Mxg =
Myg =
Qxp=
Qyp=
Qxp=
Qyp=

5.88 KN/m'
M=ki*P
0.050
0.036
5.25
3.78
11.04
8.96
2.21
2.24

(ki-tablica)

KNm/m'
KNm/m'
KN
KN
KN/m'
KN/m'

Mxp =
2.00 KNm/m'
Myp =
1.44 KNm/m'
DIMENZIONISANJE:
(MB20)fb=
14.00 Mpa
GA 240/360
PRAVAC X: Mu max=1.6xMg+1.8xMp=

12.00

KNm/m'

k = 4.440
5.426
Aa=
4.11 cm2
ea=
12.15 cm
USVOJENO:
A F 8 /10cm
PRAVAC Y: Mu max=1.6xMg+1.8xMp=

8.64

KNm/m'

F8 / 10
15

k = 5.233
3.788
Aa=
2.87 cm2
ea=
17.41 cm
USVOJENO:
A F 8 /15cm

F8 / 15

Napomena: Svaku drugu {ipku poviti kod oslonaca

POS 9 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

0.75

m
1)
2)
3)

qu
A

B
0.79

Ag=
Bg=
Ap=
Bp=

1.63
1.63
0.79
0.79

Au=
Bu=

4.03 kN/m'
4.03 kN/m'

max

4)

kN/m'
kN/m'
kN/m'
kN/m'

0.04 MPa < 0.80MPa

dpl =
b=
Analiza optere}enja :
Sop.te`ina
Malter
Podna konstr.
g=
Korisno
p=
qu=1.6g+

15 cm
100 cm
3.75
0.40
1.10
4.15
2.00
2.00

10.24 kN/m'

Mu = 0.125 *qu* L2 =

Aa=
Ap=
ea=

Aa=
1.69
1.69 cm2
0.34 cm2
29.63 cm

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

cm2

0.79 kNm

ep=
USVOJENO:

82.98 cm
A F 8 /15cm
Ap= F 6 /20cm

POS 10 -AB Konzolna plo~a, MB 20, GA 240/360


lo =

dpl =
15
cm
Analiza optere}enja:
1) Podna konstr.
1.10 KN/m2
2) Sopstvena te`ina
3.75 KN/m2
3) Malter
0.40 KN/m2
g=
5.25 KN/m'
4) Bet.ograda
2.50 KN/m'
Gu=1.6G
4.00 KN
5) Korisno
p=
2.00 KN/m2
qu=1.6g+
12.00 KN/m'
k = 6.313
2.571
Aa=
1.67 cm2
Ap=
0.33 cm2
ea=
30 cm
ep=
84 cm
USVOJENO: Aa= F 8 /10cm (Gore glavna)
F 8 /10cm (Dole )
Ap= F 6/ 20cm (podeona)
Betonsku ogradu armirati u obe zone F 8 /10cm

0.60 m
Gu

qu
A
L = 0.63
Ag =
Ap =

5.81
1.26

KN/m'
KN/m'

Au =
Mumax=

11.56
4.90

KN/m'
KNm

h=
b=
fb=

0.125
1.00
12.5

m
m
Mpa

POS 11 - AB MASIVNA PLO^A , MB 20 , RA 400/500


lo =

4.15

qu
A

B
4.36

Ag=
Bg=
Ap=
Bp=
Au=
Bu=
max

7.84
7.84
3.27
3.27

kN/m'
kN/m'
kN/m'
kN/m'

18.43 kN/m'
18.43 kN/m'
0.26 MPa < 0.80MPa

dpl =
b=
Analiza optere}enja :
1) Sop.te`ina
2) Podna konstr.
g=
3) Korisno
p=
qu=1.6g+
Mu = 0.125 *qu* L2
Aa=
Aa=
7.07
Ap=
1.41
ea=
11.17
ep=
19.80
USVOJENO:
A

10 cm
100 cm
2.50
1.10
3.60
1.50
1.50

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

8.46 kN/m'
= 20.08 kNm
7.07
cm2
cm2
cm2
cm
cm
RF 10 /10cm

Ap= F 6 /15cm

POS 12 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

2.00

dpl =
b=
Analiza optere}enja :
1) Sop.te`ina
2) Podna konstr.
g=
3) Korisno
p=

qu
A

B
2.10

Ag=
Bg=
Ap=
Bp=

3.78
3.78
2.10
2.10

Au=
Bu=

9.83 kN/m'
9.83 kN/m'

max

kN/m'
kN/m'
kN/m'
kN/m'

qu=1.6g+
Mu = 0.125 *qu* L2
Aa=
Aa=
2.89
Ap=
0.58
ea=
17.28
ep=
48.39
USVOJENO:
A
Ap=

0.14 MPa < 0.80MPa

2.70

dpl =
b=
Analiza optere}enja :
1) Sop.te`ina
2) Podna konstr.
g=
3) Korisno
p=

qu
A

B
2.84

Ag=
Bg=
Ap=
Bp=
Au=
Bu=
max

5.10
5.10
3.54
3.54

kN/m'
kN/m'
kN/m'
kN/m'

qu=1.6g+
Mu = 0.125 *qu* L2
Aa=
Aa=
5.87
Ap=
1.17
ea=
13.45
ep=
23.84
USVOJENO:
A
Ap=

14.54 kN/m'
14.54 kN/m'
0.20 MPa < 0.80MPa

POS 14- KRSTATO ARM. PLO^A ;

2.50
1.10
3.60
2.00
2.00

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

9.36 kN/m'
=
5.16 kNm
2.89
cm2
cm2
cm2
cm
cm
F 8 /10cm
F 6 /15cm

POS 13 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

10 cm
100 cm

10 cm
100 cm
2.50
1.10
3.60
2.50
2.50

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

10.26 kN/m'
= 10.31 kNm
5.87
cm2
cm2
cm2
cm
cm
F 10 /10cm
F 6 /15cm

dpl =
10.00 cm
Analiza optere}enja:
1) Pod
3) Sop.te`ina
4) Korisno
g=
p=

1.10
2.50
1.50
3.60
1.50

KN/m2
KN/m2
KN/m2
KN/m2
KN/m2

STATI^KI UTICAJI:
Ly/Lx=
1.15
My
4.10

Mx

Pg=g*Lx*Ly=
Pp=p*Lx*Ly=
uticaji-g:

52.40 KN
21.83 KN
Q=kj*P (kj-tablica)
kx=
0.266
ky=
0.234

3.55

Mx)
My)

uticaji-p:

Qxg=
Qyg=
Qxg=
Qyg=

13.94
12.26
3.40
3.45

k=
k=
Mxg =
Myg =
Qxp=
Qyp=
Qxp=
Qyp=

M=ki*P
0.048
0.040
2.52
2.10
5.81
5.11
1.42
1.44

KN
KN
KN/m'
KN/m'
(ki-tablica)

KNm/m'
KNm/m'
KN
KN
KN/m'
KN/m'

Mxp =
1.05 KNm/m'
Myp =
0.87 KNm/m'
DIMENZIONISANJE:
(MB20)fb=
14.00 Mpa
GA 240/360
PRAVAC X: Mu max=1.6xMg+1.8xMp=

5.91

KNm/m'

k = 3.894
7.03
Aa=
3.28 cm2
ea=
15.24 cm
USVOJENO:
A F 8 /10cm
PRAVAC Y: Mu max=1.6xMg+1.8xMp=

4.93

KNm/m'

F8 / 10
15

k = 4.265
5.858
Aa=
2.73 cm2
ea=
18.29 cm
USVOJENO:
A F 8 /15cm

F8 / 15

Napomena: Svaku drugu {ipku poviti kod oslonaca

POS 15 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

2.20

qu
A

B
2.31

Ag=
Bg=
Ap=
Bp=
Au=

4.62
4.62
2.31
2.31

kN/m'
kN/m'
kN/m'
kN/m'

11.55 kN/m'

dpl =
b=
Analiza optere}enja :
1) Sop.te`ina
2) Podna konstr.+malter
g=
3) Korisno
p=

10 cm
100 cm
2.50
1.50
4.00
2.00
2.00

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

qu=1.6g+
10.00 kN/m'
Mu = 0.125 *qu* L2 =
6.67 kNm
Aa=
3.72
cm2
Aa=
3.72 cm2
Ap=
0.74 cm2

Bu=
max

11.55 kN/m'

ea=
ep=
USVOJENO:

0.16 MPa < 0.80MPa

13.45
37.66
A
Ap=

cm
cm
F 8 /10cm
F 6 /15cm

POS 16 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

2.45

qu
A
2.57
Ag=
Bg=
Ap=
Bp=
Au=
Bu=
max

5.15
5.15
2.57
2.57

kN/m'
kN/m'
kN/m'
kN/m'

12.86 kN/m'
12.86 kN/m'
0.18 MPa < 0.80MPa

dpl =
10 cm
b=
100 cm
Analiza optere}enja :
1) Sop.te`ina
2.50 kN/m2
2) Podna konstr.+malter
1.50 kN/m2
B
g=
4.00 kN/m2
3) Korisno
2.00 kN/m2
p=
2.00 kN/m2
qu=1.6g+
10.00 kN/m'
Mu = 0.125 *qu* L2 =
8.27 kNm
Aa=
4.60
cm2
Aa=
4.60 cm2
Ap=
0.92 cm2
ea=
10.86 cm
ep=
30.41 cm
USVOJENO:
A F 8 /10cm (Dole glavna)
Ap= F 6 /15cm(Dole podeona)

POS 17 -AB Konzolna plo~a, MB 20, GA 240/360


lo =

0.80 m
Gu

qu
A
L = 0.84
Ag =
Ap =
Au =
Mumax=

5.86
1.68

KN/m'
KN/m'

12.40
6.89

KN/m'
KNm

dpl =
10
cm
Analiza optere}enja:
1) Podna konstr.
1.10 KN/m2
2) Sopstvena te`ina
2.50 KN/m2
3) Malter
0.40 KN/m2
g=
4.00 KN/m'
4) Bet.ograda
2.50 KN/m'
Gu=1.6G
4.00 KN
5) Korisno
p=
2.00 KN/m2
qu=1.6g+
10.00 KN/m'
k = 3.408
9.155
Aa=
3.81 cm2
Ap=
0.76 cm2
ea=
13 cm
ep=
37 cm
USVOJENO: Aa= F 8 /10cm (Gore glavna)
F 8 /10cm (Dole )
Ap= F 6/ 20cm (podeona)
Betonsku ogradu armirati u obe zone F 8 /10cm

ST - A.B. Stepeni{ni krak , MB 20 , GA 240/360

14.00

=
17.5
=
28
= 0.625
= 0.848

cm
cm
cm

A
2.10 m

(~elo)h
(gazi{te)b
tg
cos

qu1

qu

dpl=

1.00

1)
2)
3)
4)

Analiza optere}enja: deo A-B


S. te`.plo~e
4.13
Od stepenika
1.75
Obloga stepenika
1.17
Korisno
p=
2.50

KN/m2
KN/m2
KN/m2
KN/m2

g=
qu =1.6g+1.8p =
Au =
Cu =
Ag =
Cg =
Ap =Cp =

23.75 KN/m'
20.77 KN/m'

7.05 KN/m2
15.78 KN/m'

Analiza optere}enja: deo B-C


1) S. te`.plo~e
3.50
2) Obloga stepenika
0.80
3) Korisno
p=
2.50
g=
4.30
qu1 =1.6g+1.8p =
11.38
maxMu = 17.87 KNm
h=
0.12
m
fb = 14.00 Mpa
b=
1.00
m
k = 3.359
Aa=
6.65
cm2
Ap=
1.33
cm2
ea= 11.88 cm
ep= 37.59 cm
USVOJENO: Aa = F 10/10
Ap = F 8/20

10.48 KN/m'
8.62 KN/m'
3.875 KN/m'

"Detalj ~vora B "

KN/m2
KN/m2
KN/m2
KN/m2
KN/m'

9.500

cm
cm

F 10/10

F 10/10

ST 1- A.B. Stepeni{ni krak , MB 25 , GA 240/360

qu
B

dpl=

12.00

cm

(~elo)h = 17.15 cm
(gazi{te)b =
28
cm
tg = 0.613
cos = 0.853
Analiza optere}enja:
1) S. te`. plo~e
2) Od stepenika
3) Obloga step.
g=

3.52
1.50
1.12
6.14

kN/m2
kN/m2
kN/m2
kN/m'

1.90 m

4) Korisno

Ag=Bg=
Ap=Bp=

5.83
2.38

kN/m'
kN/m'

Au =Bu=

13.60

kN/m'

2.20

2.50 kN/m2

qu =1.6g+1
14.32 kN/m'
maxMu =
6.46
kNm
USVOJENO: Aa= F 10 /10cm
Ap= F 8 /20cm

POS Pg - AB podestna greda , MB 20,RA 400/500


lo =

p=

b=
d=

m
qu

25
30

cm
cm

B
2.31

2R F 12

30

USVOJENO: Aa = 3RF 12
uz =F6 /20/10

uz F6

3R F 12

25

POS Pg 1- AB podestna greda , MB 20,RA 400/500


lo =

2.20

m
qu

b=
d=

20
30

cm
cm

B
2.31

2R F 12

30

USVOJENO: Aa = 3RF 12
uz =F6 /20/10

uz F6

3R F 12

20

G 1 - AB Greda , MB 20, RA 400/500,


lo =

4.35

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 1

25
40

cm
cm

2.50 kN/m'
28.33 kN/m'

L = 4.57
Au=
Bu=
max

73.83
73.83
0.91

kN
kN
MPa > 0.80 MPa

LMT

qu=1.6g+
32.33 kN/m'
Mu =
84.31 kNm

2R F 12

Aa =

cm2

USVOJENO: Aa = 5RF 14
uz =F6 /20/10

2 F 10
uz F6

40

6.57

5R F 14

25

G 2 - AB Greda , MB 20, RA 400/500,


lo =

1.36

qu
A

1)
2)
3)
4)
5)

B
L = 1.43

Au=
Bu=
max

63.17
63.17
0.78

kN
kN
MPa < 0.80 MPa

LMT

b=
25
d=
40
Analiza optere}enja:
Sopst. te`ina
2.50
POS 2
30.67
POS 109
25.71
POS 113
5.70
Zid+krov
14.00
qu=1.6g+
88.48
Mu =
22.55 kNm

cm
cm
kN/m'
kN/m'
kN/m'
kN/m'
kN/m'
kN/m'

2R F 12

Aa =

cm2

USVOJENO: Aa = 2RF 14
uz =F6 /20

2 F 10
uz F6

40

2.84

2R F 14

25

G 3 - AB skrivena vezna greda , MB 20, RA 400/500,


lo =

5.45

b=
d=

25
20

cm
cm

3R F 12

20

USVOJENO: Aa = 3RF 12
uz = F6 /20

uz F6
3R F 12

25

G 4 - AB Greda , MB 20, RA 400/500,


lo =

5.00

qu
A

B
L = 5.25

Au=

44.63

kN

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 4
3) POS 3

25
40

cm
cm

2.50 kN/m'
10.30 kN/m'
2.70 kN/m'

Bu=
max

44.63
0.55

kN
MPa < 0.80 MPa

qu=1.6g+
17.00 kN/m'
Mu =
58.57 kNm

2R F 12+ F6

15

Aa =
F6
2 F 10
uz F6

40

4.41

cm2

USVOJENO: Aa = 3RF 14
uz =F6 /20

3R F 14

25

10

G 5 - AB Greda , MB 20, RA 400/500,


lo =

2.70

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina

25
40

cm
cm

2.50 kN/m'

B
L = 2.84

Au=
Bu=
max

5.67
5.67
0.07

kN
kN
MPa > 0.80 MPa

LMT

qu=1.6g+
4.00 kN/m'
Mu =
4.02
kNm

2R F 12

USVOJENO: Aa = 2RF 14
uz =F6 /20/10

2 F 10
uz F6

40

2R F 14

25

G 6 - AB Greda , MB 20, RA 400/500,


lo =

5.70

qu
A

B
L = 5.99

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 5

25
40

cm
cm

2.50 kN/m'
24.50 kN/m'

Au=
Bu=
max

85.29
85.29
1.05

kN
kN
MPa > 0.80 MPa

qu=1.6g+
28.50 kN/m'
Mu = 127.61 kNm

LMT

2R F 14

Aa =

cm2

USVOJENO: Aa = 7RF 14
uz =F6 /20/10

2 F 10
uz F6

40

10.75

7R F 14

25
Neophodno je osiguranje od glavnih napona zatez. koso povijenom a (2RF 14)

G 7 - AB Kontinualna greda , MB 20, RA 400/500,


qu

b=
d=
Analiza optere}enja:
1) Sopst. te`ina

30
40

cm
cm

3.00 kN/m'

B
2.06

2) POS 5
3) POS 6
4) Zid

3.44

Au= 13.50 kN
Bu= 176.60 kN
Cu=
74.6
kN
max
1.11
MPa > 0.80 MPa

qu=1.6g+

24.40
7.20
10.50
53.20

kN/m'
kN/m'
kN/m'
kN/m'

2R F 14

POLJE A - B:
uz F6
2 F 10

40

USVOJENO: Aa = 2RF 14
uz =F6 /20 /10

2R F 14

25

2R F 14

POLJE B - C:
uz F6
2 F 10

40

USVOJENO: Aa = 4RF 14
Dole glavna
uz =F6 /20 /10

4R F 14

25

4R F 14

OSLONAC B:

uz F6
2 F 10

40

USVOJENO: Aa = 4RF 14
Gore glavna
uz =F6 /20 /10

2R F 14

25

G 8 - AB Greda , MB 20, RA 400/500,


lo =

3.40
qu

b=
d=
Analiza optere}enja:
1) Sopst. te`ina

25
40

cm
cm

2.50 kN/m'

B
L = 3.57

Au=
Bu=
max

25.88
25.88
0.32

2) POS 6
3) Ograda

kN
kN
MPa < 0.80 MPa

7.30 kN/m'
2.00 kN/m'

qu=1.6g+
14.50 kN/m'
Mu =
23.10 kNm

2R F 14

USVOJENO: Aa = 2RF 14
uz =F6 /20

2 F 10
uz F6

40

2R F 14

25

G 9 - AB Greda , MB 20, RA 400/500,


lo =

1.65

qu
A

B
L = 1.73

Au=
Bu=
max

12.56
12.56
0.16

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 6
3) Ograda

kN
kN
MPa < 0.80 MPa

25
40

cm
cm

2.50 kN/m'
7.30 kN/m'
2.00 kN/m'

qu=1.6g+
14.50 kN/m'
Mu =
5.44
kNm

2R F 14

2 F 10
uz F6

40

USVOJENO: Aa = 2RF 14
uz =F6 /20

2R F 14

25

G 10 - AB greda-serkla` , MB 20, RA 400/500,


lo =

3.50

b=
d=

25
20

cm
cm

2R F 12+ F6

15
20

F6
uz F6
2R F 12

25

10

G 11 - AB Greda , MB 20, RA 400/500,


lo =

USVOJENO: Aa = 2RF 12
uz = F6 /20

3.40

b=
d=

25
40

cm
cm

qu
A

B
L = 3.57

Au=
Bu=
max

64.46
64.46
0.80

kN
kN
MPa < 0.80 MPa

Analiza optere}enja:
1) Sopst. te`ina
2) POS 8
3) POS 7

2.50 kN/m'
8.12 kN/m'
19.12 kN/m'

qu=1.6g+
36.11 kN/m'
Mu =
57.53 kNm

2R F 14

Aa =

cm2

USVOJENO: Aa = 3RF 14
uz =F6 /20

2 F 10
uz F6

40

4.32

3R F 14

25

G 12 - AB Greda , MB 20, RA 400/500,


lo =

4.68

qu
A

B
L = 4.91

Au=Bu=
max

73.12
0.90

kN
MPa > 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 8
3) Zid

25
40

cm
cm

2.50 kN/m'
8.12 kN/m'
8.00 kN/m'

qu=1.6g+
29.79 kN/m'
Mu =
89.73 kNm

2R F 14

Aa =
2 F 10
uz F6

40

7.09

cm2

USVOJENO: Aa = 5RF 14
uz =F8 /20

5R F 14

25

G 13 - AB Greda , MB 20, RA 400/500,


lo =

3.00

qu
A

B
L = 3.15

Au=Bu=
max

29.96
0.83

kN
MPa > 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 8
3) POS 9

25
20

1.25 kN/m'
8.12 kN/m'
4.03 kN/m'

qu=1.6g+
19.02 kN/m'
Mu =
23.59 kNm

2R F 12

20

uz F6
4R F 12

25

cm
cm

Aa =

4.41

cm2

USVOJENO: Aa = 4RF 12
uz =F6 /20

G 14 - AB Greda , MB 20, RA 400/500,


lo =

3.00

qu
A

B
L = 3.15

Au=
Bu=
max

30.85
30.85
0.38

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 9
3) POS 10

kN
kN
MPa < 0.80 MPa

25
40

cm
cm

2.50 kN/m'
4.03 kN/m'
11.56 kN/m'

qu=1.6g+
19.59 kN/m'
Mu =
24.30 kNm

2R F 14

Aa =

cm2

USVOJENO: Aa = 2RF 14
uz =F6 /20

2 F 10
uz F6

40

2.84

2R F 14

25

G 15 - AB greda-serkla` , MB 20, RA 400/500,


lo =

2.25

b=
d=

50
20

cm
cm

3R F 12

20

uz F6

USVOJENO: Aa = 3RF 12
uz = F6 /20

3R F 12

50

G 16 - AB Greda , MB 20, RA 400/500,


lo =

2.45

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Ograda

25
25

cm
cm

1.56 kN/m'
2.00 kN/m'

L = 2.57
Au=
Bu=
max

7.85
7.85
0.17

kN
kN
MPa < 0.80 MPa

qu=1.6g+
6.10 kN/m'
Mu =
5.05
kNm

2R F 14+ F6

10

Aa =
F6
uz F6

25
15

2R F 14

25

0.74

cm2

USVOJENO: Aa = 2RF 14
uz =F6 /20

G 17 - AB Greda , MB 20, RA 400/500,


lo =

3.95

qu
A

B
L = 4.15

Au=
Bu=
max

37.53
37.53
0.99

kN
kN
MPa > 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 16
3) Ograda

20
25

cm
cm

1.25 kN/m'
12.90 kN/m'
2.00 kN/m'

qu=1.6g+
18.10 kN/m'
Mu =
38.92 kNm

2R F 14+ F6

10

Aa =
F6
uz F6

25
15

5.73

cm2

USVOJENO: Aa = 4RF 14
uz =F6 /20/10

4R F 14

20

G 18 - AB Greda , MB 20, RA 400/500,


lo =

1.95

qu
A

B
L = 2.05

Au=
Bu=
max

18.53
18.53
0.49

kN
kN
MPa > 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 16
3) Ograda

20
25

cm
cm

1.25 kN/m'
12.90 kN/m'
2.00 kN/m'

qu=1.6g+
18.10 kN/m'
Mu =
9.48
kNm

2R F 14+ F6

10

Aa =
F6
uz F6

25
15

1.19

cm2

USVOJENO: Aa = 2RF 14
uz =F6 /20

2R F 14

20

G 19 - AB Greda , MB 20, RA 400/500,


lo =

0.93

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Ograda

25
25

cm
cm

1.56 kN/m'
2.00 kN/m'

L = 0.98
Au=Bu=

2.98

kN
2R F 12

25

qu=1.6g+
6.10 kN/m'
Mu =
0.73
kNm

uz F6

Aa =
2R F 12

0.74

cm2

25

USVOJENO: Aa = 2RF 12
uz =F6 /20

G 20 - AB Greda , MB 20, RA 400/500,


lo =

2.20

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 12

25
30

cm
cm

1.88 kN/m'
20.00 kN/m'

L = 2.31
qu=1.6g+
23.00 kN/m'
Mu =
15.34 kNm
Au=Bu= 26.57 kN

2R F 12

30
Aa =

uz F6

G 21 - AB Greda , MB 20, RA 400/500,


1.20

qu
A

cm2

USVOJENO: Aa = 3RF 12
uz =F6 /20

3R F 12

25

lo =

2.73

B
L = 1.26

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 13
3) POS 15

25
30

cm
cm

1.88 kN/m'
14.60 kN/m'
11.60 kN/m'

qu=1.6g+
29.20 kN/m'
Mu =
5.79
kNm
Au=Bu= 18.40 kN

2R F 12

30
Aa =

uz F6

G 22 - AB Greda -nadvratnik , MB 20, RA 400/500,


2.40

cm2

USVOJENO: Aa = 2RF 12
uz =F6 /20

2R F 12

25

lo =

1.37

b=
d=

25
20

cm
cm

3R F 12

20

uz F6

USVOJENO: Aa = 3RF 12
uz = F6 /20

3R F 12

25

G 23 - AB Greda , MB 20, RA 400/500,


lo =

3.00

qu
A

B
L = 3.15

2R F 12

1)
2)
3)
4)

b=
25
d=
30
Analiza optere}enja:
Sopst. te`ina
1.88
POS 113
5.70
POS 14
5.00
Zid
10.80
qu=1.6g+
33.98
Mu =
42.15 kNm
Au=Bu= 53.52 kN

cm
cm
kN/m'
kN/m'
kN/m'
kN/m'
kN/m'

30
Aa =

uz F6

4.53

cm2

USVOJENO: Aa = 4RF 12
uz =F6 /20

4R F 12

25

POS 01 - LMT 40 , d =16+4= 20cm , MB 20 14.00


, fb =

lo =
2.18
m
1) Podna konstr.
1.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
4.50 KN/m2
4) Korisno
p=
2.00 KN/m2
q=
6.50 KN/m2
maxMu=
7.073 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

qu
A

B
L = 2.29

qu =
Au=Bu=

10.80 KN/m'
12.36 kN/m'

Ag =
Bg =
Ap=Bp=

5.15 kN/m'
5.15 kN/m'
2.29 kN/m'

POS 02 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

1.20

m
1)
2)
3)

qu
A

B
1.26

Ag=
Bg=
Ap=
Bp=

2.46
2.46
1.26
1.26

Au=
Bu=
max

4)

kN/m'
kN/m'
kN/m'
kN/m'

dpl =
b=
Analiza optere}enja :
Sop.te`ina
Malter
Podna konstr.
g=
Korisno
p=
qu=1.6g+
Mu = 0.125 *qu* L2 =

6.20 kN/m'
6.20 kN/m'
0.06 MPa < 0.80MPa

USVOJENO:

POS 03 - LMT 40 , d =16+4= 20cm , MB 20 14.00


, fb =
qu
A

B
L = 0.88

qu =
Au=Bu=

10.80 KN/m'
4.76 kN/m'

Ag =
Bg =
Ap=Bp=

1.98 kN/m'
1.98 kN/m'
0.88 kN/m'

14 cm
100 cm
3.50
0.40
1.10
3.90
2.00
2.00

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

9.84 kN/m'
1.95 kNm

A F 8 /15cm
Ap= F 6 /20cm

lo =
0.84
m
1) Podna konstr.
1.10 KN/m2
2) LMT konstrukcija
3.00 KN/m2
3) Plafon
0.40 KN/m2
g=
4.50 KN/m2
4) Korisno
p=
2.00 KN/m2
q=
6.50 KN/m2
maxMu=
1.050 KNm
za jednu gredicu:
Aa = 0.504 cm2
Aa1 = 2F7 (GA 500/560)
Aa2 =

Aam= Q 131 (MA 500/560)

POS 04 - AB MASIVNA PLO^A , MB 20 , GA 240/360


lo =

1.20

m
1)
2)
3)

qu
A

B
1.26

Ag=
Bg=
Ap=
Bp=
Au=
Bu=
max

2.14
2.14
1.26
1.26
5.70
5.70
0.07

4)

kN/m'
kN/m'
kN/m'
kN/m'
kN/m'
kN/m'
MPa < 0.80MPa

dpl =
b=
Analiza optere}enja :
Sop.te`ina
Malter
Podna konstr.
g=
Korisno
p=
qu=1.6g+

ST 2 - A.B. Stepeni{ni krak , MB 20 , GA 240/360

dpl=

3.00
0.40
1.10
3.40
2.00
2.00

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

9.04 kN/m'

Mu = 0.125 *qu* L2 =
USVOJENO:

12 cm
100 cm

1.79 kNm

A F 8 /15cm
Ap= F 6 /20cm
12.00

cm

USVOJENO: Aa= F 8 /10cm


Ap= F 6 /20cm

G 01 - AB Greda , MB 20, RA 400/500,


lo =

1.95

qu
A
Au=
Bu=
max

B
L = 2.05
5.32
kN
5.32
kN
0.15
MPa < 0.80 MPa

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) Ograda

25
20

cm
cm

1.25 kN/m'
2.00 kN/m'

qu=1.6g+
5.20 kN/m'
Mu =
2.72
kNm

2R F 12+ F6

10
20

F6
uz F6

10

USVOJENO: Aa = 2RF 12
uz =F6 /20

2R F 12

25

G 02 - AB Greda sa prepustom, MB 20, RA 400/500,


Pu

qu
A

B
3.35

Au=
Bu=

20.40
47.70

kN
kN

1.00

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 01
3) G 01
qu=1.6g+
Pu =

25
20

cm
cm

1.25 kN/m'
12.40 kN/m'
5.40 kN/m'
14.40 kN/m'
5.40 kN

max

1.06

MPa > 0.80 MPa

Mu =

20.20

kNm

3R F 12

20

uz F6
3R F 12

USVOJENO: Aa = 3RF 12
uz =F6 /20/10

25

G 03 - AB Greda , MB 20, RA 400/500,


lo =

1.50

b=
d=

25
25

cm
cm

3R F 12

25

uz F6

USVOJENO: Aa = 3RF 12
uz =F6 /20/10

3R F 12

25

G 04 - AB Greda , MB 20, RA 400/500,


lo =

2.20

b=
d=

25
20

cm
cm

3R F 12

20

uz F6
3R F 12

USVOJENO: Aa = 3RF 12
uz = F6 /20

25

G 05 - AB Greda , MB 20, RA 400/500,


lo =

3.00

b=
d=

25
30

2R F 12

30
uz F6
4R F 12

25

USVOJENO: Aa = 4RF 12
uz =F6 /20

cm
cm

TOJI OD GREDICA /NOSA^A/


ne dimenzija 28x25x16cm /
CU MESTA /Huk = 20cm/.
7/4) Aa1 =2F7 (GA 500/560)

ZA UKRU]ENJE b/d=15/20cm,
TAVANICE, IZVODI SE

Aa1 =2F7 (0.77cm2)

k = 4.215

k = 3.168

6.003

= 10.515

k = 4.371

5.569

k = 7.437

2.571

k = 8.635

2.571

k = 4.986

4.182

k = 8.046

2.571

k = 6.556

2.571

k = 3.248

10.064

k = 3.000

11.991

k = 35.402

2.571

k = 3.786

7.337

k = 4.425

5.426

h
b
fb
k

=
=
=
=

0.16
0.25
14.0
4.393

m
m
MPa

h
b
fb
k

=
=
=
=

0.16
0.20
14.0
2.631

m
m
MPa

= 5.426

= 21

h
b
fb
k

=
=
=
=

0.16
0.25
14.0
2.702

m
m
MPa

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
4.325

m
m
MPa

= 14.939

= 29.825

LMT

h
b
fb
k

=
=
=
=

0.16
0.25
14.0
2.615

m
m
MPa

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
3.675

m
m
MPa

= 16.01

= 12

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
5.943

m
m
MPa
= 8

h
b
fb
k

=
=
=
=

h=
b=
fb =

0.36
0.25
14.0
4.034

m
m
MPa

0.36
0.25
14.0

m
m
MPa

= 10

k=

3.575

= 12

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
3.905

m
m
MPa
= 12

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
2.467

m
m
MPa
= 18.3

h
b
fb
k

=
0.36
m
=
0.25
m
=
14.0
MPa
= 10.557
= 9.61

h
b
fb
k

=
=
=
=

2RF 12
F6 /20 /10

0.36
0.25
14.0
3.629

m
m
MPa
= 9.61

F6 /20 /10

h
b
fb
k

F6 /20 /10

TOJI OD GREDICA /NOSA^A/


ne dimenzija 28x25x16cm /
CU MESTA /Huk = 20cm/.
7/4) Aa1 =2F7 (GA 500/560)

ZA UKRU]ENJE b/d=15/20cm,
TAVANICE, IZVODI SE

=
0.36
m
=
0.25
m
=
14.0
MPa
= #VALUE!
= 9.61

Aa1 =2F7 (0.77cm2)

k = 2.974

12.130

Aa1 =2F7 (0.77cm2)

k = 2.747

h=
b=
fb=
k = 23.623

14.400

0.125 m
1.00 m
12.6 MPa
2.571

h
b
fb
k

=
=
=
=

0.16
0.60
14.0
1.790

m
m
MPa
= 38

Aa1 =2F7 (0.77cm2)

k = 3.448

9.000

h=
b=
fb=
k = 8.749

F 8 /10cm

0.125 m
1.00 m
12.6 MPa
2.571

h
k=

Mu
fb*b

h
k=

Mu
fb*b

h=
b=
fb=
k = 15.749

h=
b=
fb=

0.13 m
1.00 m
14.0 Mpa

h=
b=
fb=

0.13 m
1.00 m
14.0 Mpa

0.125 m
1.00 m
12.6 MPa
2.571

F 8 /10cm

h=
b=
fb=
k = 2.004

0.080 m
1.00 m
12.6 MPa
28.053

h=
b=
fb=
k = 3.953

0.080 m
1.00 m
12.6 MPa
6.888

h=
b=
fb=
k = 2.797

0.080 m
1.00 m
12.6 MPa
13.98

h
k=

Mu
fb*b

h
k=

Mu
fb*b

h=
b=

h=
b=
fb=

0.08 m
1.00 m
14.0 Mpa

h=
b=
fb=

0.08 m
1.00 m
14.0 Mpa

0.080 m
1.00 m

fb=
k = 3.477

12.6 MPa
8.851

h=
b=
fb=
k = 3.122

0.080 m
1.00 m
12.6 MPa
10.963

h=
b=
fb=

F 8 /10cm

0.08
1.00
12.5

m
m
Mpa

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
2.320

m
m
MPa

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
4.485

m
m
MPa

= 20.87

= 9

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
2.783

m
m
MPa

h
b
fb
k

=
0.36
m
=
0.25
m
=
14.0
MPa
= 10.624
= 20.87

= 14

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
1.885

m
m
MPa
= 34.14

POS 111
5) POS 113
6)
h=
b=
fb =
maxMu =
k=
Aa =

20.40 kN/m'
5.70 kN/m'

0.36
0.30
14.0
17.69
5.547
3.63

m
m
MPa
kNm
= 9.61
cm2

h
b
fb
k

=
=
=
=

0.36
m
0.25
m
14.0
MPa
4.431
= 5.43
Aa =
1.71
cm2

h
b
fb
k

=
=
=
=

0.36
m
0.25
m
14.0
MPa
9.131
= 5.43
Aa =
1.71
cm2

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
2.808

m
m
MPa

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
2.248

m
m
MPa

h
b
fb
k

=
=
=
=

0.16
0.25
14.0
1.949

m
m
MPa

= 13.7

= 22.5

= 31.5

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
4.321

m
m
MPa

h
b
fb
k

=
=
=
=

0.21
0.25
14.0
5.531

m
m
MPa

= 9

= 4

h
b
fb
k

=
=
=
=

0.21
0.20
14.0
1.781

m
m
MPa

h
b
fb
k

=
=
=
=

0.21
0.20
14.0
3.608

m
m
MPa

h
b
fb
k

=
0.21
m
=
0.25
m
=
14.0
MPa
= 14.570
= 4

= 39

= 8.1

h
b
fb
k

=
=
=
=

0.26
0.25
14.0
3.927

m
m
MPa

h
b
fb
k

=
=
=
=

0.26
0.25
14.0
6.390

m
m
MPa

h=

0.26

= 12

= 6

b=
fb =
k=

0.25
14.0
2.369

m
MPa
= 19.92

Aa1 =2F7 (0.77cm2)

k = 7.118

k=
Aa=
Ap=
ea=
ep=

h=
b=
fb=
9.238
Aa=
1.55
0.31
32.21
90.19

2.571

0.115 m
1.00 m
12.6 MPa
2.571
1.55
cm2
cm2
cm2
cm
cm

Aa1 =2F7 (0.77cm2)

k = 18.473

2.571

k=
Aa=
Ap=
ea=
ep=

h
b
fb
k
Aa

=
=
=
=
=

h=
b=
fb=
7.962
Aa=
1.28
0.26
38.99
109.18

0.16
0.25
14.0
5.734
1.13

0.095 m
1.00 m
12.6 MPa
2.571
1.28
cm2
cm2
cm2
cm
cm

m
m
MPa
= 8.1
cm2

POS 110 - AB plo~asta greda , MB 20, RA 400/500,


lo =

5.10

qu
A

B
L = 5.36

Au=
Bu=
max

45.79
45.79
0.42

kN
kN
MPa < 0.80 MPa

4RF 12

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 113
3) Krov

75
20

cm
cm

3.75 kN/m'
5.70 kN/m'
3.00 kN/m'

qu=1.6g+
17.10 kN/m'
Mu =
61.30 kNm
Aa = 10.92 cm2
USVOJENO: Aa = 10RF 12
uz =F6 /20

G 121
POS 110
Uz F6 /20

POS 113
10RF 12

25

75

70

G 116 - AB Greda , MB 20, RA 400/500,


lo =

3.25

qu
A

b=
d=
Analiza optere}enja:
1) Sopst. te`ina
2) POS 111

25
40

cm
cm

2.50 kN/m'
20.40 kN/m'

L = 3.41
Au=
Bu=
max

41.63
41.63
0.51

kN
kN
MPa < 0.80 MPa

qu=1.6g+
24.40 kN/m'
Mu =
35.52 kNm

2R F 12

Aa =
uz F6
2 F 10

40

3R F 12

25

2.69

cm2

USVOJENO: Aa = 3RF 12
uz =F6 /20

h
b
fb
k

=
=
=
=

0.16
0.75
14.0
2.094

m
m
MPa
= 26

h
b
fb
k

=
=
=
=

0.36
0.25
14.0
3.574

m
m
MPa
= 8.547