0% found this document useful (0 votes)
41 views3 pages

Stargaze DPR: Date Location Activity Audited Engineer

The document summarizes an audit of formwork and reinforcement for the 10th floor slab of Building B. The engineer observed the work and verified points with the consultant. Corrective actions were taken as needed to resolve any issues found during the audit.

Uploaded by

Vaibhav Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views3 pages

Stargaze DPR: Date Location Activity Audited Engineer

The document summarizes an audit of formwork and reinforcement for the 10th floor slab of Building B. The engineer observed the work and verified points with the consultant. Corrective actions were taken as needed to resolve any issues found during the audit.

Uploaded by

Vaibhav Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

STARGAZE DPR

Date

13/9/2016

Location

Activity audited

Engineer

B BLD

10 Th fl slab, P 2formwork&
reinforcement

Mr.Amul

Contractor

Orion infra

Observations/ Defects/Material Issues /


Process defects/ Work Done in brief.
J+W consultant point verification & slab
formwork checked

Corrective Action Taken or


Solution Given to resolve
the problem

QA/QC head decision /specification


required if any