OCCULAR SITE EVALUATION REPORT
Project Title: Green Archers Phase 2
Landowner
: NHA
TCT No.
: T-49626
Location
: Lot 1-18, Blk 2, Naga Road, Pulanglupa 1, Las Pinas
City
Date Inspected
: June 16, 2015
I.
PHYSICAL CHARACTERISTICS
1. Present Status of Lot
__________
Vacant
___________
w/ structures occupied by caretaker/tenants, ___ __
(quantify)
_____________
w/ squatters, _________ (quantity)
2. Existing Land Use/Zoning/Declared Use per Tax Declaration
Classification
Actual Land Use
Residential
Agricultural
w/ DAR conversion
w/o DAR conversion
Others, specify
Approved
Zoning
Declared Use
(Tax
Declaration)
3. Size of Lot _____360____ square meter
4. Shape of Lot ____________________________
regular
_______________
irregular
5. Topography _______________, flat, street level
_______________, rolling/highly elevated
_______________, below street level
6. Other Physical Characteristics (presence of river/creek/canal/; prone to
flooding; traces of mudflow/lava; traverse by transmission lines/irrigation
canals/bodies of water; within earthquake fault; etc.)
The area is near the creek and easement should be observe in lay outing
the batter boards.
II.
NEIGHBORHOOD
1. Area Surrounding the Site
____________________
Developed
____________________
Semi-developed
____________________
Blighted, sparsely developed
____________________
Undeveloped
III.
FACILITIES AND UTILITIES
1. Water Supply
___________________
___________________
___________________
___________________
___________________
2. Drainage
Direct line to water works system
Indirect line to water works system
(Specify distance)
Deepwell
Plans of local water utility company
___________________
___________________
___________________
way
Outfall through creek/river
Outfall through private drainage system
Outfall through private drainage system right of
3. Availability of Electrical Power Supply
___________________
w/ power lines within the property
__________________
w/ power lines from the access road
____________
(Specify distance)
___________________
No available power lines
___________________
Plans of local power utility company
Specify ________________
___________________________________________________________________________
___________________________________________________________________________
4. Type of Road that Services the Area
___________________
well paved, cemented or asphalt road
___________________
cemented or asphalt road, not wellmaintained
___________________
Dirt or unsurfaced road
IV.
ACCESSIBILITY
1. Distance to Main Transport Line
___________________
along the main transportation line
___________________
1 Km
___________________
2-3 Km
___________________
3 Km and above
OTHER INFORMATION / REMARKS:
The area is near the creek.
The access road to the proposed site is narrow.
The area is crowded and it will be difficult to look for a place to pile some
of the materials like sand, gravel and CHB.
The proposed site has informal settlers which may affect the
implementation of the project.
The warehouse where the excess materials from other project where
placed is within the area of the proposed site.
RECOMMENDATION:
Site preparation is must be coordinated properly with the home-owners
association before the implementation of the project.
Easement from the creek should be thoroughly observe since there is
already a strict policy about widening of waterways from the government.
Transfer the site of the warehouse.