Project 2 CEE 327: Kristal Kozai Jonathan Shuster Katie Hedgecock James Mitchell
Project 2 CEE 327: Kristal Kozai Jonathan Shuster Katie Hedgecock James Mitchell
Project 2 CEE 327: Kristal Kozai Jonathan Shuster Katie Hedgecock James Mitchell
CEE 327
Kristal Kozai
Jonathan Shuster
Katie Hedgecock
James Mitchell
Summary of Results:
Based on our analyses, these are our results:
Traffic Flow and LOS
1. Hourly traffic volume change with time
Hourly Volume
4000
3500
3000
2500
2000
Volume (cars) 1500
1000
500
0
Hour
2. Hourly average traffic speed. The data for traffic speed for each
20-second interval and for each hour is attached in the Excel file.
Topic
Flw
Flc
TRD
FFS
Rounded
FFS
Average
Speed
Original
Bridge
1.9
2.4
1.333333
33
63.62879
81
PHF
Fp
0.727744
81
1
Fhv
0.968523
65
58.29354
18
Vp
2087.715
35.81383
01
E
Density
LOS
Hourly Speed
70
60
50
40
Speed (mph) 30
20
10
0
Hour
3. The worst LOS for Eastbound SR-520 at the current bridge is LOS
E. It occurs between hours 6 and 7.
Topic
Topic
4 Lane
Flw
Flc
0
0
1.33333
333
71.2998
06
TRD
FFS
Rounded
FFS
Average
Speed
70
58.5339
519
6 Lane
0.72774
PHF Flw0.72774 0
PHF
481
Flc 481 0
Fp
1
4.
Assuming
the
new bridge were to
Fp
1 1.33333
open
in 2021,
N TRD 2 333
N
2 the LOS for the 4lane alternative is LOS E and for
71.2998
0.96852
the 6-lane alternative is LOS C.
Fhv FFS0.9685206
Fhv
3
Rounde 3
1535.94
Vp d FFS
2194.2070
Vp
661
Averag945
Densit e 37.4860
68.6908 Densit 22.3602
y Speed978 225
y
886
LOS
E
LOS
C
Tolling Methods
1. Toll gates in 2021 with 1 ETC and 7 MTB:
Vehicles will need to wait in a queue for toll collection from
hours 8 to 22.
The maximum vehicle delay is 46.6 minutes.
The total delay per day is 16,234 vehicle-hours.
The maximum toll collection time to avoid vehicle queues
from exceeding the storage space of 50 vehicles is 10.56
seconds per vehicle.
10
15
20
25
30
Time (Hours)
Arrival Rate
Departure Rate
Calculations:
Traffic Flow and LOS
D
vp
savg
fHV
vp
V
PHF N fHV fp
1
1 PT (ET 1) PR (ER 1)
PHF
V15,max
4 Vi
Bridge
FFS calculated
from data
2087.715
pc
35.8
LOS E
58.29
ln mi
2195.174
pc
37.48
LOS E
58.51
ln mi
direction of
For
vp
1536.017
pc
22.36
LOS C
68.69
ln mi
Tolling Methods
Hourly volume 2016 (veh/hr) calculated in Volume and Speed data
(Excel sheet 1)
2021 hourly volume (veh/hr) 2016 volume ( 1.01 )5
of traffic growth of 1% for 5 years.
using MTB
Departure rate =
3600
MTB Collection
Time (s)
Departure Rate
(veh/hr)
Max Queue (veh)
10.556
73
341
50
Hours of
Delay
8 to 22
Hour
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2016 Volume
(veh/hr)
448
240
164
144
284
969
2943
3693
3666
3636
3182
3105
3014
3168
3208
3379
2690
3038
3149
2595
2047
2213
1419
966
Total Delay
(veh-hr)
16234
2021 Volume
(veh/hr)
471
252
172
151
298
1018
3093
3881
3853
3821
3344
3263
3168
3330
3372
3551
2827
3193
3310
2727
2151
2326
1491
1015
Max Vehicle
Delay
46.56
ETC 2021
Volume
165
88
60
53
104
356
1083
1358
1349
1338
1171
1142
1109
1165
1180
1243
990
1118
1158
955
753
814
522
355
MTB 2021
Volume
306
164
112
98
194
662
2011
2523
2504
2484
2174
2121
2059
2164
2192
2308
1838
2075
2151
1773
1398
1512
969
660
Arrival
Rate
44
23
16
14
28
95
287
360
358
355
311
303
294
309
313
330
263
296
307
253
200
216
138
94
Departur
e Rate
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
The same process was used for the 2025 data. The growth rate is over
a 4 year span and ETC service is for 80% of vehicles instead of 30%
References:
[1] America Automobile Association (AAA). AAA Cites Some Of Nations
Worst Commuter Hot Spots. News Room. Feb. 14, 2005. Available
online at http://www.aaanewsroom.net/Main/Default.asp?
PageSearchEnginePageSize=&LoosenSearch=&
FileSearchEnginePageSize=&ArticleSearchEnginePageSize=&CategoryI
D=7&ArticleID=353
[2] WSDOT. SR 520 Bridge Replacement: Project History. Accessed
online at http://www.wsdot.wa.gov/NR/rdonlyres/FF07229D-ABE0-4AAB916C- 6A6CD1C1ACBD/0/SR520CAHAppendixA.pdf
[3] WSDOT. SR 520 Bridge Project - Frequently Asked Questions.
Accessed online at
http://www.wsdot.wa.gov/Projects/SR520Bridge/Questions.htm.
[4] James Slavicek. Tolling Options for the New SR-520 Bridge:
Electronic vs. Manual Toll Collection. Master degree paper. University of
Washington. June 2004. Seattle, WA.
[5] FHWA. HPMS Field Manual: Appendix N. Accessed online at
https://www.fhwa.dot.gov/ohim/hpmsmanl/appn1.cfm
[6] Mannering F., Washburn S. Principles of Highway Engineering and
Traffic
Analysis. 5Th Edition. John Wiley and Sons, Inc. USA. 2013.
Task Assignments
Katie Hedgecock Tolling Methods, typed calculations
Kristal Kozai Tolling Methods, project write-up
Jonathan Shuster LOS and Traffic Flow, typed Calculations
James Mitchell Tolling Methods, project write-up