0% found this document useful (0 votes)
41 views2 pages

1 House Maint. 7 5 3 8 8 East, West, Central 3+3+2

30 bamboo ladders are required. There are 8 sections that require manpower. The House Maintenance section requires 3 gangs for East, 3 for West and 2 for Central, totaling 8 workers. The Disconnection section requires 2 gangs for East and West, totaling 6 workers. The S&T section requires 2 gangs for A-shift and 1 for B-Shift, totaling 3 workers. Currently there are 7 charge linemen, 4 helpers and 5 vehicles. The required manpower is 14 charge linemen, 6 helpers and 3 vehicles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views2 pages

1 House Maint. 7 5 3 8 8 East, West, Central 3+3+2

30 bamboo ladders are required. There are 8 sections that require manpower. The House Maintenance section requires 3 gangs for East, 3 for West and 2 for Central, totaling 8 workers. The Disconnection section requires 2 gangs for East and West, totaling 6 workers. The S&T section requires 2 gangs for A-shift and 1 for B-Shift, totaling 3 workers. Currently there are 7 charge linemen, 4 helpers and 5 vehicles. The required manpower is 14 charge linemen, 6 helpers and 3 vehicles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Required No.

Of Bamboo Ladders

30

Section wise Gang on daily basis


SR.
Section
NO.

No of Gangs

House Maint.

East , West,
Central
3+3+2

Disconnection

East, West

S&T

A-shift, B-Shift
2+1

Present Manpower
Required Manpower
Charge Linem
Charge Linem
Helper
man
an
man
an
7

Ok

red Manpower
Helper
14

Vehicle

6
2

You might also like