Heat Load Estimation E20 Form SI
Heat Load Estimation E20 Form SI
SHEET
1 of 1
DATE
PREPARED BY
NAME OF JOB
LOCATION
Miri Serawak
SIZE
APPROVED
1,460.00
ITEM
m2 X
3.60
5,256.00
AREA OR QUANTITY
FACTOR
ESTIMATE
FOR
m3
PEAK
LOAD
September
4.00 pm
EQUIPMENT OPERATION
WATTS
DB
WB
%RH
GLASS
m2 x
0.57
ROOM (RM)
NE
GLASS
m2 x
0.57
DIFFERENCE
SE
GLASS
m2 x
0.57
SW
GLASS
m2 x
0.57
m2 x
m2 x
3.04
OUTDOOR AIR
PEOPLE x
Ventilation
NE
WALL
m2 x
3.04
SE
WALL
m2 x
3.04
SW
WALL
m2 x
3.04
ROOF - SUN
m2 x
ROOF - SHADED
m2 x
Infiltration
1 Air change/hr :
m3 =
PARTITION
l/s
5,256
l/s =
1,460.01
m2 x
m2 x
5.89
l/s VENTILATION =
1,460.01
FLOOR
m2 x
m2 x
POWER
KW
LIGHTS
WATTS
INTERNAL HEAT
245
1,000.00
1.25
0
SUB TOTAL
(-
)
SUB TOTAL
SAFETY FACTOR
SUPPLY
DUCT LEAK
LOSS
%+
1,460.01
l/s x
%+
FAN
H.P.
0.15
BF x
0
0
l/s x
-
g/kg
1.2
STEAM
kg/hr x
205
2310
APPLIANCES, ETC.
VAPOR TRANS.
SQ.m x
0.01
g/kg x
SAFETY FACTOR
10
l/s x
l/s OA
g/kg x
0.15
EFFECTIVE SENSIBLE
=
HEAT FACTOR
ADP
INDICATED ADP =
Dehum.
Rise
(1-
56.00 C
ERSH
ERTH
C - TADP
1.20
(47.60) C
ERSH
=
#DIV/0!
56.00 C
56.00 C) =
-
Dehum. l/s
SELECTED ADP =
l/s DA
1.20
Supply l/s
1.20
RSH =
RSH =
l/sDA =
#DIV/0! l/s SA
#DIV/0! l/sSA
Bypass l/s
l/sDA
l/sBA
*IF THIS T IS TOO HIGH, DETERMINE SUPPLY CFM FOR DESIRED DIFFERENCE BY SUPPLY AIR QUANTITY
FORMULA.
TRM
TADP
C
56.00
+
1,460.01 l/sOA
x (TOA
25,611.69 l/s**
0.15 BF x (T EDB
TEWB
C,
C - TROOM
C - TADP
C) = TEDB
56.00 C) = TLDB
TEWB
47.60 C
C
**WHEN BYPASSING A MIXTURE OF OUTDOOR AND RETURN AIR, USE SUPPLY l/s, WHEN BYPASSING RETURN AIR ONLY, USE
DEHUMIDIFIED l/s.
NOTES
SUB TOTAL
OUTDOOR AIR
l/s per m
LATENT HEAT
PEOPLE
mX
INFILTRATION
EXHAUST FAN
APPLIANCES, ETC.
m2 x
DOORS x
l/s INFILTRATION =
STORAGE
OPEN DOORS
m2 x
PEOPLE
PEOPLE x
CEILING
INFILTRATION
SWINGING
REVOLVING DOORS
CRACK
g/Kg
10 hours
DP
OUTDOOR (OA)
NW
NW
LOCAL TIME
SUN TIME
HOUR/DAY
CONDITIONS
SKYLIGHT
LOCAL TIME
SUN TIME
0
0
0
15
BF x
1,460.01
l/s X
Cx
(1-
0.15
BF) x
1.2
LATENT
1,460.01
l/s X
g/kg x
(1-
0.15
BF) x
% RSH +
RETURN
DUCT
LEAKAGE
GAIN
UMP H.P.
% RSH
BTU/HR/SQ.FT =
kw. x
% GTH +
PIPING HEAT
GAIN
CHECK FIGURES
GRAND TOTAL
1000
SQ.FT/PERSON =
WATT/SQ.FT =
% GTH
REFRIGERATION LOAD =
RM SENS.
MIN.
0
0
FORM E - 20 (3 - 72)