DEFINITIONS
UsingthecosineequationtosolveforthedistanceX:
Therefore:
NOTE: This relationship holds true for angles less than 710
Therefore:
and
Thereisa0.0017differenceoverthe10range.Thiserror
isnegligible.Thelistequationcannowbeused.
Example
or
Example
Your ship has a 2.8 list to port. The CO wants it
corrected. There are 3,200 gallons of fuel in the port wing
tank (DFM 322 Gal/LT). The starboard wing tank is empty.
Correct the list using the fuel and a set of 5 forklifts (8
LT each). The forklifts may only be moved 15 FT to starboard
before hitting the bulkhead. How long will it take to
correct the list?
WO = 4200 LT
KM = 23.5 FT
KG = 19.75
FT
or
Step 3: So far, we have corrected 1.27o of the 2.8o list.
Using the forklifts, we will correct for the remaining 1.53o
list.
or
INCLINING EXPERIMENT
The inclining experiment is completed upon commissioning and
following each major overhaul. It is performed to obtain
accurately the vertical height of the ships center of
gravity above the keel (KGo). Details of the procedures and
requirements are spelled out in Section 4, NSTM 079 volume
1, Damage Control Stability and Buoyancy.
Procedures:
The naval shipyard or building yard at which the inclining
experiment is to be performed will issue a memorandum to the
ship outlining the necessary work to be done by ships force
and by the yard to prepare the ship for inclining.
measured.
8. Pendulums set up forward,
midships, and aft.
9. Weights are moved offcenterline.
10.Inclination of the ship
measured.
Measurements are taken for several weight movements both
port and starboard. The Naval Architect then uses the
following equation:
Where:
Length of Pendulum
3. FLOODING IS UNDER
CONTROL.
4. EMERGENCY
PATCHING, PLUGGING
AND SHORING HAS BEEN
COMPLETED.
5. CORRECTION OF THE
SHIPS LIST OR TRIM
AND SHORING ORDERED.
LIMITS OF THE DRILL:
1. ONLY COUNTER
FLOODING OR SHIFTING
OF THE LIQUID LOAD
IS AUTHORIZED AS
CORRECTIVE ACTION.
1. PROPER DISSEMINATION OF INFORMATION AND
REPORTS. 15________
A. READINESS OF REFERENCES 5
1. FLOODING EFFECTS AND LIQUID
LOAD DIAGRAM.
2. UP-TO-DATE LIQUID LOAD
LIST.
3. FUEL OIL TRANSFER BILL.
A. FUEL OIL TANK
SEQUENCE TABLES.
4. COUNTER FLOODING BILL.
5. FLOODING EFFECTS BILL.
B. COMPLETENESS AND CORRECTNESS OF DC
MESSAGES. 5
1. COMPLETE SET OF DAMAGE
CONTROL WRITTEN MESSAGES.