1. PURPOSE:
Page
No.
Sectio
n
Nature Of Amendment
Done By
Revision
No.
Title:
CONTROL OF DOCUMENTS
Date:
Document No:
KEC-PR-001
0
0
Issue
No.
25-03-2013
Page 2 of 6
2. SCOPE:
The scope of this procedure is controlling various procedures, formats and all type
records used at Al-Karrar Engineering Co. for General Contracting (Ltd.).
3. RESPONSIBILITIES:
a) The Management Representative and Deputy Management Representative
have responsibility for directing the activities of this procedure.
b) Management Representative is responsible to maintain and revise this
procedure.
4. PROCEDURE:
Control of Documents:
4.1
Document Hierarchy
Level 1:
Level 2:
Level 3:
Level 4:
4.2
IMS Manual
Procedures and SOPs
Job descriptions, Work instruction
QHSE Records, Specifications, and Standards
Document Coding
4.2.1
0
1
Revision
No.
Title:
CONTROL OF DOCUMENTS
Date:
Document No:
KEC-PR-001
0
0
Issue
No.
25-03-2013
Page 3 of 6
Where:
All documents will be initially provided with Rev: 00 for initial release, any
further revision will be followed by Rev. 1 for 1st revision and numerically
increases for further revisions.
4.3
4.4
4.4.1
4.4.2
Approvals:
0
1
Revision
No.
Title:
CONTROL OF DOCUMENTS
Date:
Document No:
KEC-PR-001
4.5
0
0
Issue
No.
25-03-2013
Page 4 of 6
4.6
Amending Documents
4.6.1 In case of any change in procedures, WI, forms/formats is required;
it is recorded in Change / Disposition Form (KEC-FM-001-0400).
4.6.2 The change is highlighted with (*).
4.7
0
1
Revision
No.
Title:
CONTROL OF DOCUMENTS
Date:
Document No:
KEC-PR-001
0
0
Issue
No.
25-03-2013
Page 5 of 6
4.8
4.9
Minor Changes:
5 RELATED RECORDS:
i.
ii.
iii.
0
1
Revision
No.
Title:
CONTROL OF DOCUMENTS
Date:
Document No:
KEC-PR-001
iv.
0
0
Issue
No.
25-03-2013
Page 6 of 6
KEC-FM-001-04-00
0
1