The Master Plan of Lao Bao border extending sector belong to Lao Bao special economic - commercial area
(Lao Bao SECA), Quang Tri province
Lao Bao Special Economic Zone and Dansavanh Border Trade Zone on the EWEC
Gate A of Dansavanh
Gate B of Dansavanh
10
The SSI and SWI Pilot carried out at the Lao BaoDansavanh
border crossings consisted of 4 phases (with phases 2 and 3
combined)
* Stage 1: The Contracting Parties of the MOU coordinate to
jointly inspect commodities at the CCA (Common Control
Area) of the country of entry (from 30.June.2005).
* Stage 2 & 3: Customs Agencies and Quarantine Agencies of
the two countries coordinate to work together to carry out all
the procedures concerned at the country of entry (from 1st July
2005 to 5th February 2015)
* Stage 4: Fully carry out all the procedures by all border
agencies for SSI and SWI. All the competent agencies
coordinate to implement their duties (from 6th February 2015
up to now)
11
Truck
Cars/Buses
Walking/Bicycles
Immigration
G6
Lao
PDR
Health
E5
S
t
a
i
r
s
Customs
For
Vehicles
Quarantine
(Plant)
D
4
C3
Quarantine
(Animal)
Customs for
Goods
B2
A1
Cashier
(Upstairs)
Waiting
Room
Waiting
Room
Lao Bao Border Checkpoint
Immigration
Health
Customs
For
Vehicles
G1
E2
D3
Quarantine
(Plant)
C4
Quarantine
(Animal)
B5
Walking/Bicycles
Cars/Buses
Truck
12
S
t
a
i
r
s
Lao
Customs
Working
Room
Customs
A6
Vietnam
Stage 1
Step I: Joint Customs Inspection in Common Control Area (CCA) at Country of Entry
Lao PDR
Viet Nam
C-L
C-V
No-Mans Zone
Physical Inspection
CCA
Export/Transit Cargo
As required
Submission of
documents
Submission of
documents
As required
Export/Transit Cargo
C-L
C-V
Physical Inspection
CCA
Legend:
C-Customs; Q-Quarantine; I-Immigration; L-Lao PDR; V-Viet Nam
13
Stage 2 & 3
Step 2 & 3: Joint Customs and Quarantine Inspection in Common Control Area (CCA) and
Clearance/Processing of Customs and Quarantine Documents at Country of Entry
Lao PDR
C-L,C-V
Viet Nam
Q-L,Q-V
No-Mans Zone
Physical Inspection
CCA
Export/Transit Cargo
As required
C-L
C-V
Q-L
Q-V
Submission
of documents
Export/Transit Cargo
Submission of
documents
Q-L C-L
As required
C-L,C-V
Live animals will be inspected jointly at the
Country of Exit
Q-V C-V
Q-L,Q-V
Physical Inspection
CCA
Legend:
C-Customs; Q-Quarantine; I-Immigration; L-Lao PDR; V-Viet Nam
14
Stage 4
Step 4: Single Window and Single Stop: Joint Customs and Quarantine Inspection in Common Control Area
(CCA) and Clearance/Processing of Customs, Quarantine, and Immigration Documents
at Country of Entry
Lao PDR
C-L,C-V
Viet Nam
Q-L,Q-V
No-Mans Zone
Physical Inspection
CCA
Export/Transit Cargo
As required
C-L
Q-L
I-L
C-V
Q-V
I-V
Submission
of
documents
Export/Transit Cargo
Submission
of
documents
I-V
Q-V
C-V
I-L
Q-L
C-L
As required
C-L,C-V
Live animals will be inspected jointly at the
Country of Exit
Q-L,Q-V
Physical Inspection
CCA
Legend:
C-Customs; Q-Quarantine; I-Immigration; L-Lao PDR; V-Viet Nam
15
Leaders of Customs of
Quang Tr - Savanakhet
signing the coordination
regulations
16
Leaders of Immigration of
Quang Tr - Savannakhet
signing the coordination
regulations
Quang Tri Provincial Peoples Committee issued Decision No. 520/Q-UBND dated
25/3/2015 establishing Bordergate Managemnet Center (BMC) of Quang Tri province
in line with implementation of Decision No.45/2013/Q-TTg dated 25/7/2013 by the
Prime Minister issuing Regulations on Operations at Inland Bordergates of Vietnam.
17
19
2.3 Infrastructures:
1. Renovation of the Interagency
Control Complex in the middle of
Lao Bao International Bordergate
Terminal: approved by Quang Tri
PPC, carried out by Provincial
customs Department with the total
budget of VND10.64 billion, put into
operation on 25/01/2015 (timely for
the launch of stage 4 - SWI/SSI).
2. Renovation/rehabilitation of key
facilities of Lao Bao Terminal by
BMC (completed period 1 on
01/02/2015 and period 2 is now
under construction) with the total
budget of VND2.6 billion.
20
3. Renovation of the
Interagency Control
Complex for Entry by
rehabilitating and upgrading
the old Millennium
Supermaket Building to
make new Lao Bao Entry
Terminal: Funding by
Ministry of finance, carrying
out by Provincial Customs
Department with the amout
of VND35 billion, now is
under construction.
21
2010
2011
2012
2013
2014
2015
(First 7
months)
1. No of people
(000)
288
308
297
771
783
553
334
Of which: - Exiting
146
159
153
392
386
265
166
142
149
144
379
297
288
168
2. No of vehicles (000)
57
65
62
79
89
62
37
Of which: - Exiting
29
33
31
40
42
31
18
- Entering
28
32
31
39
47
31
19
254
391
342
436
530
181
66
Of which: - Exports
33
57
72
48
185
42
34
- Imports
221
334
270
388
345
139
32
- Entering
22
23
II. PERFORMANCE
AGENCIES
BY
SECTOR
1. Customs:
* Performance in 2015:
2. Immigration:
* Performance in 2015:
- Total number of people through
the bordergate: 553,000 (Exit:
265,000; Entry: 288,000)
-Total
number of vehicles:
26,000 (exit: 12,000 ; entry:
14,000)
25
27
28
29
Assessment:
* Strengths:
30
* Weaknesses/challenges:
- Exports: Despite incentives, exports from Vietnam to Laos have been limited
due to limited market and low income, focusing on low value goods:
construction materials, consumption goods Exchange of goods among local
residents are at low value and not recorded as formal trade.
- Imports: Traditional higher value goods from Laos to Vietnam through Lao
Bao include: woods, copper, gypsum, rubber, coffee beans, fruits, home
appliances, electrical and electronic goods ... The import of such goods fell
sharply in 2015: woods reduced from 65% to 47% of total revenues (recentlly,
Lao government has issued a instruction to forbid export natural woods to
oversea, the volume of woods exchanged between the borgers will be limitted
in the future); copper from 26% to almost zero; import of gypsum decreased
sharply due to high transportation costs and low price of selling in the market;
fruits transportation has changed the routes, via other border crossings.
- Savanakhet Provincial Government introduced policies to protect local
vehicles (motorized vehicles) to pass the borders. This in contrary to the
Bilateral Road Traffic Agreement between the two countries, limiting trade
and exchange between the two sides, especially activities among the local
people on the 2 sides of the border.
32
33
34
Dong Ha City
60km
Da Nang City
260 km
1,200
km
Ha Noi capital
680 km
110 km
125km
Border gate
between
Savanakhet &
Mukdahan
240 km
Vientiane
700 km
Bangkok
1000 km
INVESTMENT UPDATE
After 18 years, there are more 425 enterprises, 3.000 household families operating in
Lao Bao SECA (as compared to only 12 enterprises and around 1000 business families
before the establishment date)
So far, the area has attracted 67 investment project with a total register capital of over
VND 4.000 billions, the hired areas is 300 hectares,in which:
+ 04 FDI Projects with total investment capital of 36 millions USD.
+ 34 projects operated with total investment capital of 2.745 billions VND
+ 26 projects were issued Certificate of Investment with total investment capital of 857
biliions VND
+ 06 projects are being checked in investment with total investment capital of 160
billions VND.
Giving jobs for 5.000 workers.
CRV facory (FDI Thailand)
Mukdahan Supermaket
230 Km
Ubon
Ratchathani
Airport
130 Km
Vientian
650 Km
Da Nang Port
655 Km
Ha Noi
750 Km
Phnompenh
892 Km
Bangkok
998 Km
Yangon
1,378Km
39
8 Km
180 Km
Vientiane Capital
424 Km
Da Nang Port
540 Km
Hanoi
726 Km
Phnompenh
835 Km
Bangkok
661 Km
722 Km
690 Km
Suvarnabhumi Airport
633 Km
Yangon
1,242Km
Lao PDR
Thailand
Malaysia
Japan
France
Holland
South Korea
Australia
Canada
Hong Kong
Taiwan
Belgium
J/V Lao-Australia
J/V Lao- Japan
J/V Lao-Malaysia
Total
(as at 30th March 2016)
12
8
5
5
4
2
2
2
1
1
1
1
1
1
1
47
Khu A
Khu B
46
QUANG TRI
SOUTH-EASTERN
ECONOMIC ZONE:
+ With My Thuy deep
seaport ;
+ Apart 125 km from Lao
Bao SECA;
+ Making EWEC shorter
than 150 km (in the total of
1.450 km)
+ Having area 237.71 km2
+ The focus is seaport
service, ship building and
repairing industry, building
materials industry,
electricity extraction and
processing industry,
logistics service business,
SCALE
QUANG
SOUTH-EASTERN
ZONE
Phm viOF
Khu
kinh tTRI
ng
Nam Qung Tr, ECONOMIC
tnh Qung Tr
Scale:
Consiting of 17
communes
and townships
belong to 03
districts, they
are:
- Gio Linh
- Trieu Phong
- Hai Lang
Petroleum port 53 Ha
General port 209Ha
Logistics area,
and port logistic service
86 Ha
TRANSPORTATION OF AREA
HCM
QL9
CNG
THY
CAM L - LA SN
QL
1
.Planning in the street from terminal 1A
width 70M, including railway planning line
from Ho Chi Minh 1A long road to 7,7 Km
Expansion of 4 lanes 1A, completed in 2016.
Ga Din sanh
EWEC)
International
shippng line
Para EWEC
Advantages of
transportation of
Quang Tri to the
others:
South-Eastern economic
Zone
High -way 1A
+ Comfortable
transportation in roads, sea
lines and railway;
+ Rather flat land area with
7-10 m above sea level.
+ Trees and households
construction are not much
with low cost of
compensation.
54
55
First:
56
57
1. For ADB:
1.1 To provide consultant guidance and financial support to carry out the
forthcoming activities for SSI/SWI, such as: Making Operational Manual,
Providing necessary supplies and equipments suggested by the involved
agencies; Traning courses in English, Vietnamese and Laotian as proposed by
Vietnamese and Laotian concerning agencies.
1.2 To coordinate with government and ministries of Vietnam and Lao in
guidance and instruction the privincial departments and localities to build
and carry out a national common process as well as functional separate
process so that SSI/SWI can be put into practice with full enough meaning.
1.3 To provide financial support to communication activities: Developing
signage, edition and posting of information/images on LED screen to promote
the SSI/SWI at the border checkpoint; Producing reportage, publications on
mass media; Building and developing website for promotion and access to relevant
information on SSI/SWI process and procedures.
2. For Ministries:
2.1 To provide sources of Agreements, MOUs, relevant documents on GMS
CBTA and SSI/SWI, provide guidance to Quang Tri PPC and BMC in
development of SWI/SSI Operational Manual;
2.2 To coordinate with ADB, Office of Government to guide on procedures to seek
funding for equipment, language training and infractucture to complete the
facilities required for effective implementation of SWI/SSI.
Contact:
MANAGEMENT BOARD OF
QUANG TRI ECONOMIC ZONE
Mr. Nguyen Van Binh
Deputy Chief of the Board,
Director of Bordergate Management Center
Add.: 06 Nguyen Hue - Lao Bao Town, Huong Hoa
District, Quang Tri Province
Mobile: (0084)913.408.515
Tel: (0084)533.877871; Fax: (0084)533.877870
Email: [email protected]
60