No. ___________/__________
Dated Torghar the 06/06/2015
To
The Monitoring Officer-II,
C & W Department Peshawar.
Subject:
INFORMATION REQUIRED REGARDING ROADS/BRIDGES.
Reference: Your Office No. D (P&M)/C&WD/1-54/2015 dated 02/06/2015
Please refer to above and find enclosed the required information on
prescribed Proforma as desired, in respect of C & W Division Torghar for necessary
action.
Encls: As Above.
EXECUTIVE ENGINEER
C & W DIVISION TORGHAR
2.
S.#
1.
Description
Total
length
(kms)
of
Improved/Rehabilitated/Widened
/ Dualized Road completed in 1st
quarter.
Total length (kms) of new
constructed Roads completed in
1st Qtr
12
18
24
General
remarks
10
Bridges
Total No of new bridges completed in 1st
quarter
Numbers
-
2.
S.#
1.
Description
Total
length
(kms)
of
Improved/Rehabilitated/Widened
/ Dualized Road completed in 2 nd
quarter.
Total length (kms) of new
constructed Roads completed in
2nd Qtr
12
18
24
General
remarks
10
Bridges
Total No of new bridges completed in 2nd
quarter
Numbers
-
2.
Description
Total
length
(kms)
of
Improved/Rehabilitated/Widened
/ Dualized Road completed in 3 rd
quarter.
Total length (kms) of new
constructed Roads completed in
3rd Qtr
12
18
24
General
remarks
S.#
1.
Bridges
Total No of new bridges completed in 3rd
quarter
Numbers
-
EXECUTIVE ENGINEER
C & W DIVISION TORGHAR