Proposed Water Tank Stand Mr. Patrick Mwenda: Weight KG
Proposed Water Tank Stand Mr. Patrick Mwenda: Weight KG
Proposed Water Tank Stand Mr. Patrick Mwenda: Weight KG
Project
Client
Member
Bar Mark
Job No.
271
Drg. No.
Date
No. of
Mbrs
Serial
9/11/2015
Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code
Date
Rev.
O1
10-Sep-2015
CheckedPK
*A
*B
*C
*D
*E/r
Pieces
Weight kg.
footing
B2
Y32
36
36
11,100
21
300
5,100
300
399.60
440
37
2,517
(1 No.)
T2
Y32
36
36
11,100
21
300
5,100
300
399.60
440
37
2,517
B1
Y32
26
26
12,300
21
300
5,700
300
319.80
352
29
2,015
T1
Y32
26
26
12,300
21
300
5,700
300
319.80
352
29
2,015
0.00
O9-B1
Y32
36
36
5,100
21
2,100
900
2,100
183.60
202
17
1,157
10-B2
Y25
5,800
21
300
5,200
300
29.00
32
113
10-B2
Y25
5,800
21
300
5,200
300
23.20
26
90
0.00
TOE
0
(1 No.)
WALLING
NF1
Y25
41
164
4,746
21
300
4146
300
778.34
856
71
3,036
O1-B2
Y16
48
0
192
0
6,400
21
300
5800
300
0.00
1,228.80
0
1,352
0
113
1,966
03- T2
Y25
29
29
4,746
21
300
4146
300
137.63
151
13
537
04- T2
Y25
29
29
0
4,746
0
21
300
4146
300
137.63
0.00
151
0
13
0
537
04- T2
Y16
29
29
5,100
21
300
4500
300
147.90
163
14
237
16,737
0.00
0.00
0.00
TOTAL WEIGHT
1/4
APEX SYSTEMS
Project
Client
Member
Bar Mark
Job No.
271
Drg. No.
Date
No. of
Mbrs
Serial
9/11/2015
Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code
2/4
Date
Rev.
O1
10-Sep-2015
CheckedPK
*A
*B
*C
*D
*E/r
Pieces
Weight kg.
APEX SYSTEMS
Project
Client
Member
Bar Mark
Job No.
271
Drg. No.
Date
No. of
Mbrs
Serial
9/11/2015
Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code
3/4
Date
Rev.
O1
10-Sep-2015
CheckedPK
*A
*B
*C
*D
*E/r
Pieces
Weight kg.
APEX SYSTEMS
Project
Client
Member
Bar Mark
Job No.
271
Drg. No.
Date
No. of
Mbrs
Serial
9/11/2015
Prepared by
AM
Length of
No. in Total
Each Bar
Shape
Each
No.
(mm)
Code
4/4
Date
Rev.
O1
10-Sep-2015
CheckedPK
*A
*B
*C
*D
*E/r
Pieces
Weight kg.