Electrical Engineer
Electrical Engineer
To work and excel in a professional organization, which provides a Challenging work atmosphere and bring out the
best in me.
My strengths are my self confidence, self motivation, and ability to work under pressure, my good health and my total
commitment to organization I work for.
Educational Background
Course Bachelor of Engineering (B. E. ) In Power Electronics (Electrical
Engineering) in First division.
Institute B. D. College of Engineering, Wardha, Maharashtra, India
Work Experience
* Working as a Sr. Design engineer in VNS Switchgear (I) Pvt. Ltd, Mumbai from, Jan 2008 to Till date.
* Worked as a Design engineer in Salus Technologies Private Ltd. Pune from, Nov 2003 to
Dec 2007.
* Worked as a Design Engineer in Al Ghandi Switchgear industry, Dubai, UAE from May 2003 to Nov 2003.
* Worked as a Design engineer in Smisen Controls Private Ltd. New Bombay from September 2002 to April 2003.
* Worked as a Trainee Design engineer in Symatic Engineering Private Ltd. New Bombay from June 1999 to Aug
2002.
Computer Skills
Software : 1) AUTO CAD R-2006,2008 2) Wipro Dialux
Operating Systems : Windows XP
Other Tools Known : MS Office.
Work Experience Details
**Name of Company Symatic Engineering Private Limited, New Bombay
Electrical Control Panel Manufacturing Company.
Designation Design Engineer.
* Job Includes Design aspects of Control Panels.
* Design of Electrical Control Panels like MCC, PCC, MDB, MPDB, LDB, PDB, Control Desk, LT Switchgears etc.
* Design includes the making of Schematic General Arrangments, Circuit drawings including Single line diagram,
Wiring diagram of the Panels. As Built Drawings, Also making the Bill Of Materials (BOM) of the Switchgears used in
the panels.
**Name of Company Smisen Controls Private Limited, New Bombay
Electrical Control Panel Manufacturing Company.
Designation Design Engineer
* Design of Electrical Control Panels like MCC, PCC, MDB, MPDB, LDB, PDB, Control Desk, LT Switchgears etc.
* Design Includes the making of Schematic General Arrangments, Circuit drawings including Single line diagram,
Wiring diagram of the Panels. As Built Drawings, Also making the Bill Of Materials (BOM) of the Switchgears used in
the panels.
Resume
Total
Experience:
Years
Months
1. Name of Organization: Emergent Ventures India Ltd (Team Wind Force Management)
From:
July,2014
Designation:
Sr.
Engineer
Roles
&
Responsibility:
1. Reviewing overall project progress and preparing MIS reports for the customer.
2. Checking of incoming materials quality and its acceptance documents.
3. Reviewing various aspects regarding fulfillment of SOP as per the Business contract signed.
4. Responsible for Quality Audit and documentation as per customer requirements from the
developer.
5. Auditing execution at site and material storage facility for proper upkeep of the equipments/
turbines.
6. Conducting checks regards to the HSE aspects to meet the customer expectations.
7. Validating and giving acceptance of the project commissioning on behalf of the customer.
8. Responsible for certification of startup of turbine & verification of it meeting power
generation.
9. Attending delegates and facilitating site visit and resolving queries.
10.
Technical
due
diligence
of
Wind
Power
Projects.
11.
Work
towards
achieving
ISO
2001:9001
QMS
guidelines.
2.
Name
From:
Designation:
of
Organization:
January,2011
Enercon
to
India
Limited
June,2014
Engineer
About Organization: Engaged in Wind farm development from concept to operation having
business in various countries, basically a German multinational started in 1982 operating in India
since
1994.
Project Worked Upon: More than 300 MW of Wind Turbine Project Commissioning at various
sites in Rajasthan, Gujarat & Madhya Pradesh working in various capacities and teams.
Roles
1.
Leading
a
Manpower
Looking
after
Providing training
2.
Timely completion
Insuring the work
Management related
3.
&
Responsibility:
Manpower
Management:
team
of
technicians
and
engineers
allocation
for
daily
work
the
welfares
of
the
employees
to the new employees and identifying needs of training
Project
Management:
of project involving management of manpower & material
is carried out as per the company standards and protocols
to Transmission Lines, Construction, and Project Engineer etc
Technical
&
Documentation:
Tracking use of material and in time delivery of materials and its quality inspection.
Maintenance
and
troubleshooting
of
faults
of
Wind
Energy
Converters
Providing technical support to the ground team & Coordination with central support
team
for
resolving
of
problems
4.
Material
Management
(SAP-MM):
Checking
of
incoming
material
as
per
BOM.
Rejection
of
material
not
as
per
quality
Insuring
all-time
availability
of
critical
material
at
site.
SAP
entry
of
materials
and
creation
of
purchase
orders
5.
Site
Planner(SAP-PS):
Planning and real time scheduling of WBS elements of WECS as per plan vs actual.
Creating PWOW for each week so as to avoid any deviations in project completion time.
Dealing
with
Manpower
log
and
Tackles
Log
used
in
project.
Daily
basis
updation
and
confirmation
of
actual
installations
6.
Operation
and
Maintenance:
Checking
of
wind
turbine
generator
as
per
schedule
Checking of all Electrical & Electronic controller as per check list and protocol
Attending
emergency
breakdowns
of
33kv
TX.
Lines.
Construction
of
33kV
Transmission
Lines.
7.
Quality
Control
&
Quality
Checking:
Monitor the progress of the projects and adopt various measures to enhance work with Safety
and
quality
Insuring all time availability of critical material at site.
Resume
PROFILE
Exceptional analytical, troubleshooting organizational, communication, prioritization, and problem solving and
leadership
skills
with
ability
to
create
and
sustain
high
work
tempo.
Electrical Engineer with years of experience in Tender Analysis, Awarding of Contracts, Purchase, Project
Management, Planning & Construction of Sub. Stations & Transmission Lines, Maintenance of electrical installations
and
infrastructure,
and
Power
generation
with
International
exposure.
Conducted technical performance and reliability evaluations, recommended and engineered repair on power
plant generators. Rich experience in Project Planning and Scheduling, Coordination & Engineering in Substation &
Distribution
RGGVY
Projects.
An effective communicator with excellent relationship, management skills and strong analytical, problem solving and
organizational
abilities.
Analyzed and interpreted blueprints, data and manuals of equipment to determine specifications, inspections and
testing procedures, formulas and measuring instruments required. Ensured that the contractors performance is in line
with
the
project/
contract
requirements.
Coordinating the substation equipment and material delivery with the schedule of the project. Lead the site team in all
aspects
for
safer
work
environment.
Advising management for any technical or engineering changes in substations and all associated civil and execution
works. Providing the Site Progress Reports, Monthly Fund Requirements & MIS reports as required by the project
plan.
Preparing RA bills and Invoicing of supplied material to Client and also verification and processing the
contractors
bill.
Pre-Project Advisory :Survey and Site investigation, Environmental and socio-economic impact assessment
Design Engineering: Detailed Feasibility Report (DFR), Geotechnical studies, GIS mapping and survey
Preparation
of
detailed
engineering,
design
and
drawings
Project Management: Detailed Project Report (DPR) Project planning, scheduling and control Budgeting and cost
control,
Contract
administration.
Core
Competencies:
Project Design/ Development & #61618; Project Implementation & #61618; Power Quality Support & #61618;
Troubleshooting & #61618; Cross-functional Coordination & #61618; Team Management & #61618; Client Relations
Management & #61618; Complete Project Life Cycle & #61618; Strong Interpersonal Skills
Supervision, Monitoring and quality control consultancy services for construction/ Commissioning of 33/ 11KV SubStations.33/
11KVLines
Responsible for smooth execution of the projects, cash-flows, Profit & Loss statements of the project and
enhancement of profitability. Setup monitoring mechanism, review project and implement remedial measures
periodically.
Lead and Supervision of all execution of electrical works inspection of quality and quantity of works carried by
state
electricity
distribution
boards
under
scheme.
Planning,
material
handling,
supervision
and
all
execution
of
work
Erection of 11 KV HT line, LT line, Distribution transformer center and single point lighting connection.
Actively and efficiently involved in Erection, Construction, Testing and Commissioning of new 33KV Lines,11 KV
Lines, LT Lines, New 33/ 11 KV Power Substations, substation installation, Augmentation of capacity of existing
33/
11
KV
Power
Transformers
and
Installation
of
Circuit
Breakers.
Providing HT/ LT Meeting arrangement in 33/ 11 KV New power sub stations and on distribution Transformers, sub
station
and
installation
of
small
capacity
Distribution
Transformers
and
related
works.
Efficiently doing quality surveillance of all activities from Engineering Survey, erection, construction up to final
testing
and
commissioning
during
execution
of
the
work.
Adept in designing test plans and gap analysis to ensure that Business Requirement and Functional Specification are
fulfilled. Actively Participated in Renovation & Modernization(R & M) of 400KVA,250KVA,100KVA,63KVA,
25KVA,10KVA
Transformer.
Participating in smooth implementation of the project and extending post-implementation, application maintenance
and
technical
support
Testing
and
Pre
commissioning
of
3.3KV
Capacitor
Panel
VCBS.
Annual
Maintenance
of
HT
Switch
Gear
(33/
11/
6.6/
3.3KV)
and
transformers.
Relay
testing
and
Calibration
during
Annual
Maintenance
Work
Maintaining quality procedures related to the project & submitted the same to the Consultant.
As per the Approved PGCIL Drawing Prepare the Structures Erection, Equipment Erection & Earthing for
Equipments
and
Structures
Project Work handling as per Planning & Prepare the Document Related
Resume Format
How to Format Your Resume
Use the following information to format your resume. Generate a list of information to include on your
resume, and then compile the details to format your resume into a customized resume to send to employers.
Resume Format
Your Contact Information
First Last Name
Street Address
City, State, Zip
Phone (Cell/Home)
Email Address
Objective (optional)
What do you want to do? If you include this section it should be a sentence or two about your employment
goals. A customized objective that describes why you are the perfect candidate for the job can help your
resume stand out from the competition.
Career Highlights / Qualifications (optional)
A customized section of your resume that lists key achievements, skills, traits, and experience relevant to
the position for which you are applying can serve dual purposes.
Experience
This section of your resume includes your work history. List the companies you worked for, dates of
employment, the positions you held and a bulleted list of responsibilities and achievements.
Company #1
City, State
Dates Worked
Job Title
Responsibilities / Achievements
Responsibilities / Achievements
Company #2
City, State
Dates Worked
Job Title
Responsibilities / Achievements
Responsibilities / Achievements
Education
In the education section of your resume, list the colleges you attended, the degrees you attained, and any
special awards and honors you earned.
College, Degree
Awards, Honors
Skills
Include skills related to the position / career field that you are applying for i.e. computer skills, language
skills.
References available upon request
There is no need to include references on your resume. Rather, have a separate list of references to give to
employers upon request.