Itemize Cost Breakdown & Bill Quantities: /lot /lot /lot /lot /lot

The document provides a cost breakdown and bill of quantities for electrical works on a construction project. It includes 7 sections - general requirements, roughing-in works, installation of wires and cables, installation of panel boards, supply and installation of utility boxes and pull boxes, supply and installation of wiring devices, and lighting fixtures. The total cost for the electrical works is estimated to be PHP 351,129.61 after calculating the quantities of materials and labor required for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views4 pages

Itemize Cost Breakdown & Bill Quantities: /lot /lot /lot /lot /lot

The document provides a cost breakdown and bill of quantities for electrical works on a construction project. It includes 7 sections - general requirements, roughing-in works, installation of wires and cables, installation of panel boards, supply and installation of utility boxes and pull boxes, supply and installation of wiring devices, and lighting fixtures. The total cost for the electrical works is estimated to be PHP 351,129.61 after calculating the quantities of materials and labor required for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Itemize Cost Breakdown & Bill Quantities

(Electrical Works)

Item#

Description

I.

Unit

GENERAL REQUIREMENTS

1.0
2.0
3.0
4.0
5.0

II.

Mobilization/Demobilization
Temporary Facilities
Provision for Temporary Supply of Water, Electricity & Telephone
Insurance, Bonds & Permits
As-Built Shop Drawings (CADD Generated)
Total - I

/lot
/lot
/lot
/lot
/lot

ELECTRICAL WORKS
ROUGHING-IN WORKS, CONDUITS, FITTINGS AND SUPPORTS, LABOR IN PLACE

A.

1.0

RSC Pipe
a. 25mm. dia.
b. 32mm dia.
c. 40mm. Dia
d. 50mm. dia.
e. 80mm. dia.
f. 90mm. dia.
2.0 PVC Pipe
a. 20mm. dia.
b. 25mm. dia.

/length
/length
/length
/length
/length
/length
/length
/length
Sub-total II.A

B.

INSTALLATION OF WIRES & CABLES INCLUDING COMPLETE SUPPLY OF


CONNECTORS (LABOR ONLY)

a. 3.5sq.m. THHN/THWN
b. 5.5 sq.m. THHN/THWN
c. 2.0 sq.m. THHN/THWN
d. 14 sq.m. THHN/THWN

/l.m.
/l.m.
/l.m.
/l.m.
Sub-total II.B

C.

INSTALLATION OF PANEL BOARDS, CIRCUIT BREAKERS, INCLUDING SUPPORT


AND ACCESSORIES (LABOR ONLY)

1.0 Panel PP

/assy
Sub-total II.C

D.

SUPPLY & INSTALLATION OF UTILITY BOXES, PULL BOXES INCLUDING


FITTINGS & SUPPORT, LABOR IN PLACE
1.0 Utility Box
2.0 Junction Box
3.0 Square Box 4"x4"
4.0 Pull Box
Sub-total II.D

E.

/pc
/pc
/pc
/pc

SUPPLY & INSTALLATION OF WIRING DEVICES INCLUDING COMPLETE SUPPLY


OF ACCESSORIES

a. One gang switch


b. Two gang switch
c. Three gang switch
d. Duplex Convenience outlet w/ ground
e. ACU outlet
f. Rance hood outlet
g. Range outlet

/set
/set
/set
/set

h. Exhaust Fan

/set

/set
/set
/set

Sub-total II.E
F.

LIGHTING FIXTURES INCLUDING TERMINALS & SUPPORTS (LABOR ONLY)

1.0
2.0

Recessed Mounted Pinlight (18 watts)


Circular ligth 36W

3.0

Braceret Light with 18w CFL

/set
/set
/set

Sub-total II.F
G.

TESTING AND COMMISSIONING

/lot
Sub-total II.L

H.

OTHER ITEMS OF WORK TO COMPLETE:

a. Conduit Fittings
b. Hanger & Supports

/lot
/lot
Sub-total II.M

Total II

GRAND TOTAL

ill Quantities

QTY

Unit Cost

1.00
1.00
1.00
1.00

50,000.00
15,000.00
20,000.00
30,000.00

1.00

10,000.00

Amount

50,000.00
15,000.00
20,000.00
30,000.00
10,000.00
125,000.00

2.00

173.00
2.00

1,228.00
1,677.00
1,887.00
2,305.00
5,128.00
6,706.00
80.60
122.10

2,456.00
13,943.80
244.20
16,644.00

413.00
130.00
632.00
30.00

19.34
29.59
46.74
73.68

7,988.25
3,847.09
29,537.78
2,210.49
43,583.61

1.00

33,000.00

33,000.00
33,000.00

45.00
34.00
2.00
2.00

51.00
62.00
87.00
1,200.00

2,295.00
2,108.00
174.00
2,400.00
6,977.00

738.00
1,372.00
1,072.00
7,567.00
1,215.00
-

6.00
7.00
4.00
23.00

123.00
196.00
268.00
329.00

4.00

303.75
233.00
2,059.00

1.00

3,000.00

3,000.00
14,964.00

49.00
4.00
2.00

377.00
3,122.00
1,500.00

18,473.00
12,488.00
3,000.00
30,961.00

1.00

30,000.00

30,000.00
30,000.00

1.00
1.00

20,000.00
30,000.00

20,000.00
30,000.00
50,000.00
226,129.61

351,129.61