DIRECTIONAL PLANNING
KICK OFF POINT
TARGET DEPTH
TARGET DEPARTURE
UPPER BUILD GRADIENT
LOWER DROP OR BUILD GRADIENT
HANG ANGLE
HANG LENGTH
558.00
8,460.00
2,661.00
3.00
5.00
15.00
534.00
TVD(FT)
TYPES OF HOLES
TVD(FT)
BUILD
HOR(FT)
BUILD-DROP
DEG/100FT
BUILD-BUILD
DEG/100FT
DEG
0.26 RADIANS
MD(FT)
MD
DEP
TVD
0
558
1,204
8,820
8,908
9,442
0
0
108
2,635
2,661
2,799
0
558
1,192
8,376
8,460
8,976
COMPUTED VARIABLES
RADIUS OF BUILD
RADIUS OF DROP
SLANT ANGLE
SLANT ANGLE (ITERATION)
1909.86
1145.92
0.3381989
0.3381989
1191.67
8376.38
8460.00
8975.80
DEPARTURES
TOP OF SLANT
TOP OF DROP
TOP OF HANG (TARGET)
BOTTOM OF HOLE
108.19
2635.13
2661.00
2799.21
MEASURED DEPTHS
TOP OF SLANT
TOP OF DROP
TOP OF HANG (TARGET)
BOTTOM OF HOLE
1203.91
8820.05
8907.60
9441.60
Page 1 of 2
RAD
RAD
19.3773711619 DEG
19.3773711619 DEG
325610646.xls
TRANSPOSE
MD TO TVD
1,500.00
<== MD==>
7,197.00
5697.00
DIFFERENCE IN MD
LOCATION
TVD
TVD
1,470.98
6,845.27
5,374.29
6,845.27
VERTICAL
BUILD
SLANT
DROP
HANG
DIFFERENCE IN TVD
TRANSPOSE
TVD TO MD
1,470.98
EQUIVALENT MEASURED DEPTH
LOCATION
MD
DEP
VERTICAL
BUILD
1,499.99
SLANT
DROP
HANG
DOGLEG SEVERITY
FIRST STATION
MEASURED DEPTH
INCLINATION
AZIMUTH
SECOND STATION
MEASURED DEPTH
INCLINATION
AZIMUTH
1,510.00
2.50
347.00
1,541.00
3.25
12.00
FT
DEG
DEG
FT
DEG
DEG
31.00
0.75
25.00
2.88
4.71
DEG/100FT
Page 2 of 2
206.42