Chapter 4 - Flexible Pavement
Chapter 4 - Flexible Pavement
Chapter 4 - Flexible Pavement
Flexible Pavement
Subtopic
Pavement purpose
Flexible pavement
Characteristic of flexible pavement
Flexible pavement surface layer, road
base, sub-base, sub-grade.(explain
function of the types of layer)
Sketch layer of flexible pavement structure
Pavement works
Preparation of materials used in the subbase and road base of flexible pavement
Priming cover -prime coat, tack coat
Pavement purpose
Load support
Smoothness
Drainage
Types of pavement
Flexible Pavement
Rigid Pavement
Flexible Pavement
Not constructed using concrete
Pavements with very low flexural strength
and are flexible in their structural
behaviour when under a load.
Characteristic of flexible
pavement
Elastic
Use bituminous
Easy to do road maintenance
Do not have any expansion joint.
Surface layer
Road Base
Sub-base
Figure 6.1
Construction Depth
Function of sub-grade
SUB GRADE is a layer of natural soil or filled soil
prepared to receive the pavement materials over it.
Function: to transfer the entire load coming to it to the
earth mass and provide a good support to the pavement
structure.
The strength properties of the soil sub-grade is
necessary to evaluate.
The following tests on soils are carried out to find out its
strength:
CBR test
Triaxial Compression test
Plate load test
California resistance value test
Pavement works
A.Preparation Sub-Grade Layer
B.Laid the sub-base course
C.Laid the base course
D.Spray the priming coat.
E. Laid the premix (pavement conrete
asphalt or bituminous pavement)
F. Construct road
B& C:
PREPARATION OF
MATERIALS USED IN THE
SUB-BASE AND ROAD BASE
OF FLEXIBLE PAVEMENT
Crusher run
Sand
Laterite
Dry Bound Macadam
Wet Bound Macadam
Dense Bound Macadam
Stabilized Soil
Method of construction:
Spreading coarse aggregate compact
7.5cm thickness
Rolling
compaction- rollers starting from edges
then shifted to the centre.
and
Method of construction:
Spreading coarse aggregate. WBM course compacted
thickness of 7.5 cm.
Rolling - Compaction rollers starting from edges and
then shifted to the centre.
Application of Screening dry rolling
Sprinkling and Grouting - Water is sprinkled, swept and
rolled. Additional screenings till coarse aggregates are
well bonded and firmly set. (2-5% water).
Application of Binding Material - in two or more
successive layers surface is sprinkled with water and
rolling is done.
Setting and Drying
Prime Coat
First application of low viscosity liquid
bituminous material over an existing porous
or adsorbent pavement material like WBM
base course
Objective is to plug the capillary voids and
bond loose material using a binder of low
viscosity
Allowed to cure for at least 24 hours
Function:
To seal the pores by penetrating into it.
To water proof underlying layer.
To coat and bond dust and loose minerals
particles.
To provide adhesion between the base and
superimposed layer.
PREPARATION AND
VARIETIES OF MATERIALS
31
a) Premix
asphaltic concrete
Asphalt concrete
Bituminous Macadam
used to cover the use of bituminous materials for bonding
together or preserving the surface of broken-stone roads in
a variety of ways
In some instances, the tar is only used to coat the surface
of a macadam road, with a view to prevent the formation of
dust and the raveling of the road
The other hands, tar is mixed with the broken stone used
in building the road to form a bituminous concrete before
laying it on the road
road must be very dry when the tar is applied
work should be done during warm
34
35
36
37
38
40
41
43
PREPARATION OF
PREMIX
Mechanical mixer used to mixing the aggregate
and the bituminous binder. Besides that,
improvised hand drum mixer may be used if
mechanical mixer is not procurable.
Bituminous binder(premixing) adopted as per
requirements of the gradation of the aggregates.
The upper limit raise when absorptive type hand
of aggregates used.
Tar used, the contents increase 10 %.
Mixture prepared and transport to the place by
using wheel barrow and hands carts.
44
45
rolling
A compacting temperature also influences the
strength characteristics of the resulting
pavement.
Min time should be allowed to lapse between
spreading the mix and rolling operation.
Length of bituminous laid, rolling is done
adopting 8 10 t roller.( commence at the
edges and progress towards centre
longitudinally)
The finished surface when the tested with a
template and the straight edges should show
no variation greater than 6 mm over 3 m
length.
46
CONSTRUCTION
OF ROAD
SHOULDERS
47
INTRODUCTION
Road shoulder is the reserved area alongside the
roadway to be used in the event of an
emergency or breakdown.
Not all county roads have shoulders, but where
present, road shoulders along collector or
community streets are normally unpaved.
Road shoulders are not travelling lanes, and
motorists should not use them as such.
48
49
Thank you..