Boq 15-3
Boq 15-3
Boq 15-3
.NO
DESCRIPTION
UNIT
QTY
LOT
ELECTRICAL INSTALLATIONS:-
1.1
LOT
LOT
GROUNDING SYSTEM:-
LOT
1.
TOTAL
Page 1 OF 8
UNIT PRICE
(S.R.)
TOTAL PRICE
(S.R.)
MATERIAL TAKE-OFF
5.1
5.2
5.3
EA
23
EA
87
EA
5.4
EA
11
5.5
EA
12
5.6
EA
18
5.7
EA
5.8
EA
Page 2 OF 8
MATERIAL TAKE-OFF
6
6.1
6.2
EA
20
EA
6.3
EA
6.4
EA
6.5
EA
6.6
EA
6.7
EA
6.8
EA
23
6.9
LOT
Page 3 OF 8
MATERIAL TAKE-OFF
7
:DISTRIBUTION PANELS
RATE AND PRICE SHALL BE SUPPLY AND
INSTALL THE FOLLOWING PANEL
BOARDS INCLUDING SCREW, WASHERS,
NUTS, CLAMPS,BOXES,CONNECTORS,
HANGER/SUPPORTS,DUCT
BANKS,MANHOLES,SLEEVES,EMT
PIPES,CABLES TRAY,ANY CIVIL WORK,
ALL FITTINGS,END BELL, ALL CIVIL
WORK SUCH AS EXCAVATION, DRILLING,
BACK FILLING, CONCRETE AND ANY
ACCESSORIES,
TESTING,COMMISSIONING,AND
EVERYTHING REQUIRED FO A COMPLETE
SYSTEM ACCORDING TO DRAWINGS AND
SPECIFICATIONS.
7.1
7.2
EA
EA
EA
7.4
7.3
LOT
7.5
MATERIAL TAKE-OFF
7.6
PB-L:EA
EA
3P
1P
1P
1 NOS
5 NOS
16 NOS
Page 5 OF 8
MATERIAL TAKE-OFF
8
8.1
LM
40
8.2
LM
20
8.3
LM
20
LM
20
LM
20
LM
30
8.4
8.5
4 x 35 MM + 10MM GR
8.6
MATERIAL TAKE-OFF
EXISTING FIRE ALARM SYSTEM IN THE SITE, ,
RISER DIAGRAM, ANY CIVIL WORK, AND
SPECIFICATIONS BY USING :-
SMOKE DETECTOR.
1.
HEAT DETECTOR.
EA
EA
69
9.3
ALARM BELL. 6.
EA
9.4
EA
EA
EA
LOT
9.2
9.5
9.6
10
11
12
2.
LOT
TOTAL PRICE
ELECTRICAL NOTES
1 Contractor must check the quantities according to the drawings before
Bidding and shall be responsible for his price without additional cost.
2 Supply, Installation, Testing & commissioning of all electrical works
As per drawing, schedules and specification are included.
Page 7 OF 8
MATERIAL TAKE-OFF
3 Wiring, Sleeves, Manholes, Cables tray, Duct banks, Conduits, Boxes,
Main Junction Boxes, Hangers/Supports, Fitting
For a complete system are included
4 Exposed run conduit will be EMT (Electrical metallic tube) complete with
all accessories screw type, flexible liquid tight metal if required and
Concealed conduit in wall or incased on concrete will be PVC NEMA TC 2
Or TC 8, EPT-A , SAPPCO or approved equal.
5 Exposed conduit inside Electric & Mechanical rooms shall be galvanized
Rigid steel conduit.
6 Building wire THWN / Riyadh, Jeddah wire or Middle East Co.
7 Panel board GE, Electra type or Mitsubishi. Made in Japan.
8 Any civil work such as excavation, drilling, back-filling, red tiles, fine sand,
Concrete, manhole or hand hole are included, shall be done by
Electromechanical contractor.
9 Disconnect switches will be Esq. Type or G.E. or approved equal.
10 Cable tray and ladder 1.5mm thickness mill galvanized steel with cover.
11 Wiring devices shall be Legrand Pass & Seymour type, U.S.A made.
or approved equal.
12 Fire alarm system will be conventional pyrotronics type or simplex
or notifier.type OR as existing in site.
13 Telephone cables & devices shall be orthotics products
or approved equal.
14 Small hand hole 50 x 50 x 80cm are included for the outdoor lighting
And site works.
15 Outdoor lighting cable shall be type XLPE ins., P.V.C sheathed single
or Multi core.
16 Feeder cable type shall be Riyadh,Jeddah cable XLPE / PVC
1 KV/0.6 KV or approved equal.
Page 8 OF 8