Telecommunication Facility
Co-ordination Committee
29 April 2005
Mr Andrew Haire
Senior Director (Policy & Competition Development)
Infocomm Development Authority of Singapore
Fax: (65) 6211-2116
Dear Mr Haire
PUBLIC CONSULTATION - REVIEW OF THE CODE OF PRACTICE FOR
INFO-COMMUNICATIONS FACILITIES IN BUILDINGS (COPIF)
1.
2.
Yours sincerely
Encl
TFCC
Telecommunication Facility
Co-ordination Committee
2.
We suggest to update the following to bring the draft COPIF 2005 more
inline with the industry practice:
a)
b)
c)
d)
e)
f)
g)
TFCC
Telecommunication Facility
Co-ordination Committee
h)
i)
j)
3.
TFCC noted that it is not stated clearly in draft COPIF 2005 that for
development with underground basement, where the lead-in pipes or
pipeline system stops at the retaining wall, cable trays must be
provided from the retaining wall to the MDF room, TERs and risers.
Furthermore, TFCC is of the view that as such cable trays are essential
to the roll out of telecommunication services, they should also be
included as in joint inspection checklist.
4.
TFCC is of the view that where lead-in pipes over-cross the drain,
developer or owner when seeking Drainage Department for approval,
should also undertake to the Drainage Department for any subsequent
diversion work by Drainage Department.
5.
TFCC is of the view that for cluster landed housing with more than 30
units, a MDF room should be provided to allow telecommunication
system licensees to install their equipment for the provision of
telecommunication services. The size shall follow requirement in Table
6.3.4 of draft COPIF:2005.
TFCC
Telecommunication Facility
Co-ordination Committee
6.
TFCC is of the view that separate ELCB and its electrical accessories
should be provided for the provision of different services (to denote
BCS or non-BCS equipment) into the development.
7.
8.