0% found this document useful (0 votes)
33 views3 pages

Summary: C1 1,608: Reinforcement Details of Slab

The document provides details of the column, footing, slab, and beam reinforcement for a structure. It summarizes that column C1 is 1'x1' in size. Footing F1 supports columns A1, A2, A4, B1, B3, C2, C3, and C4 and is 5'6"x5' in size. The two-way slab is 125mm thick with 8mm bars spaced 150mm for short dimensions and long dimensions. Beams are 14"x9" with bottom bars of 3 #16 bars and top bars of 2 #16 bars with #12 stirrups spaced at 110mm for end ties and 150mm for mid ties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views3 pages

Summary: C1 1,608: Reinforcement Details of Slab

The document provides details of the column, footing, slab, and beam reinforcement for a structure. It summarizes that column C1 is 1'x1' in size. Footing F1 supports columns A1, A2, A4, B1, B3, C2, C3, and C4 and is 5'6"x5' in size. The two-way slab is 125mm thick with 8mm bars spaced 150mm for short dimensions and long dimensions. Beams are 14"x9" with bottom bars of 3 #16 bars and top bars of 2 #16 bars with #12 stirrups spaced at 110mm for end ties and 150mm for mid ties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Column Summary

M20/ Fe 500

C1

size: 1x1

Summary:
A1,A2,A3,A4,B1,B2,
C3,C4

C2

4-16+4-16
4-20+4-16

B3,B4,C2

1,608

2,064

8
8

4' c/c
4' c/c
4' c/c

6' c/c
6' c/c
6' c/c

Footing Summary
Fe 415 /M20

F1

A1,A2,A4,B1,B3,C2
,C3,C4

F2

A3,B2,B4

size
5'6"*5'
6"
6'6"*6'
6"

c/
c
m
m
11
12
0
11
12
0

dia
ba
r

depth(mm)
400
400

Reinforcement Details Of Slab:

Two way slab


Reinforcement
Cantilever slab

short
8 mm @ 150mm c/c

long

thickness

8 mm @ 150 c/c

125mm

cover
20mm

Reinforcement

10 mm @ 150 mm c/c

10 mm @ 150 c/c 125 mm

20mm

BEAM DETAILSsize:14x9
REINFORCEMENT
FLOOR

no
.

16

area

bottom

top
no.

no.

no.

Top

Bottom

16

12

339

339

Tie
Beam/ground

All

Ground

All

16

16

16

16

804

1st

All

16

16

16

16

804

Top

Al
l

Strap

16

16

12

16

16

Stirrups

total

603

12

628

end
ties

m
id ties

8 @110
mm c/c

8
@150
mm c/c

804

8 @110
mm c/c

8
@110
mm c/c

804

8 @110
mm c/c

8
@150
mm c/c

8 @110
mm c/c

8
@150
mm c/c

8 @110
mm c/c

8
@150
mm c/c

603

628