Bilge System
Bilge well
Volume max 0,57 m
Tinggi bilge well minimum
0,5 tinggi double bottom
2.
3.
An Oil Record Book (ORB) entry must be made at this time for the transfer
AND the disposal method.
Separated
Bilge Oil Tank
(SBOT)
Drain &
leakage
Incident
Cleaning &
maintenance
Water from
purifier sludge
tanks
Water from
wash oil tank
Condensate
from air cooler
Bilge Water
Tank
If the effluent oil content is greater that 15 ppm, the bilge pump will stop,
securing the operation, or, if fitted with a 3-way valve, the effluent will be
diverted back to the Bilge Water Tank.
Oil that has been separated out, will be diverted to the Separated Bilge Oil
Tank.
Oily Water
Separator
Overboard
Bilge Water
Tank
Separated Bilge
Oil Tank (SBOT)
Oil water
content
15 ppm
Overboard
Bilge Water
Tank
Ashore
Oil burner
13
14
BALLAST SYSTEM
Component of tank
Filling pipe
Discharge pipe
Drain pipe
Vent pipe
Sounding pipe
Overflow pipe
manhole
Ballast piping
Ballast pump
2 independent power driven ballast
pump
Control features
Provide with a means of remote
operation from a central ballast control
Tank leveling
Type of ballast
After
24
Dedi Budi P ST MT
27
and a capacity of at least 5 L/min/m2 (for spaces with a deck height of 2.5
meters or more.
Foam Fire
Extinguishing
Systems
Low Expansion Foams
High-Expansion Foams
33
Mechanical
Foam
Extinguishers
Stored-Pressure
Water
Extinguishers
34
POWDER
CartridgeOperated Water
Extinguisher
Dry powder
CO2
Chemical Foam
Portable Fire
Extinguishers
Dry chemical
WATER
Soda-Acid
Extinguishers
Carbon-dioxide
FOAM
Foam
Dry Chemical
Water
Fuel Oil
Settling Tank
Feed system:
settlg tk filter heater centrifuge service tk (HFO)
stoge tk filter heater centrfuge service tk (MDO)
Supply system:
service tk supply pump circltng pump
Circulating system:
circltng pump heater filter M/E venting box
Fuel Oil
Purifier
FO Transfer System
FO storage tank
Tangki FO selama pelayaran (antar
bungkering)
Vol = f (sfoc, BHP, wkt antar
bungkering) + allowance (typically 3 ~
5 %)
Vol tank MDO ditambah utk kebt A/E
Heater
Pemanas dlm tank agar HFO bisa
dipompa
Daya= f [debit transf pump, T (up to
50 C)]
Sistem: steam heater (coil pipes) dg
boiler sbg pensuplai steam
Letak: di sekitar suction pompa
Ukuran pipa
Q = f (Vol settl tank, Wkt pengisian)
Valiran = Ref to project guide (typically
0.6 m/s utk HFO dan 1.0 m/s utk
MDO)
Din pipa = f (Q,Valiran)
Tebal pipa: klas N atau M (tabel 11.4.
BKI)
Bahan baja, utk HFO perlu insulasi
Dilarang lewat: L.O, F.W, Cargo tanks,
living quarter
FO settling tank
FO transfer pump
Q = f (vol settl tk, wkt pengisian)
Mengendapkan f.o dari kontaminan
(terutama HFO)
Valiran = Ref to project guide (typically
0.6 m/s utk HFO, dan 1.0 m/s utk
Jumlah 2 units, dipakai bergantian
MDO)
(rules BKI)
Head total = head statis + head loss
Letak: sebaiknya selevel dg separator
total
dan service tank (constraint head
separator)
Head statis = elevasi (settlg tk stoge
Vol: f.o harus mengendap min 24 jam
tk)
Head loss :
Vol = f (sfoc, BHP, 24 jam) + allowance
Friction = f (L pipa, D pipa, Valiran,
faktor friksi)
Accessories = K (V)2/2g (fittings,
valves, heater, filter, etc)
Letak: tanktop NPSH constraint
(stoge thd pompa)
Jenis: screw atau gear pump dg Q dan
H yg memenuhi
FO Feed System
Ukuran pipa
FO Feed Pump
Q = f (Vol service tk, Wkt pengisian)
Q dan Valiran = Ref to above
Valiran = Ref to project guide (typically
Head total = head statis + head loss
0.6 m/s utk HFO dan 1.0 m/s utk
total
MDO)
Head statis = elevasi (service tk
settlg tk)
Din pipa = f (Q,Valiran) untuk HFO perlu
insulasi
Letak: platform constraint head dari
Tebal pipa: klas N atau M (tabel 11.4.
centrifuge
BKI)
Jenis: screw atau gear pump dg Q dan
H yg memenuhi
FO Pre-Heater
Memanaskan FO agar mudah di
separasi
Heat capcty = f (BHP) ref to proj
guide
Type: plate or tube heat exchanger
FO service tank
FO separator
Memisahkan HFO dari campuran air
Mensuplai f.o setelah dipurifikasi ke
dan impurities lain
M/E
Q = f (BHP) ref to proj. guide
Letak: ref to proj. guide (elevasi dischg
(typically 0.2 lt/BHP-h)
thd inlet di M/E) sebaiknya di platform
Letak: sebaiknya selevel dg settling tank
Vol = f (sfoc, BHP, wkt) + allowance
(constraint head yg dimiliki separator)
Wkt: by desain (8, 10 atau 12 jam)
Jumlah: 2 (HFO) atau 1 (MDO) but not
a must
FO Supply System
Ukuran pipa
FO Supply Pump
Q = f (BHP) ref to proj guide +
Q dan Valiran Ref to the above
tolerance 0% to 15% to cover back Head total = Hz + Hp + Head loss
flushing of filter
total
Valiran = Ref to project guide (typically
Hz = elevasi (circl pump service tk)
0.6 m/s utk HFO dan 1.0 m/s utk
Hp = delivery pressure (ref to proj
MDO)
guide ~ 4 bar)
Din pipa = f (Q,Valiran) untuk HFO perlu
H loss tot = H friction + H loss
insulasi
accessories
Tebal pipa: klas N atau M (tabel 11.4.
Letak: tanktop
BKI)
Jenis: screw atau gear pump dg Q dan
H yg memenuhi
FO Circulating System
Ukuran pipa
FO Circulating Pump
FO heater
Memanaskan FO viscositas FO pd
M/E
Venting Box
D
C
A.
B.
C.
D.
Transfer system
Feed system
Supply system
Circulating system
actuator, piston)
2.
Mengeliminasi Gesekan
Tgt : viskositas, kecepatan, temperatur, beban
Mengurangi keausan
DETERJENSI: Pelunak & penyapu kotoran
PENETRAL ASAM: Kandungan Sulfur f.o. asam
(korosif)
Pemindah panas
Memindahkan panas dari komponen panas ke dingin
Membentuk sekat
Sekat antar parts: Tgt viskositas, putaran, beban
Pembersih kotoran
Sifat deterjensi: pelunak dan penyapu
Component LO
LO Pipes
Usually galvanized
(recommended)
LO Pumps
Crosshead Engine
Independent cylinder oil
system for lubrication of
piston ring pack
Consumable
High viscosity with a TBN
matched to the anticipated
sulfur content
Cylinder oil is stored in a
Storage Tank & is
transferred daily to a small
capacity measuring tank,
where it gravity flows to
the cylinder lubricators on
the engine itself.
Cylinder Oil
Day Tank
Cylinder
Lubricators
Stuffing Box
Drain Tank
B
A.
LO System
B.
LO purifying system
Cooling System
Closed System
a)
Open System
b)
c)
Sea Chest
Pipa
Central cooler
Central cooler
FW cooling pump
A.
Sea water
B.
Fresh water
Starting System
Compressor
59
Dedi Budi P ST MT
The compressed air provides the head or pressure to supply the water when
required
60
Dedi Budi P ST MT
Sewage Treatment
Black Water
Human body waste and waste from
toilets, urinals, soil drains, also
referred to as sewage
Waste drains
Drains which collect wastewater
(gray water) from showers, laundry
and galley, etc
Gray Water
Refers to ship generated
wastewater which originates from
culinary activities, bathing, laundry
facilities, deck drains and other
waste drain
Soil drain
Drains which collect sewage from
toilets and urinals
Wastewater
Combination of the liquid and
water carried waste from soil &
waste drains of ship
Sewage
Wastes of human origin from water
closets and urinals, drainage from
space containing living animals
66
Dedi Budi P ST MT
Physical
remove solids from wastewater
Biological
remove organic material from wastewater
Chemical
increase the removal of these new forms by physical processes
The sewage treatment is usually a
combination of the three principal methods,
such as:
mechanical-chemical,
mechanical-biological and
chemical-biological
69
2)
70
3)
4)
71
5)
6)
Sludge treatment
The sludge production depends on
the treatment process.
The sludge that comes straight
from the process is centrifuged.
After the decanter centrifuge, the
possible sludge handling techniques
are holding, incinerator, steam
dryer, filter press or an alternative
sludge conditioning process so that
combustion is possible.
Dedi Budi P ST MT
Cargo pump may be driven by; steam turbines, diesel engines, or electric motors.
The drivers may not be located in the pump room of a crude oil carrier because of
the potential for an explosion of the cargo vaporous
73
Dedi Budi P ST MT
for vapor recovery should have the following additional safety feature :
A remote cargo tank level indicating systems operable without openings the tank
(required 98% level )
A cargo tank high levels alarm systems (required 98% level )
A Cargo tank overfill indicating systems, which is independent of the high level
alarm and is timed to allow the operator to prevent an overflow
Tank pressure vacuum relief valves, which will open in the event of failure the
vapor recovery system and are of sufficient size to discharge a volume of vapor
corresponding to 1.25 times the maximum cargo loading rate without causing
pressure in the cargo tanks to exceed the design value.
74
Dedi Budi P ST MT
Loading-unloading arrangement
75
Dedi Budi P ST MT
Advantage
Any tank can be discharge by any
pump
Thus different grade of the cargo can
be loaded
76
Disadvantage
Expensive extra length of the piping
required
Extra bend is required
Risk of leakage from radius bend
exists
Advantage
Quick loading unloading
Short pipe line, less bend, leak is
minimized
Better suction, less loss of pressure
77
Disadvantage
Control leakage is difficult
System is very inflexibility
78
Dedi Budi P ST MT
Main sources of
ignition on tankers:
Smoking
Electrical equipment
Sparks
Lighting
Metal
Galley
Static electricity
Domestic equipment
Ship to shore electric
Spontaneous
combustion
79
Scrubber
Effectively cool the volume of gas
and remove (at least 90%) solids
and sulfur combustion product
direct contact between the flue gas
and large quantities of sea water
Internal part should be constructed
of corrosion resistant (rubber, glass
fiber epoxy resin, etc.
Demister Units
Removed entrained water from the
IGS gas stream
80
Dedi Budi P ST MT
Blowers
At least 2 blowers are required
125% of the maximum rate of
discharge capacity
Suitable shutoff arrangement shall
be provided on the suction and
discharge connections of each
blower
If the blowers are to be used for
gas freeing, their air inlet shall be
provided with blanking
arrangement
Operational models :
Inerting of empty tanks
Inerting during loading &
Discharge
82
Dedi Budi P ST MT
low price
Simple operation
Drainage arrangement
Slop tank
Annex I requirement :
Nozzle diameter