10 Project Forms That A QA - QC Engineer Must Have - Quality Assurance and Quality Control in Construction

This document describes 10 forms that are commonly used during construction projects: the Material Submittal Sheet (MSS) for submitting materials, the Request for Information (RFI) for clarifying drawings, the Subcontractor’s Approval (SA) for approving subcontractors, the Confirmation of Verbal Instruction (CVI) for confirming verbal instructions, the Inspection Request (IR) for requesting inspections with at least 24 hours notice, the Daily Report and Weekly Report for tracking daily and weekly progress, the Concrete Pouring Request (CPR) for requesting concrete pours, and the Non-conformance Report (NCR) for reporting issues and withholding payments until resolved. Sample templates for each form can

Uploaded by

balaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
246 views1 page

10 Project Forms That A QA - QC Engineer Must Have - Quality Assurance and Quality Control in Construction

This document describes 10 forms that are commonly used during construction projects: the Material Submittal Sheet (MSS) for submitting materials, the Request for Information (RFI) for clarifying drawings, the Subcontractor’s Approval (SA) for approving subcontractors, the Confirmation of Verbal Instruction (CVI) for confirming verbal instructions, the Inspection Request (IR) for requesting inspections with at least 24 hours notice, the Daily Report and Weekly Report for tracking daily and weekly progress, the Concrete Pouring Request (CPR) for requesting concrete pours, and the Non-conformance Report (NCR) for reporting issues and withholding payments until resolved. Sample templates for each form can

Uploaded by

balaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

2.

MaterialSubmittalSheet(MSS)
Thisformwillusetosubmitmaterialsforsiteuse.Makesurethatrequiredfieldorspacestofillup
arecompletelyfilledwithcorrectdescriptionssuchas:Supplier,MaterialDescriptionetc.
YoucanseehereandsaveastheforminPDFordownloadMaterialSubmittalFormwordfile.
3.RequestforInformation(RFI)
Thisformwilluseifthereissomethingthatisnotclearinthedrawingtobetterunderstandorclarifycertainarea
ofthework,socontractorwillsendanRFItotheEngineerorConsultantforclarification.SeeheretheRFIform
inPDFordownloadRFIFormwordfile.
4.SubcontractorsApproval(SA)
ThisformwillusetosubmittotheEngineerforapprovalofanysubcontractorthattakesubcontractsworkina
project.SeeheretheSAform.
5.ConfirmationofVerbalInstruction(CVI)
ThecontractorwillusethisformtoconfirmtotheEngineerorConsultantfortheverbalinstructionhestated
duringmeetingorphonecallsorsitejointinspection.SeeheretheCVIformordownloadCVIformexcelfile.
IftheworkproceedswithoutsubmittingCVIisperformedatthecontractorsrisk.
6.InspectionRequest(IR)
Thisformwilluseifthereispartofactivitythatisreadyforinspection.Theinspectionrequestshallbe
submitted24hoursbeforeinspection.IRshallnotbeacceptedbytheEngineerifthetimeofinspectionisless
than24hourssotakecareaboutthetimeitmightcreatedelaysonyourprojectifitisaccumulated.
Succeedingactivitycannotproceedwithouttheapprovalofthepreviousactivity.Unapprovedinspectionrequest
canbethemediumtoholdpaymentsforrequestedprogressbillingofthecontractor.Itisalwaysnecessaryto
getapprovalforyourinspectionstoavoidpaymentsdelayissue.SeeheretheIRforminPDFordownloadIR
formexcelfile.
7.DailyReport
Thisformwillusetolistdownalltheactivityonsiteondailybasisincludingthemachineries,plant,manpower,
weatherreport.DownloadDailyReport.
8.WeeklyReport
Thisformwillusetolistdowntheweeklyprogressonsiteincludingpercentagecompleteoftheactivities.
DownloadWeeklyReportformwordfile.
9.ConcretePouringRequest(CPR)
Thisformwillusetorequestpouringconcrete.ItshallbesenttotheEngineerorConsultantonedayor24hours
beforethetimeofpouring.
10.NonconformanceReport(NCR)
ThisformwillusefornonconformitynoticedbytheEngineerandshallbeissuedtocontractor.Nonconformity
willexistifthespecification,drawingandotherstandardsarenotfollowedduringtheexecutionoftheproject.
TheNCRissometimesusedtoholdthepaymentsofthecontractorsbilling,nopaymentsshallbemadeunless
NCRisrectifiedandapprovedbytheEngineer.SeeheretheNCRformordownloadNCRformwordfile.
Thesearealltheprojectformswehandledfromthestartanduntilcompletionoftheproject.
Ifyouhavesuggestionsthatcansupplementtotheabovedocumentsyoumaywritedownyourcommentbelow.
Thesoftcopiesoftheformsareembeddedabove,youcandownloadit.Thankyouforvisitingthisblog.