8121-E-Dn-17 (R0) .
8121-E-Dn-17 (R0) .
8121-E-Dn-17 (R0) .
Ltd
OFFICE OF ORIGIN
VASHI, NAVI MUMBAI
OWNER
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
CONTRACTOR CLIENT
L & T CONSTRUCTION TRANSPORTATION INFRACTRUCTURE
PROJECT
CONSTRUCTION OF ELEVATED ROAD BETWEEN JINZIRA BAZAAR AND
BATANAGAR ON BUDGE BUDGE TRUNK ROAD IN KOLKATA
TITLE
DESIGN OF STROM WATER DRAIN
DATE
28-Feb-15
Rev.
No.
(R0)
MODIFICATIONS/
PURPOSE OF ISSUE
PREPARED
DATE :
28-Feb-15
APPROVED
CHECKED
MVS
PAGES :
1 +
11
=
12 Pg.
ASG
REV.NO
(R0)
Date :
28-02-2015
Note No : 8121/E/DN-17(R0)
By :
PTM
Sheet No : 1
Item
Sheet No.
10
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
8121/E/DN -017(R0)
FP Level
t1
Road Level
t2
t2
w
j = 1 - k/3
In cover slab
bef
b / lo
a
a
=
=
=
=
8.33 Mpa
0.26
0.91
= 0.981
w + t2
= 1.100 m
t1 x rc
0.567 kNm / m
wL
2
5.00 kN / m
0.756 kNm / m
=
wL x l2 / 8
Ld
2
3.75 kN / m
wd x l2 / 8
M25
Q = 1/2cjk
= 10.00
240 Mpa
=
25 % overstressing.
300 +
-----
2.000 /
1.100 = 1.818
3 .for simply supported slab
0.550 m;
bw = 0.300 m
2 x
150 =
bw
=
600 mm = 0.600 m
300 mm = 0.300 m
a
3
3
bef = (1/2) x
3.00 x
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
0.550 x ( 1 -
40/1.25 /(
0.550 /
0.600 x
1.100 )
8121/E/DN -017(R0)
0.300
0.713
2
74.854 kN / m - Part udl
0.713 ) =
2
74.854 kN / m
0.600
1.100
ML2 =
= Md + ML =
0.567 +
drqd = Sqrt(M/QB) =
d =
150 40 -
Ast = M/sstjd
0.600 /4 )
8.982 kNm / m
8.982 =
9.550 kNm / m
98.7 mm
4 =
106 mm
2
411 mm / M width
4
8121/E/DN
-017(R0)
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
FP Level
t1
t2
h1
Road Level
t2
h
100
100
100
0
mm
mm
mm
mm
w
t3
p2
t3 c
p1
t4
p3 p4
40 mm
0.279
3
25 kN/m
3
20 kN/m
rs =
2
w
Pedestrian LL over cover slab
5 kN/m
L =
Live load surcharge for carriageway side wall, hs =
1200 mm
Coefficient of friction between cover slab & wall top, m =
0.5 m
Density of backfill
M25
8.33 Mpa
Modular ratio,
Permissible tensile stress in HYSD bars reinforcement, sst
Neutral axis depth factor, k = 1 / (1+sst/mscbc)
In drain walls & base slab
Lever arm factor,
j = 1 - k/3
In drain walls & base slab
= 10.00
=
240 Mpa
0.26
0.91
= 0.981
kars x t1 =
p2 =
kars x h =
2.250 kN
0.788 kNm / M
2
0.837 kN / m
2
3.906 kN / m
0.607 kNm / M
28-Feb-2015
Note No:
By :
PTM
Sheet No:
2
6.696 kN / m
2
3.348 kN / m
kars x hs =
kars x h' =
p2 =
where h' = h + t1 - h1
=
600 mm
BM due to earth pressure, Ms = p1 x h'2/2 + 0.42 x p2 x h'2/2 =
47.8 mm
50 mm > Required, O.k.
2
205 mm / M width
1.458 kNm / M
2.246 kN-m/M
5
8121/E/DN
-017(R0)
Date:
= (w + 2t2 x t1 x rc)
=
(w + 2t2) x wL
4.500 kN
2*(t2 + t3)/2*h*rc
6.000 kN
=
0.000 kN
14.000 kN
Base pressure, pb =
2
11.667 kN/M
14.000 / (w+2(t3+c)) =
w + t3 =
3.500 kN
1.100 m
C/L
7.00
0.55
7.00
0
2
11.667 kN/M
0.600
Design BM, M =
0.00 x
0.60 +
7.00 x
=
Design BM = max (
2.246 ,
1.750 ) =
0.55 11.667 x
1.750 kN-m/M
2
0.600 /2
2.246 kN-m/M
47.8 mm
50 mm > Required, O.k.
2
205 mm / M width
6
8121/E/DN
-17(R0)
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
FP Level
t1
t2
h1
Road Level
t2
h
100
150
150
0
mm
mm
mm
mm
w
t3
p2
Density of backfill
t3 c
p1
t4
p3 p4
40 mm
0.279
3
25 kN/m
3
20 kN/m
2
wL =
Pedestrian LL over cover slab
5 kN/m
Live load surcharge for carriageway side wall, hs =
1200 mm
Coefficient of friction between cover slab & wall top, m =
0.5 m
M25
8.33 Mpa
Modular ratio,
Permissible tensile stress in HYSD bars reinforcement, sst
Neutral axis depth factor, k = 1 / (1+sst/mscbc)
In drain walls & base slab
Lever arm factor,
j = 1 - k/3
In drain walls & base slab
= 10.00
=
214 Mpa stress in steel
limited to 214 Mpa
=
0.28
0.91
= 1.059
kars x t1 =
p2 =
kars x h =
2.250 kN
1.125 kNm / M
2
0.837 kN / m
2
5.580 kN / m
1.590 kNm / M
28-Feb-2015
Note No:
By :
PTM
Sheet No:
2
6.696 kN / m
2
5.022 kN / m
kars x hs =
kars x h' =
p2 =
where h' = h + t1 - h1
=
900 mm
2
BM due to earth pressure, Ms = p1 x h' /2 + 0.42 x p2 x h'2/2 =
3.566 kNm / M
4.691 kN-m/M
7
8121/E/DN
-17(R0)
Date:
= (w + 2t2 x t1 x rc)
=
66.6 mm
75 mm > Required, O.k.
2
323 mm / M width
4.500 kN
6.000 kN
(w + 2t2) x wL
=
Weight of side walls = 2*(t2 + t3)/2*h*rc
Weight of soil fill on base slab heel =2* c * (h+t1)*rs =
Total Load
=
0.000 kN
16.750 kN
Base pressure, pb =
2
12.885 kN/M
16.750 / (w+2(t3+c)) =
w + t3 =
6.250 kN
1.150 m
C/L
8.38
0.58
8.38
0
2
12.885 kN/M
0.650
Design BM, M =
0.00 x
0.65 +
8.38 x
=
Design BM = max (
4.691 ,
2.094 ) =
0.58 12.885 x
2.094 kN-m/M
2
0.650 /2
4.691 kN-m/M
66.6 mm
75 mm > Required, O.k.
2
323 mm / M width
8
8121/E/DN
-17(R0)
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
FP Level
t1
t2
h1
Road Level
t2
h
100
175
175
0
mm
mm
mm
mm
w
t3
p2
Density of backfill
t3 c
p1
t4
p3 p4
40 mm
0.279
3
25 kN/m
3
20 kN/m
2
wL =
Pedestrian LL over cover slab
5 kN/m
Live load surcharge for carriageway side wall, hs =
1200 mm
Coefficient of friction between cover slab & wall top, m =
0.5 m
M25
8.33 Mpa
Modular ratio,
Permissible tensile stress in HYSD bars reinforcement, sst
Neutral axis depth factor, k = 1 / (1+sst/mscbc)
In drain walls & base slab
Lever arm factor,
j = 1 - k/3
In drain walls & base slab
= 10.00
=
205 Mpa stress in steel
limited to 205 Mpa
=
0.29
0.9
= 1.088
kars x t1 =
p2 =
kars x h =
2.250 kN
1.406 kNm / M
2
0.837 kN / m
2
6.975 kN / m
2.943 kNm / M
28-Feb-2015
Note No:
By :
PTM
Sheet No:
2
6.696 kN / m
2
6.417 kN / m
kars x hs =
kars x h' =
p2 =
where h' = h + t1 - h1
=
1150 mm
2
BM due to earth pressure, Ms = p1 x h' /2 + 0.42 x p2 x h'2/2 =
6.210 kNm / M
7.616 kN-m/M
9
8121/E/DN
-17(R0)
Date:
= (w + 2t2 x t1 x rc)
=
83.7 mm
87.5 mm > Required, O.k.
2
470 mm / M width
4.500 kN
6.000 kN
(w + 2t2) x wL
=
Weight of side walls = 2*(t2 + t3)/2*h*rc
Weight of soil fill on base slab heel =2* c * (h+t1)*rs =
Total Load
=
0.000 kN
19.094 kN
Base pressure, pb =
2
14.144 kN/M
19.094 / (w+2(t3+c)) =
w + t3 =
8.594 kN
1.175 m
C/L
9.55
0.59
9.55
0
2
14.144 kN/M
0.675
Design BM, M =
0.00 x
0.68 +
9.55 x
=
Design BM = max (
7.616 ,
2.387 ) =
0.59 14.144 x
2.387 kN-m/M
2
0.675 /2
7.616 kN-m/M
83.7 mm
87.5 mm > Required, O.k.
2
470 mm / M width
10
8121/E/DN
-17(R0)
Date:
28-Feb-2015
Note No:
By :
PTM
Sheet No:
FP Level
t1
t2
h1
Road Level
t2
h
150
175
175
0
mm
mm
mm
mm
w
t3
p2
Density of backfill
t3 c
p1
t4
p3 p4
40 mm
0.279
3
25 kN/m
3
20 kN/m
2
wL =
Pedestrian LL over cover slab
5 kN/m
Live load surcharge for carriageway side wall, hs =
1200 mm
Diameter of main reinforcement
=
10 mm
Coefficient of friction between cover slab & wall top, m =
0.5 m
M25
8.33 Mpa
Modular ratio,
Permissible tensile stress in HYSD bars reinforcement, sst
Neutral axis depth factor, k = 1 / (1+sst/mscbc)
In drain walls & base slab
Lever arm factor,
j = 1 - k/3
In drain walls & base slab
= 10.00
=
215 Mpa stress in steel
limited to 215Mpa
=
0.28
0.91
-
= 1.055
kars x t1 =
p2 =
kars x h =
2.438 kN
2.133 kNm / M
2
0.837 kN / m
2
9.765 kN / m
7.562 kNm / M
28-Feb-2015
Note No:
By :
PTM
Sheet No:
2
6.696 kN / m
2
9.207 kN / m
kars x hs =
kars x h' =
p2 =
where h' = h + t1 - h1
=
1650 mm
2
BM due to earth pressure, Ms = p1 x h' /2 + 0.42 x p2 x h'2/2 =
drqd = Sqrt(M/QB) =
175 40 d =
14.379 kNm / M
16.512 kN-m/M
11
8121/E/DN
-17(R0)
Date:
Ast = M/sstjd
= (w + 2t2 x t1 x rc)
=
(w + 2t2) x wL
125 mm
130 mm
5 =
2
652 mm / M width
4.875 kN
6.500 kN
=
Weight of side walls = 2*(t2 + t3)/2*h*rc
Weight of soil fill on base slab heel =2* c * (h+t1)*rs =
Total Load
=
w + t3 =
Design BM, M =
Design BM = max (
Effective depth required,
Effective depth provided,
14.219 kN
0.000 kN
25.594 kN
2
18.958 kN/M
25.594 / (w+2(t3+c)) =
Base pressure, pb =
0.00 x
16.512 ,
1.175 m
C/L
12.80
12.80
0.00
0.59
0.09
2
18.958 kN/M
0.675
Ast = M/sstjd
2
0.675 /2
16.512 kN-m/M
drqd = Sqrt(M/QB) =
d =
175 40 -
5 =
125 mm
130 mm
2
652 mm / M width