The work assignment document outlines tasks for plant staff from July to August 2013, including setting up a scalping screen and oversize conveyor, finishing construction of a concrete wall for a new hopper, repairing an old hopper wall, servicing plant equipment, checking and possibly repairing a Toyota car's engine and transmission, servicing trucks and shovels, checking hydraulic pumps of a Komatsu loader, and other works deemed necessary by the plant manager.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
28 views
Work Assignment For Plant Staff
The work assignment document outlines tasks for plant staff from July to August 2013, including setting up a scalping screen and oversize conveyor, finishing construction of a concrete wall for a new hopper, repairing an old hopper wall, servicing plant equipment, checking and possibly repairing a Toyota car's engine and transmission, servicing trucks and shovels, checking hydraulic pumps of a Komatsu loader, and other works deemed necessary by the plant manager.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
WORK ASSIGNMENT FOR PLANT STAFF
(From July to August, 2013)
1. SET-UP SCALPING SCREEN & OVERSIZE CONVEYOR TO O/S
HOPPER --- Mario, Glenn 2. FINISH THE CONSTRUCTION OF CONCRETE WALL FOR NEW HOPPER Mario, Glenn 3. REPAIR OF OLD HOPPER WALL 4. SERVICE PLANT EQUIPMENTS
- Mario, Glenn - Mario
4. CHECK AND POSSIBLY REPAIR ENGINE/TRANSMISSION OF
TOYOTA CAR - Glenn 5. SERVICE TRUCKS AND SHOVELS - Glenn 6. CHECK HYDRAULIC PUMPS, ETC. OF KOMATSU LOADER # 1 Glenn, Mario 7. OTHER WORKS DEEMED NECESSARY BY PLANT MANAGER