5810 Manual
5810 Manual
1.1 Survey
Thank you for choosing the product of Huaxia Group. Please read the Manual
carefully to know the tower crane well, rapidly install and correctly use it. Please follow
the methods and requirements of the Manual to handle the tower crane.
5810 tower crane is a new type tower crane jointly designed by our company and
Changsha Building Machine Academe according to the latest version of JG/T5037-93
Tower Crane Classification.
The crane is a multipurpose tower crane with horizontal jib, trolley radius-changing
function, top swing function and automatic rising function. The crane has the following
features:
1. Its functional parameters and technical indexes are leading in China and up to
international advanced level. Its maximum working radius is 58m.
2. The crane has the beautiful outline and is very popular to customers.
3. The crane has two working models: the anchoring model and the climbing
model. The hoisting height of the anchoring crane is 40m and that of the climbing one is
up to 140m through adding standard sections and supporting devices.
4. It has high working speed, good speed adjustment function and stable working
state. Its swing mechanism adopts planet reducer and its top-rising mechanism has
compact structure and high efficiency. They are easy to maintenance and safe to
operate.
5. It has reliable safety devices, which are mechanical and electrical devices and
are adaptable to bad outdoor environment.
6It has double-bar hanging jib with good rigidity and small weight. It has beautiful
figure and small wind resistance.
7The cab is installed separately with big space and visual field.
8It has no center collector ring so as to prevent from rain, short circuit and other
failure. It is easy for operate to go through.
For the above features, it is suitable for high civil buildings, bridges, workshops and
high wall buildings such as chimneys.
1.2.2 For the change of crane parts or renewal of relevant standards and criteria,
the crane may has small changes. We shall make complementary notice for the major
changes and shall not make that for minor changes. Please check the Manual with
parts nameplates and overall structure outline.
Hoisting Mechanism
M5
Swing Mechanism
M4
Traction mechanism
M4
HeightM
Max loadingt
Radiusm
Hoisting
mechanism
Ratio
Speedm/m
in
Hoisting
weightt
PowerkW
Swing Mechanism
Traction Mechanism
Top Rising Mechanism
Banlance Weight
Ratio
Anchor height
=2
Free standing
height
40
=4
40
80
58m jib
52m jib
46m jib
6
Max. Radius
Min. Radius
=2
8.5
40
140
58
2.5
80
4.25
=4
20
40
1.5
5.4
24
24
5.4
24
24
Speedr/min
0-0.6
MomentN.m
95
Speed(m/min)
20
40
Power(kW)
2.2
3.3
Speed(m/min)
0.55-0.7
Working Pressure(MPa)
25
Power(kW)
7.5
Length of Jib(m)
Banlance Weight(t)
58
14.2
Total Power(KW)
52
12.5
46
10.8
34.8(Excluding Top rising Mechanism Power)
WorkingTemperature()
-5-40
3
Hoisting Mechanism
Hoisting
Mechanism
Item
Rated Rope Tension
Wire rope
Model
drum
Rope capacity
motor
Model
Power
Rev
Unit
t
m
kW
r/min
Parameters
1.5
4V*39S+5FC-13-1770
340(4 layers)
YZTD225M3-4/8/32
24/24/5.4
1440/700/140
Radius mechainism
Radius mechanism
Item
Wire
rope
Unit
Model
length
46m
jib
52m
jib
58m
jib
Radius speed
motor model
Power
Rev.
Max radius Loading
parameters
7.7-NAT-6*19FC1570-ZS-GB8918
Wire
94
Wire
60
rope
rope
108
66
I
II
M
M
M
117
m.min
kW
r/min
T
40/20
YEZS132S-4/8
3.3/2.2
1440/720
6
72
Swing Mechanism
Swing mechanism
Item
Motor
Unit
Model
Power
Rev.
Model
Reduction Ratio
Output Torque
Output Speed
Reducer
Output Gear
Parameters
Kw
r/min
N.m
r/min
Pattenm
Parameters
YZR132m-4
22.2
908
XX4-100
157.5
10000
5.765
10
No. of Gear z
Modification coefficient x
Main Motor Ratio
Main Motor Rev
15
+0.5
1596.56
0~0. 6
58755
7010
14838
40038
To Ground 39000
To Boom Root
Qt
Rm
Qt
Rm
Qt
2.5
16.2
6.00
17
18
19
20
21
22
23
24
25
26
27
5.70
5.35
5.04
4.75
4.50
4.27
4.06
3.87
3.69
3.53
3.38
28
29
30
31
32
33
34
35
36
37
38
39
3.24
3.12
3.00
2.88
2.78
2.68
2.59
2.50
2.42
2.34
2.27
2.20
40
41
42
43
44
45
46
2.13
2.07
2.01
1.96
1.90
1.85
1.80
Qt
Rm
Qt
Rm
Qt
Rm
Qt
2.5
15.1
6.00
16
17
18
19
20
21
22
23
24
25
26
5.62
5.25
4.92
4.63
4.37
4.14
3.92
3.73
3.55
3.39
3.34
27
28
29
30
31
32
33
34
35
36
37
38
3.10
2.97
2.85
2.74
2.64
2.54
2.45
2.37
2.29
2.21
2.14
2.07
39
40
41
42
43
44
45
46
47
48
49
50
2.01
1.95
1.89
1.83
1.78
1.73
1.68
1.64
1.59
1.55
1.51
1.47
51
52
1.43
1.40
Rm
Qt
Rm
Qt
Rm
Qt
Rm
Qt
2.5
13.2
6.00
14
15
16
17
18
19
20
21
22
23
24
5.61
5.18
4.82
4.50
4.22
3.96
3.74
3.53
3.35
3.18
3.03
25
26
27
28
29
30
31
32
33
34
35
36
2.89
2.76
2.64
2.53
2.42
2.33
2.24
2.15
2.08
2.00
1.93
1.87
37
38
39
40
41
42
43
44
45
46
47
48
1.80
1.74
1.69
1.64
1.59
1.54
1.49
1.45
1.41
1.37
1.33
1.29
49
50
51
52
53
54
55
56
57
58
1.26
1.23
1.19
1.16
1.13
1.10
1.08
1.05
1.02
1.00
Checkup Name
Checkup Contents
Bottom frame
Mast
Mast frame
Upper and
lower swivel
tables
Cab
Top
Jib
Balance Beam
Hoisting
devices
Mechanism
Safety devices
Lubrication
2.2.2 Make the following tests in turn after assembling the tower crane:
(1) Operation test without load: make several operations of all mechanisms
separately and then make three times of integrative operations. If there is any
10
2.3.1 Before installing the crane, be sure that the space is big enough
for crane to circle with wind in 360freely when it is out of work.
2.3.2 The groundwork of the crane must be solid. Digging that may
cause groundwork to sink or collapse is not allowed. Pay much
attention to flood or tide, which erodes the groundwork of the crane.
2.3.3 Safety
randomly.
prohibited.
such as bigger
Otherwise, we
accidents arising herein.
2.3.4 Check safety devices and limiter switches regularly to ensure of accurate and
reliable working.
11
2.3.6 Dont use swing mechanism or jib trolley to move or pull heavy objects on ground. Dont
hoist the heavy object out of working radius of the crane.
2.3.7 Dont hoist the object adhering to or embedded in ground. Dont hoist the
heavy object joining with other object. In winter, be cautious of the objects icing to
land
2.3.8 Work hard not to hoist the heavy objects out of visual
field. If the crane operator cannot see heavy object well,
there should be a person to help him.
2.3.9 Notice wind speed. If the wind speed is near the max.
working wind speed 20m/s, please stop working.
2.3.11 When work stops, drive trolley to the jib root and raise the hook close to the trolley for
the jib frame circling with wind.
12
2.3.12 When work stops, cut off power supply (including power in cab and power supply).
2.3.13 Maintain the crane well and check wearing parts such as brakes and wire ropes carefully.
2.3.14 When repairing, installing or disassembling the crane, all
operators shall follow relevant safety regulations to dress safety
belt and helmet.
humid land. If the land is not electric well, pour some brine in the land. Check the earth
resistance once in spring and once in autumn.
2.5.4 When working at night, the mast, jib and tower top shall have lightings and the field also
needs lightings.
2.5.5 After installing the crane, the user shall fix the main cable on mast by insulation fixers at
every 3m point.
2.5.6 The electrician shall fix the cable through upper and lower swivel tables well. Check the
cable before every starting of the crane to avoid loose.
2.5.7 Cut off power before leaving cab and lock the door of the cab. After getting down the
crane, cut off the power supply. The operator shall make maintenance record and shift record. He
shall tell the next operator about all problems face-to-face.
15
1500
1500
17
5000
1465
500
500
226
226
1465
5000
A-A
10
226
1 2 3
140
15 0 0
1 25 0
10
Tube Steel
Concrete
Backing Plate
Carrier Ring
2
1
Item
Nut
Ground Bolt
Name
36/Q235/L=500
20/Q235
JG/T5037.31
16
JG/T5037.21
32
Materials
18
8
1
32
Qty
6818
5980. 0
2042.0
1200
20
12608
21
turn to 2x speed. Please follow Figure 3-8 to fix wire rope. The number and model of
rope clips shall in conformity with Chart 3-1.
Trolley Pulley
Hoisting Mechanism
Hook Pulley
Radius Mechanism
Pulley
Trolley
Arrangement of Radius Wire Rope
24
Load Name
Vertical LoadkN
Horizontal LoadkN
25
780
26
M
MK
1500
200
Figure 4-2
4.2.10 Check oil of reducers and fill enough oil in them.
4.2.11 Dont stop assembling or disassembling only after finishing jib or balance beam.
4.2.12 The erectors must wear safety helmet and safety belt. Non-erectors are prohibited to enter
the filed.
26
eight strong bolts to connect standard section with lower swivel table.
Note: (1) You can put hydraulic top-rising pump near top-rising cylinder.
(2) Fix eight idler wheels of mast frame in advance.
(3) The big window of mast frame is adverse to the support side of standard section.
4.3.4 Installation of Tower Top
Connect top with transition section in advance on ground, and then assemble top platform,
ladder and idler pulley block on it. In order to easily install balance beam and jib, install a pull
bar for balance beam separately on the right side and on the left side of top and a pull bar on jib
nose and on jib root. Hoist tower crane to upper swivel table and use four pin axles to connect
the top with upper table. When hoisting, the vertical side of top shall be towards to the jib.
4.3.5 Assembly of Balance Beam
Connect balance beam on ground and then assemble top-rising mechanism, electric control
box, and resistance box and pull bars on it. Hoist balance beam and use pin axles to connect the
beam with tower top. Raise the beam until connecting the pull bars by pin axles. Then lower the
beam for the bars to hold it. Check joints and assembly points. At last, hoist two ballasts to the
rear of the balance beam.
Note: Dont arrange wire rope through installation knot.
4.3.6 Installation of Cab
After all electrical devices are installed in the cab, hoist the cab to the supporting bars on
upper swivel table and fix it by bolts.
4.3.7 Assembly of Jib
Assemble jib on a flat crosstie near the tower crane and lean it to a 0.6m high bracket. Fix a
hanging basket to the trolley and follow 3.3.2 and Figure 3-19 to attach the trolley to the jib root
and tighten trolley wire rope. Follow Figure 4-5 to assemble other pull bars and connect them
with hang points on jib. Use wires to fix the bars tightly.
27
28
29
Fix rope as Figure 4-3 and try to hoist a little. Hoist jib to installation height and
connect its root with the holes on tower crane by pin axles. Raise the jib slowly until its
pull bars connect by split pins. Lower the jib to tighten these pull bars. Check these
joints and assembling points. Hoist remaining ballast to the balance beam.
Then follow Figure 3-8to arrange wire ropes. Wire rope goes out from roller of
hoisting mechanism and go through the pulley on hoisting height limiter and idler pulley
on bracket, and go through trolley and hook pulley block and finally fix on jib nose.
After completing assembly, check the verticality of mast. The tolerance shall be
less than 4/1000. Connect all power supply according to electrical diagram and try to
start very mechanism to check them. Meanwhile, check if there is rope friction.
3Before top rising, make good preparation. After top rising, screw bolts tightly
and screw handle to middle and cut off hydraulic system power.
4 Top rising and Top lowing should be done at daylight. If they are done at
night, there must be enough lighting.
5Before disassembly of the crane, check and maintain the crane.
6If the upper section breaks away from lower section, you must do as follows.
Or, there may be serious accident.
A Use swing brake to brake jib and prevent it from swing and ensure it in the
same direction with standard section.
BDont start radius-changing mechanism and ensure that trolley doesnt move.
CDont start hoisting mechanism and dont hoisting load.
DAfter fixing one standard section and before hoisting the next standard section,
main bar of mast and lower swivel table must be connected by a strong bolt.
E All bracket of the standard must be straight against the former standard
section.
FWhen three standard sections are out of mast frame on the bottom, there must
four gradient supports under it.
7 Before top rising, adjust the space between idler wheels and main bars of
standard section to 2-3mm. After taking down the bolts between the lower swivel table
and standard section, check the balance of crane. If there is some trouble, connect
bolts again and move trolley.
4.4.2 Preparation for Top Rising
1 Clean every standard section, put the standard sections in a line under the
jib so as to save time.
2 Lease electrical cable longer than top rising height and fix electrical cable
well. (The user should take measure to avoid cable friction).
3Swing jib to the front of mast frame and balance to the behind of mast frame.
4.4.3 Top Rising Operation
(1) Hoist a standard section and put it in trolley.
(2) Drive the trolley to jib root and gravity center of crane top is on top cylinder.
Note: when the trolley balances, the hook should be the highest point. Adjust trolley
position according to conditions as follows: loose all nut on lower swivel table and
standard section but not take them down. Use oil cylinder to raise crane top and
set the space between lower swivel table and standard section at 20mm to see if
them meet straight. Take down the bolts.
(3) Use top rising beam to prop up the standard section, start hydraulic system to
stretch piston rod to drive support pin to standard section. (Before changing the
standard section back-up block, draw out the support pi and put it on the same level with
31
the inner face of the support cover to avoid the collusion between the support pin and the
standard section support back-up block during top rising). Shrink piston rod to let
support beam to prop up standard section and then stretch piston road. Use trolley
to drive standard section above mast straight. Shrink piston rod to let two standard
sections connect each other. Use strong bolts to fix them. Shrink piston rod more
and take down trolley. If want to add more sections, repeat the above process.
(4) After top rising, swing jib frame to different angle to check all joints, bottom frame,
standard sections and anchoring bolts.
5.1 Multifunctional limiter (for hoisting, radius and swing. Please see
Figure 5-2)
5.1.1 Debugging process
(1) Open their cover, loose the screw of memory cam.
32
(2) Drive the mechanism to appointed state (without load) and the inching switch cuts
off. Adjust memory cam and use the tip of cam to press inching switch.
(3) Tighten screws of cam. (the screws must be tight, or the memory may be in
disorder.)
(4) Run the mechanism for several times to check the memory. (if there is error, debug
them again.)
(5) Tighten screws and put on cover.
Check the memory cam regular.
5.1.2 Debugging of height limiter
(1) Debug it according to 5.1.1.
(2) Press inching switch by finger to see if it works well.
(3) At max. hoisting height, the space between trolley and hook shall be at least 1m.
Debug cam and make cam tip to press down inching switch. Tighten screws.
5.1.3 Debugging of swing limiter
(1) When jib is installed, debug swing limiter.
(2) Press inching switch by finger to see if it works well.
(3) Turn left for 540according to 5.1.1. Use cam tip to press down inching switch, and
then tighten screws.
(4) Turn right for 540according to 5.1.1. Use cam tip to press down inching switch, and
then tighten screws.
(5) Check the left swing and right swing.
5.1.4 Debugging of radius limiter (same as 5.1.1)
(1) Increasing radius and jib nose limit: drive trolley to 0.8m point to jib nose and use
cam tip to press down inching switch, and then tighten screws.
(2) Entad radius and jib root limit: the same with (1), drive the trolley to 0.65m point to
jib root.
(3) Check it.
33
34
35
36
37
39
40
(5) The winding direction of wire rope is related with the arrangement direction on roll.
Keep wire rope tight on roll to avoid distortion. Please see Figure 7-3 for right
winding methods. Keep rope in order.
(6) Please see Chart 1 for model, specification and length of wire rope.
41
Chart 7-1
Location
Specification
Hoisting
mechanism
Radius
Long
mechanis Short
m
4v x 39s+5FC-13-1770
7.7-NAT-6x19FC1570-ZSGB8918
Diameter
(mm)
13
Quantity
1
Length
(m)
340
7.7
1
1
117
72
42
43
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Swing
mechanis
m
Swing limiter
Lubricant Name
Winter: N46 machine oil
Summer: N68 machine
oil
Machine oil
Lubricating Period
Change oil for 1500
working hours, check
oil everyday
Drop oil for 50
working hours
Lubricating grease
Lubricating grease
44
Reducer
Radius
mechanis
m
Top-rising
mechanis
m
Swing
abutment
Idler
axletree
Idler pulley
Open gear
Hook axletree
Trolley axletree
Other axletrees
Lubricating grease
N46N68 hydraulic oil
Lubricating grease
Lubricating grease
Lubricating grease
50 working hours
50 working hours
Add oil at medium
repair; add oil for
other axletrees for
every 160 working
hours and clean them
once for half a year.
Change oil for 1500
working hours
2 times a month
2 times a month
Once a month
Lubricating grease
Lead grease
Lubricating grease
Lubricating grease or
machine oil
Lubricating grease or
machine oil
Lubricating grease or
machine oil
45
Once a month
Lubricate them after
disassembly of crane
and lubricate
regularly in
warehouse
46
47
concrete
1
6
12-1200 reinforce bar
121
5
fixed leg
4
4
25-3060 reinforce bar
8
3
upper main bar
62
2
62
1
lower main bar
item specification name
material QTY
QTZ80(5810).10
Fixed anchorage Groundwork
947
4 8
190
3 8
2972
170
1150
R5
25
60
R1
350
00
800
230
43
80
171
1119
171
171
171
194
(44.5)
800
180x14=2520
180
116
2752
48
(116)
44.5
171
171
80
Complementary Notes
Our company reserves the right to change technical parameters, outer sizes and
design without information in advance. If the product has difference with the Manual.
The product shall prevail. If you want to buy parts or make technical treatment, please
contact our technical department.
The new edition shall prevail.
50