I wish to express my cordial gratitude to the all peoples who have played a
crucial role in the research for this project, without their active
cooperation the preparation of this project could not have been
completed within the specified limit.
The next person I would like to acknowledge is my project guide Mr. Arif
Mehmood who supported me throughout this project with utmost
cooperation and patience.
Executive Summary
Table of Content
Table of Contents
Acknowledgments
..1
Executive
Summary
2
Table of
Content
..3
Project Charter
....5
Objectives
Deliverables/ Millstones
Stakeholders
Assumptions
Risks
Decision Making Process
Project Cost
Project
Plan
.8
General Information
Project Information
3
Technology
Environmental and Social Impact
Benefits of Solar Street Lights
Milestones
Costing & Budgeting
Scope
Statement
...13
Stakeholders
Register
..15
Human Resource Management
Plan..16
Communication Management
Plan.21
Procurement Management
Plan..2
2
Quality Management
Plan
....26
Risk Management
Plan
.28
Conclusion
....29
PROJECT CHARTER
Tagline: - You pay LESS MONEY for MORE LIGHT with Solar Street
Lights.
Mission:MTA Corporation aim Towards provide alternative solar energy solutions for
domestic, industrial and commercial establishments in order to mitigate
the energy problems in Pakistan.
Objectives:Solar energy is a very useful renewable source of energy, which may be the
answer to the future for power, or energy needs, as global warming
seems to pick up rapidly. So, we can all contribute to the environment by
using solar energy thus erasing or trimming down various gas emissions,
which can endanger earth, in turn, the millions of people in it. By
installing solar street lights in the Capital city of Pakistan, it will help to
reduce the energy crisis. The installation cost of Solar Street light is less
than the Traditional Street lights installing and maintenance cost. So, by
installing Solar Street lights, it will help to boost the economy of Pakistan.
Deliverables/ Milestones:Less Cost, No electric current is required, high quality solar street lights, easy
to maintain, Heavy Duty 1/8 Aluminum with welded seams and rubber
mats, Heavy duty front door with stainless steel hinges, gaskets and
lockable, No sharp edges on enclosure door, 24 volt 10 amp controller,
Field adjustable for on/off times, Settable for gel cell battery charge curve
to ensure performance and autonomy, Pulse Width Modulation charge
regulation, Factory mounted in battery box, Controller automatically
adjusts for seasonal light changes, Extends battery life, reduces deep
discharge cycling and enhances autonomy.
Stakeholders:Stakeholders of the project are Ministry of Finance, World Bank, UNO, and
UNICEF, Project team of MTA Company, CDA, and Government of
Pakistan.
5
Risks:Solar electricity and heat are not available at night and also may not be
accessible in case of bad weather conditions. So, a solar or
complementary power station is required which maybe a problem for
many locations.
Solar panels require a large area for installation in order to achieve a good
level of efficiency. Besides the solar energy can also be influenced by the
presence of water vapor, pollution etc. in the air, which may cause
complexities.
Considerable amount of energy is lost when DC (direct current) has to be
converted to AC (alternating current). The solar cells can only produce
DC, thus the conversion by help of Grid-Tie Inverters incurs a loss of
about 4-12%.
Decision Making Process:Decision will be taken with the agreement of the stakeholders and will be
approved by the CEO of the company.
Project Cost:Cost of the project is determined through the documents construct in the
project.
Activities:
Procurement of Required Material
Project Initiation
Define Scope
Project Schedule
Estimated Cost & Budgeting Plan
Document Project Support Plans
Project Quality
Project Human Resource Management
Develop Procurement Plans
Set Up Project Environment
7
Project Plan
GENERAL INFORMATION
Project sponsors and partners are;
Government of Pakistan
World Bank
UN
UNICEF
Suppliers
PROJECT INFORMATION
Lamp
The lamp will be of compact fluorescent (CFL) type, either 4 - Pin or 2 Pin
type, with a rating of 11W. For the 4 - Pin type CFL. Adequate pre-heating
circuit must be provided. The light output from the lamp should be
around 900 +5% lumens. The lamp should be housed in a weather proof
assembly suitable for outdoor use, with a reflector on its back. While
fixing the assembly, the lamp should be held in a base up configuration.
Battery
Electrolyte type positive tubular plate is required. Low maintenance leads
acid battery. The battery will have a minimum rating of 12V 75 Ah (at
C/10) discharge rate. 75 % of the rated capacity of the battery should be
between fully charged & load cut off conditions.
Celectron
The inverter should be of quasi sine wave/sine wave type. With frequency in
the range 20 - 35 KHz. Half-wave operation is not acceptable. The total
electronic efficiency should be at least 80 %. No blackening or reduction
in the lumen output by more than 10% should be observed after 1000
ON/OFF cycles (two minutes ON followed by four minutes OFF is one
cycle). The idle current consumption should not be more than 10 mA.
Electronics should operate at 12 V and should have temperature
compensation for proper charging of the battery throughout the year.
Necessary lengths of wires/cables and fuses should be provided. The PV
module will be used to sense the ambient light level for switching ON and
OFF the lamp.
PV Module (s)
10
The PV module(s) shall contain crystalline silicon solar cells. The power
output of the module(s) under STC should be a minimum of 74 W either
two modules; of minimum 37 W output each or one module of 74 W
output should be used. The operating voltage corresponding to the power
output mentioned above should be 16.4 V. The open circuit voltage of the
PV modules under STC should be at least 21.0 Volts. The terminal box on
the module should have a provision for opening for replacing the cable if
required. A strip containing the following details should be laminated
inside the module so as to be clearly visible from the front side. Electronic
Protections and Adequate protection is to be incorporated under no -load
conditions e.g. when the lamp is removed and the system is switched ON.
The system should have protection against battery overcharge and deep
discharge conditions. Fuses should be provided to protect against short
circuit conditions. The pole should be made of mild steel pipe with a
height of 4 meters above the ground level, after grouting and final
installation. The pole should have the provision to hold the water proof
lamp housing it should be painted with a corrosion resistant paint. A
vented, acid proof and corrosion resistant painted metallic box for
outdoor use should be provided for housing the battery.
Components and parts used in the solar street lighting systems should
conform to the latest BIS specifications, wherever such specifications are
available and applicable.
11
No trenching, no wiring
No maintenance
12
Well trained employees are in MTA Corporation with a lot of experience and
outstanding work. Trainings are an important part of the organization to
keep employees up-to-date with the latest technology. HR Manager is
responsible for the hiring, training and compensation of the employees.
Project implementation:Schedule for project implementation is given in detail in the MS Project file.
Partners' responsibilities in implementation are MTA Corporation,
Suppliers i.e. (Shi fang Company, Malik steel, A.A Company, Askari
Cement, and Hino-Pak).
Shi Fang Company:Lamps, Batteries, PV Module(s), controlling device
Mechanical equipment
Electronic accessories
Malik Steel:Stainless steel poles, water prove box
AA Company:Procure Bricks for installing the pole holder.
Askari Cement:Procure Cement to make holder of the street light pole.
Hino-Pak Company:Procure trucks to transport street lights to the designated places.
Milestones:-
13
Sr.N Task
o
1
Purchase of Materials
Purchase of Vehicles
Final Report
14
Scope Statement
Project Objective:-
15
Solar energy is a very useful renewable source of energy, which may be the
answer to the future for power, or energy needs, as global warming
seems to pick up rapidly. So, we can all contribute to the environment by
using solar energy thus erasing or trimming down various gas emissions,
which can endanger earth, in turn, the millions of people in it. By
installing solar street lights in the Capital city Islamabad of Pakistan, it
will help to reduce the energy problem in some way. The installation cost
of Solar Street light is less than the Traditional Street light. So, by
installing Solar Street lights, it will definitely play a pivotal role to stabilize
the economy of Pakistan.
Assumptions/Limitations:One time cost but beneficial, less emission of energy that effect ozone layer
or help to reduce global warming, better working then the traditional or
previous ones. Cost is one factor, Accessibility, Literacy rate, technology,
experts.
Comments: This project is going to help in the growth of Pakistans economy because
right now Pakistan is going through a lot of major issues and electricity is
one of them, so by planting solar street lights it will reduce the
consumption of electricity on traditional street lights and the supply of
electricity will be more likely be equal to the demand of the people.
16
Stakeholders Register
17
Sr.No
Name of
Stak
e
hold
ers
Designation
Department
Role in
proj
ect
Type of
communica
tion
Expectatio
n
Interest
Project
Manager
Overall
To assure
all
the
activ
ities
are
bein
g
done
as
sche
dule
d
Successfully
installin
g
the
solar
street
lights in
Islamab
ad
High
Governm
ent
of
Pakis
tan
Financing
body
Nil
To
Reports
and
meetings on
monthly
basis
Fully support
to make
project
successf
ul
High
World
Bank
Financing
body
Nil
--as above--
--as above--
High
Labor
Work Force
Operations
Meetings
and
Face to Face
Salary
on
time
Low
Tanv
eer
Ahm
ed
finan
ce
the
proje
ct
--as
abov
e--
To
prod
uce
solar
stree
t
light
s
and
plant
in
the
Isla
mab
18
ad
5
Suppliers
Nil
Nil
To
provi
de
the
best
avail
able
mate
rial
to
build
the
solar
stree
t
light
s
Written
and
meetings
Contracts
19
High
CEO
CEO
MARKETIN
G
MANAGER
HUMAN
RESOURCE
MANGER
FINANCE
MANAGER
PROCUREM
ENT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
TEAM
TEAM
TEAM
TEAM
TECHNICA
L
EMPLOYEE
S
MARTKETIN
G
RESEARCH
ER
ANALYTIC
AL
SKILLED
EMPLYEES
TECHNICA
L
EMPLOYEE
S
TRAINERS
QUALITY
MANAGER
PROJECT
MANAGER
ASSISTANT
MANAGER
TEAM
ACCOUNTA
NTS
AUDITORS
20
Designation
CEO
Marketing
Manager
21
Human
Resource
Manager
Finance
Manager
23
Procurement
Manager
Quality
Manager
Project
Manager
Assistant
Manager
26
27
Message
Owner
Recipient
Delivery
Vehicle
Notificati
on
Mediu
m
Frequen
cy
Cycle
Project Statu
s
Project Manager
Project
Sponsor
and Key
Stakeho
lders
Project
Status
Report
Word
Docum
ent
sent via
e-mail
Monthly
Meeting
Discussio
n,
Decisions
, Action
Items
Meeting Facilitator
Meeting
Particip
ants
Meeting
Notes
Word
Docum
ent
sent via
e-mail
As often as
meetin
gs are
held
Informational
updates
on
issues,
schedule
s, task
assignme
nts that
must be
communi
cated
before
the next
status
meeting
Project Manager
Project
Sponsor
and Key
Stakeho
lders as
needed
Message
E-Mail with
attach
ments
as
needed
On an as
neede
d basis
when
inform
ation
becom
es
availab
le
Status
updates
on Tasks
Task
Updat
es
EPM Task
Reporti
ng
When a
team
memb
er has
a task
due
during
the
current
28
Project
Manage
r
week
Executive
Presentat
ion
Project Manager
with Project
Sponsor
Executive
Sponsor
and Key
Stakeho
lders
Slide
Presen
tation
or
Report
PowerPoint
or Word
docum
ent
As often as
neede
d for
Stakeh
older
involve
ment
and
commi
tment
Project
Steering
Committ
ee
Project Manager,
Project Sponsor
Project
Steerin
g
Commit
tee
Steering
Comm
ittee
Meetin
g
In person
with
PowerP
oint,
Word
docum
ent,
or Proje
ct
deliver
ables
Every 3 4
weeks
per
meetin
g
schedu
le
Meetings
29
Procurement Definition:For making the premium product i.e. Solar Street Lights, MTA Corporation
requires the following parts according to their specifications;
Procurement of Material
Bricks
Cement
Lamp
Battery
Controlling device
Celectron
PV Module(s)
Mechanical Hardware
Electronic Accessories
Vehicles (Trucks)
Specifications:Highly efficient mono crystal or multi crystal silicon solar panels for power
supply.
Working Voltage: 12 / 24V DC
Lighting Time: 8 to 12 hours per day depending on the season
Advanced charging, discharging and lighting control circuit with reliable
Performance
High lighting efficiency, great brightness
Easy installation
Safe, reliable, energy saving, economical, environmental protection
Lamp specifications:Lamp technology: LVD (Induction light)
Power Rating: 40W
Life span: > 100,000 hours
Mean lumen: 6,800
Mean pupil lumen: 11,000
CRI > 80
Color temperature: 2700, 2500 or 4100K (based on clients decision for type
of color)
Different lamp fixture designs can be proposed. The fixture must include the
following components:
- Reflector
- Closed housing
- Electronic Ballast
- Mounting brackets
Details of the proposed fixtures should be submitted with both clear designs,
cut sheets and photometric performances.
PV module spec:Type: Multi or Mono crystalline technology
Conversion Efficiency: > to 15%
Manufacturing tolerance on rated power: 3%
Module Voltage: 12V
Environment: See general description for environment requirements
Connector type: Multi Contact type possibility
Total weight: 20 KG
Cell protection: The cells should be protected by a tempered glace
Batteries spec:The following are the minimum requirements for the battery(s):
Maintenance free
Gel type batteries
No leakage
12V type Deep discharge capacity
Expected life span over 8 years in normal operating condition
32
Charger controller specification:The charger controller should be located close to the battery(s) and it should
need minimum maintenance. This unit can include the automatic
dusk/down switch and the dimmer/timer module. The controller should
have the following protections:
Overcharging
Over discharging
Overload
Selection Process & Criteria:RFP will be floated then identify the suppliers, evaluating the suppliers,
selection of supplier, alternative supplier, review. The criteria will be the
terms and conditions of contract. According to the specifications and
required quality of the products that are to be procured.
Sr.N
o
Designation
Procurement Role
Project Manager
Procurement
manager
Procurement
managers
team
33
Vendor Management:Procurement manager and his team will manage the relationship with
supplier and ensure that they provide the right parts on the time as per
requirement.
Project Scope:MTA Corporation aim Towards provide alternative solar energy solutions for
domestic, industrial and commercial establishments in order to mitigate
the energy problems in Pakistan.
Deliverable Description:The main deliverable of project is Solar Street Light. The other somewhat
related to product deliverables are; Less Cost, No electric current is
required, high quality solar street lights, easy to maintain, Heavy Duty
1/8 Aluminum with welded seams and rubber mats, Heavy duty front
door with stainless steel hinges, gaskets and lockable, No sharp edges on
enclosure door, 24 volt 10 amp controller, Field adjustable for on/off
times, Settable for gel cell battery charge curve to ensure performance
and autonomy, Pulse Width Modulation charge regulation, Factory
mounted in battery box, Controller automatically adjusts for seasonal
light changes, Extends battery life, reduces deep discharge cycling and
enhances autonomy.
Acceptance Criteria:-
34
The product will only be accepted if it completes all the activities as per
requirement and fulfills the required mentioned quality in the project plan
by the customer and the MTA Corporation then it will be accepted
otherwise, Quality manager will manage the problem and make the
product up to the set standard.
Quality Assurance Activities:Quality manager will monitor the project and its activities throughout the
entire project and ensure the quality according to the requirement and
schedule.
Project Monitoring and Control:Monitoring and controlling will be done throughout the entire project by the
quality and Monitoring & controlling department on daily routine.
Project Team Quality Responsibilities:Quality team will be responsible for the overall all products acceptance. Pretest will be done by the team, audit and see the quality time to time
throughout the project and checklist will be made by project manager
according to which quality team will ensure that all the requirements of
the product meets. In short project team quality is responsible for the end
product.
Statement
of Risk
Backup
power
station
is
required
which
may not
be
possible
for some
location
s.
Solar energy
is
influenc
ed by
the
presenc
e of
water
vapor,
pollution
etc. in
the air,
which
may
cause
complex
ities
Considerable
amount
of
energy
is lost
when
DC has
to be
converte
d to AC
Stakehold
er
Affect
ed
Priorit
y
Probabilit
y/
Likelih
ood
Certaint
y
Cost will be
higher
Medium
40%
Medium
High
50%
High
Project
Failure
Medium
affect
Medium
70%
Possible
Caus
es
Possible
Consequ
ences
Bad
Weat
her
Medium
30%
By increasing
Battery
duration
backup
storage.
Air
Polluti
on,
Water
vapor
s
Will disturb
the
working
of solar
street
lights
High
Conversio
n of
DC
into
AC
Cost will
increas
e, High
Mitigation
Strateg
By placing in
dry area
by prote
shield.
Conversion p
can be r
to when
needed.
By stopping
unneces
conversi
DC into
High
Increase
of
Curre
ncy,
Unsta
ble
econo
36
Forecastings
be made
rates are
determin
with the
supplier.
my
Inflation
37
Conclusion:Energy can be produced by many sources but now a days the traditional way
of producing energy is becoming more and more costly as well as there is
no reserves of water through which energy can be generated, so by using
the alternative and new technology to generate electricity is through
solar energy, which is costly but not more than the traditional one and
gives long-term benefits. Overall the project is going to be complete in
short time span with the best outcomes.