Ad CDZZZZ MT Spe 0020 000
Ad CDZZZZ MT Spe 0020 000
Ad CDZZZZ MT Spe 0020 000
BP EXPLORATION
(SHAH DENIZ) LTD
AZERBAIJAN DEVELOPMENTS
D02
03/01/12
AFD
AB
IP
AD
CT
EAA
D01
12/09/11
AB
IP
AD
CT
EAA
A2
19/06/11
AB
CB
A1
22/12/10
AFD
Issued for CB&I
review
IDC
PW
IP
Prepared
Reviewed
Approved
Approved
Approved
Reviewed
Approved
Lead
Manager
SPA
SPA
Senior
Disc Lead
SPA
N/A
N/A
Rev
Date
Reason for
Issue
Notes:
NOTICE: These materials are the
Work Product of KBR and no
reliance on this work product is
authorised by KBR, and KBR
accept no liability for any reliance
by any person on the work product
contained herein. BP has expressly
authorised KBR to issue this
disclaimer.
Originator
Category
KBR
Code
Location Code
CDZZZZ
Document Type
SPE
System Number
00
BP
Description
Common Document
Specification
General
Company
Location
Code
Disc
Doc.
Type
Sequence
No.
Sheet
No.
Rev.
AD
CDZZZZ
MT
SPE
0020
000
D02
Page 1 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Rev.
No.
03/01/12
D02
03/01/12
D02
Colour requirement for pipe subject to heat radiation added to Table C1.
Ref.
Section
3.1.1,
App A
App C
Hold Record
Hold Ref.
Ref.
Section
Page 2 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Table of Contents
1
GENERAL................................................................................................................................................ 6
1.1
PURPOSE........................................................................................................................................... 6
1.2
BP TECHNICAL PRACTICES.................................................................................................................. 6
1.3
REFERENCES...................................................................................................................................... 6
1.3.1
Codes and Standards............................................................................................................... 6
1.3.2
Project Specifications................................................................................................................ 7
1.4
ABBREVIATIONS AND DEFINITIONS........................................................................................................ 7
1.4.1
Abbreviations............................................................................................................................ 7
1.4.2
Definitions................................................................................................................................. 7
1.5
EXCLUSIONS....................................................................................................................................... 8
GENERAL REQUIREMENTS.................................................................................................................. 8
2.1
2.2
2.3
QUALIFICATION REQUIREMENTS........................................................................................................ 9
3.1
PRE-QUALIFICATION OF PRODUCTS...................................................................................................... 9
3.1.1
General..................................................................................................................................... 9
3.1.2
Primer Selection...................................................................................................................... 10
3.1.3
Application Trial....................................................................................................................... 10
3.2
QUALIFICATION OF PERSONNEL......................................................................................................... 10
3.2.1
Qualification of Blasters.......................................................................................................... 10
3.2.2
Qualification of Paint Operators.............................................................................................. 10
3.2.3
Qualification of Supervisors and QC Personnel......................................................................11
3.3
SPECIFIC MATERIAL REQUIREMENTS.................................................................................................. 11
3.3.1
Finger Printing......................................................................................................................... 11
3.3.2
Composition............................................................................................................................ 11
SURFACE PREPARATION.................................................................................................................... 13
4.1
PRE-BLASTING PREPARATIONS........................................................................................................... 13
4.2
BLAST CLEANING.............................................................................................................................. 13
4.2.1
Equivalent Standards.............................................................................................................. 13
4.2.2
Blasting Abrasives................................................................................................................... 13
4.2.3
Blasting Procedures................................................................................................................ 14
4.2.4
Requirements for Blasted Surfaces.........................................................................................14
4.3
ENVIRONMENTAL CONDITIONS........................................................................................................... 14
4.4
ADDITIONAL PREPARATION................................................................................................................. 14
APPLICATION OF COATINGS.............................................................................................................. 15
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
REPAIRS................................................................................................................................................ 17
6.1
6.2
6.3
6.4
GENERAL.......................................................................................................................................... 15
APPLICATION METHOD....................................................................................................................... 15
ENVIRONMENTAL CONDITIONS........................................................................................................... 15
COATING SYSTEMS........................................................................................................................... 15
MULTI-COAT SYSTEMS...................................................................................................................... 16
WELD AREAS.................................................................................................................................... 16
PROTECTION OF APPLIED COATINGS.................................................................................................. 16
COLOUR BLOCKS AND STENCILLING................................................................................................... 16
GENERAL.......................................................................................................................................... 17
INSUFFICIENT THICKNESS.................................................................................................................. 17
EXCESS THICKNESS.......................................................................................................................... 17
REPAIRS TO ZINC COATED SURFACES................................................................................................ 17
GENERAL.......................................................................................................................................... 17
INSPECTION OF PREPARED SURFACES...............................................................................................18
Page 3 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
7.3
7.4
7.5
7.6
AZERBAIJAN DEVELOPMENTS
List of Tables
TABLE C1 - STANDARD COLOUR SCHEDULE.......................................................................................... 27
TABLE C2 - COLOUR SCHEDULE FOR SAFETY PURPOSES...................................................................28
TABLE D1 - PIPEWORK I.D. COLOUR BAND SCHEDULES......................................................................31
Page 4 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
02/08/11
19/06/11
09/11/10
Date
For AFD
For CB&I Review
For Project Spec Update
Reason for Issue
AB
AB
AB
Prepared
IP
CEB
PW
Checked
Approved
Reviewed
Reviewed
Reviewed
Disc. Eng.
Disc. Lead
Eng. Man
Disc.Eng
BP TA
TA
KBR
BP
(proposer)
Page 5 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
1 General
1.1 Purpose
This specification defines the minimum requirements for protective coating of metallic substrates,
including structural steel and piping, as required within the scope of work of the Sangachal
Terminal fabrication sites for Azerbaijan Developments in the Caspian Sea area.
The Contractor may propose the use of alternative coating systems to those specified herein. Any
such alternative system shall be suitable for use in the Caspian Sea coastal environment and
provide equal or better corrosion protection of the steel substrate, as well as resistance to
mechanical damage during handling, fabrication and service to the systems outlined herein.
Approval of such alternatives shall be subject to written approval by the Purchaser.
In general, shop fabricated equipment such vessels, tanks, exchangers, fixed heaters etc., shall be
supplied to the fabrication yard or field jobsite fully finish coated. For these items, the jobsite or
fabrication yard painting shall be limited to touch-up of damaged areas or weld areas left free from
coating.
All carbon steel flanged valves and welded or screwed valves shall be supplied fully coated
according to the coating schedule of this specification.
1.2
BP Technical Practices
Document Title
1.3 References
1.3.1
Document Number
ASTM A123
ASTM A153
ASTM D4285
ASTM G8
ASTM 4541
BS 4800
ISO 12944
ISO 8501-1
ISO 8503
NACE SP0188
NORSOK M501
SSPC
SSPC PA 2
SSPC VIS1-02
Document Title
Page 6 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
Document Number
SSPC-SP 1
SSPC-SP 10
SSPC-SP 3
1.3.2
AZERBAIJAN DEVELOPMENTS
Document Title
Solvent Cleaning
Joint Surface Preparation Standard: Near-White Metal Blast Cleaning
Power tool Cleaning
Project Specifications
Document Number
Document Title
Project Specific
AD-CDZZZZ-MT-SPE-0022
AD-CDZZZZ-MT-SPE-0021
Abbreviations
Abbreviation/
Acronym
ASTM
DFT
ETP
FRP
ISO
MSDS
MPa
NACE
NORSOK
PFP
PVC
QA/QC
TSA
VOC
Description
1.4.2 Definitions
The terms in this specification are defined as follows:
Term
Meaning
Contractor
Manufacturer
Purchaser
Supplier
1.5 Exclusions
The following are excluded from the scope of this specification and are covered by alternative
Project specifications:
UNCONTROLLED WHEN PRINTED
Page 7 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
The following substrates shall not be coated unless otherwise notified by the Purchaser or required
for identification or hazard warning purposes:
Uninsulated duplex and super duplex stainless steels with a normal operating temperature
up to 70C
Uninsulated austenitic steel with a normal operating temperature up to 50C
Super austenitic stainless steels, cupro-nickel and other non-ferrous substrates
Machined surfaces
Flange sealing faces or other sealing faces
Fibre Reinforced Plastic (FRP) items
Galvanised items
2 General Requirements
2.1 Health, Safety and Environment
The Contractor shall be responsible for ensuring that the goods and services supplied meet all
applicable regulations on health, safety and environmental issues. All coating products shall be in
accordance with relevant regulatory requirements of Azerbaijan and accepted international practice
regardless of where the coating operation takes place.
The following documentation shall be provided to the Purchaser on a Material Safety Data Sheet
(MSDS) for each coating system prior to starting the work:
Chemical name of organic solvent and VOC content (Volatile Organic Components g/l).
Percentage of low molecular weight epoxy (molecular weight < 700).
Content of hazardous substances. These shall be listed components stated in terms of
appropriate International standards.
Specification of hazardous thermal degradation components.
Combustibility.
Special handling precautions and personnel protection measures
Page 8 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
2.3 Reporting
A full and comprehensive reporting/recording system shall be maintained by the Contractor. Daily
logs shall be kept covering the following data for all surface preparation and coating operations:
3 Qualification Requirements
3.1 Pre-qualification of Products
3.1.1 General
All products shall be prequalified by a review of the Coating Manufacturers test data and product
data sheets. Each Coating Manufacturer proposed to be used by Contractor shall propose
complete system(s) for the intended duties as shown in Appendix A. Products for the main
structural protection systems shall be capable of meeting the following standards:
The system proposals shall be backed by appropriate long term test data or satisfactory in-service
performance track record for the major structural systems. Independent test results certified in
accordance with NORSOK M501 or similar independent tests over a period of not less than 6000
hours will be preferred.
Any coating system that will be used in combination with cathodic protection shall be certified to
possess a high degree of resistance to cathodic disbondment when tested in accordance with
UNCONTROLLED WHEN PRINTED
Page 9 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
ASTM G8. The extent of disbondment at any point from the periphery of the holiday shall not
exceed 5mm after 28 days.
Alternative systems or materials to those shown in Appendix A may be proposed, but will only be
considered for approval by the Purchaser when supported by suitable documented test data and/or
appropriate service experience. The coating film thicknesses stated are considered appropriate for
the service but may be adjusted at the sole discretion of the Purchaser to reflect the coating
system in-service performance history and test record.
Thermally sprayed aluminium (TSA) shall not be used for immersion services or under insulation or
passive fire protection.
3.1.2 Primer Selection
Zinc silicate or other zinc-rich primers shall not be used for surfaces that may be subject to water
immersion, this includes crude oil and diesel tanks internal surfaces as water may separate from
the oil phase.
The use of blast primers shall be subject to the Purchasers written approval.
3.1.3 Application Trial
Prior to application of any coating systems, a coating trial to evaluate the application of the chosen
product(s) under simulated site conditions shall be performed. This trial shall evaluate the coating
system characteristics including;
Ease of application;
Curing characteristics;
Robustness;
Health and safety;
Ability to successfully pass the full range of tests required by this specification on a
repeatable basis. The test panel for these tests shall be preserved for the full duration of
the contract together with appropriate test documentation.
Page 10 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
1 pipe-end, 2 pipes, 1 angle and 1 flat bar. Alternatively, a location providing similar geometrical
complexity on the component to be coated may be used.
The acceptance criteria are the requirements of the visual and non-destructive inspection of the
coating system described in this document. Variation in the film thickness shall be within the limits
described in this specification and the Coating System Data Sheet as supplied by the Coating
Manufacturer. Operators failing to meet the requirements shall not be allowed to carry out coating
work on the Project.
3.2.3 Qualification of Supervisors and QC Personnel
Personnel carrying out inspection or verification shall be qualified with a certificate from the NACE
Coating Inspection Technicians course.
Supervisors shall be qualified as Inspector in accordance with NACE or equivalent Purchaser
approved qualification.
Page 11 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
4 Surface Preparation
4.1 Pre-blasting Preparations
Preparation methods and procedures for surfaces to be coated shall remove all foreign matter,
surface irregularities and contaminants to bring the surface to the standard of cleanliness specified
in Appendix A prior to the application of coatings.
Before any surface operations commence, any oil, grease or other contaminants on the working
surface shall be removed by solvent cleaning in accordance with SSPC-SP1 "Solvent Cleaning".
Sharp edges, fillets, corners and welds shall be rounded or smoothed by grinding (min R = 2 mm).
Hard surface layers, resulting from flame cutting, shall be removed by grinding prior to blast
cleaning, unless it can be demonstrated by appropriate site trial that the required surface profile
can be achieved on a repeatable basis.
Prior to blast cleaning the surfaces shall be inspected and confirmed as free from any foreign
matter such as weld flux, residue, slivers, oil, grease, salt, etc. All steel stored in a coastal site or
shipped as deck cargo shall be water washed and checked for salt contamination prior to coating
operations. The frequency and nature of these checks shall be sufficient to maintain the required
standard of salt contamination.
Any major surface defects, particularly surface laminations or scabs detrimental to the protective
coating system shall be removed by suitable dressing. Where such defects have been revealed
during blast cleaning, and dressing has been performed, the dressed area shall be reblasted to the
specified standard. All welds shall be inspected and if necessary repaired prior to final blast
cleaning of the area.
ISO 8501-1
SSPC
White Metal
Sa 3
SSPC SP 5-63
Near White
Sa 2
SSPC SP 10-65
Commercial
Sa 2
SSPC SP 6-63
Power Tool
St 3
SSPC SP 3-63
Hand Tool
St 2
SSPC SP 2-63
SSPC SP 1-63
Solvent Cleaning
Page 12 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Page 13 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
A 150mm wide strip of uncoated blast cleaned surface shall be left between primed and unblasted
surfaces to prevent damage to the newly dried coating when additional blasting is done.
When rectification has been necessary on blast cleaned or previously coated surfaces, the dressed
areas shall be re-blasted to remove all rust and contaminants. Blast cleaning shall overlap a
minimum of 25mm into the adjoining coated surface.
5 Application of Coatings
5.1 General
All coating materials in any one particular coating system, whether shop or site applied, shall
originate from a single manufacturer.
The specified primer coating / first coat shall be applied to the prepared metal surface, of the
specified surface roughness, profile depth and degree of cleanliness, as soon as practicable after
completion of blast cleaning (or other approved preparation) of that area. In no case shall the
coating be applied to cleaned surfaces showing evidence of fresh rusting or contamination
(including condensation). Blast cleaned surfaces shall be coated within a maximum of 4 hours
after blast cleaning.
Under adverse weather conditions, e.g. rain, fog, snow, or when such conditions are likely
before the coating has become dry.
When ambient air temperature is below 10C (unless special curing agents are approved
by the Purchaser)
When the ambient air temperature is above 40C
When the relative humidity is higher than 85%
When metal surface temperature is lower than 3C above the ambient dew point
Outside daylight hours on exterior locations
Page 14 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
for each coat. The DFT of any coat shall not be greater than 40% above, nor 15% below, the
nominal value specified.
Page 15 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
6 Repairs
6.1 General
Repair of defective areas shall be accomplished in the same manner as the original coating in
regard to surface preparation prior to re-coating, unless alternative and equivalent methods are
defined within this Specification, or agreed by the Purchaser.
Epoxy coatings which have aged to the point where further application may give rise to intercoat
adhesion problems shall be sweep blasted prior to further coating. Approval for this work shall be
obtained from the Purchaser.
The measured thickness is confirmed by the Coatings Manufacturer in writing as not being
detrimental to the satisfactory service life and performance of the coating system
Testing demonstrates that there is no loss in system (or intercoat) adhesion.
Blast clean surface using grit to the specified standard of cleanliness and roughness.
Apply 70 microns DFT of zinc-rich two-pack epoxy primer.
Apply topcoats as required to achieve original system thickness.
The above procedure is for repairs only. Under no circumstances shall this procedure be
used in place of original priming to specification.
Surface preparation by any other method than blast cleaning shall only be permitted with
the written approval of the Purchaser.
Page 16 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
7.6
Additional Tests
The Purchaser reserves the right to require the Contractor to perform such testing of coating
materials as may be necessary to prove that the quality is in accordance with the Manufacturers
specifications, testing certificates, and data sheets and is suitable, without reduction in
performance, for use under the prevailing application conditions. Qualities to be tested may
include, but not be limited to, the following:
Volume Solids
Viscosity
Page 17 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Pigment Dispersion
Adhesion to Substrate
Drying Time
Cure Time
Percentage zinc in dry film (zinc-rich primers only)
Percentage glass flake in dry film (glass flake containing coatings only)
Percentage epoxy resin in the dry film.
Infra-red finger printing and ash content
Test methods shall generally be in accordance with methods approved by the Purchaser, and shall
be carried out under conditions that reflect the prevailing environmental and application conditions.
100% holiday detection shall be carried out on all coatings used for partial or total immersion
service, and on all coatings subject to burial. The coatings shall be free of pores and holidays.
Detailed holiday detection procedures shall be submitted to the Purchaser for approval.
All coatings shall be tested for adequacy of cure. The test method and frequency shall be
submitted by the Contractor for the Purchasers approval and can involve solvent wiping, pencil
hardness testing or other chemical or mechanical methods.
Page 18 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Page 19 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the Sangachal Terminal Fabrication Site
COATING
SYSTEM
N.
1
AZERBAIJAN DEVELOPMENTS
SURFACE PREP.
TO ISO 8501
NOTES
(see
below)
COAT
SEQUENCE
N.
3, 7
50
300
50
________
________
Total
400
2, 4
8, 9, 14
8, 9, 14
D.F.T.
(Microns)
GENERIC
COATING TYPE
75
125
________
________
Total
200
200 to 300
2&3
N/A
________
________
Total
200 to 300
75
400
________
________
Total
475
75
3000
50
________
________
Total
3125
Page 20 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
COATING
SYSTEM
N.
SURFACE PREP.
TO ISO 8501
NOTES
(see
below)
COAT
SEQUENCE
N.
D.F.T.
(Microns)
GENERIC
COATING TYPE
11, 12,
15
125
125
________
________
Total
250
1, 3
(75)
2
________
500
________
Total
500 (575)
5, 11, 12
1
2
75
PFP
3
________
50
________
Total
TBD
Page 21 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the Sangachal Terminal Fabrication Site
COATING
SYSTEM
N.
9
SURFACE PREP.
TO ISO 8501
NOTES
(see
below)
10
AZERBAIJAN DEVELOPMENTS
COAT
SEQUENCE
N.
D.F.T.
(Microns)
100
2
________
40
________
Total
140
OR
125
125
1
________
75
________
Total
75
GENERIC
COATING TYPE
M.I.O. Epoxy
Urethane acrylic
Epoxy Polysiloxane
Surface tolerant / self priming high
solids epoxy
Notes :
Thickness to be sufficient to achieve
full colour
Markings to be YELLOW to BS 4800
08-E-51 unless shown otherwise on
drawings
12
1, 13
13
125
Hydrocarbon-resistant HB Epoxy
125
Hydrocarbon-resistant HB Epoxy
125
Hydrocarbon-resistant HB Epoxy
________
________
Total
375
OR
1, 13
50
500
________
________
Total
550
100
100
100
________
________
Total
300
Page 22 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the Sangachal Terminal Fabrication Site
COATING
SYSTEM
N.
14
16
17
18
SURFACE PREP.
TO ISO 8501
NOTES
(see
below)
COAT
SEQUENCE
N.
1, 10
50
Epoxy primer
125
125
4
________
125
________
Total
425
1, 16
AZERBAIJAN DEVELOPMENTS
D.F.T.
(Microns)
500
________
______
Total
500
GENERIC
COATING TYPE
75
________
______
Total
75
200
Phenolic Epoxy
Phenolic Epoxy
200
_______
________
Total
400 (Min)
15
125
______
140 (min)
Page 23 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
APPENDIX A NOTES:
1. These systems shall be compatible with a cathodic protection system and shall demonstrate
excellent cathodic disbondment characteristics. When tested in accordance with ASTM G8 or
similar at the specified operating temperature for a period of 28 days, the maximum disbondment
shall be less than 5mm.
2.
Thermal Sprayed Aluminium shall be applied in accordance with the separate Specification for
Thermally Sprayed Aluminium Coatings, AD-CDZZZZ-MT-SPE-0022-000.
3.
Glass flake epoxies shall have demonstrated capability to achieve a continuous pore free film at a
DFT 70% of that specified. They shall contain a minimum of 25% flake glass by weight of total
pigment content in the dry film.
4.
The sealer coat shall be applied as a thin film only to seal the porosity of the thermally sprayed
aluminium coat. The thickness of the sealant is therefore not included in the overall DFT.
5.
The manufacturer of the passive fire protection coating shall approve in writing the primer and tiecoat products by name.
6.
The tie coat may be omitted if the primer is over-coated within 24 hours.
7.
8.
9.
Aggregate shall be graded to provide a hard wearing non-slip surface but shall not be excessively
coarse such that it penetrates the epoxy layer through to the primer.
10. The products must have been tested and be certified to be suitable for use in contact with potable
water in accordance with BS, IMO, ISO or WHO regulations.
11. All coatings to be specifically formulated for use on all types of stainless steel substrates and shall
be free from zinc, chlorides and halide ions.
12. All abrasives for stainless steel items shall be non-metallic and free of chlorides or halides.
13. The products shall be tested and certified as suitable for use in crude oil and refined oil products
by leading international oil companies or reputable independent specialised testing laboratories.
14. All escape routes shall be finish coated for their full width in bright yellow, Shade 08-E-51 to BS
4800 using a polyurethane acrylic applied at a DFT of 50 microns. To ensure a non-slip surface a
fine grade of aluminium oxide shall be dispersed within this topcoat. Access routes shall be
marked down either side by applying a 100mm wide coat of polyurethane acrylic in bright yellow,
Shade 08-E-51 to BS 4800.
15 This coating product shall be specifically formulated to be suitable for continuous operation at
design temperatures up to 180C. This shall be verified by testing performed by independent
specialised coating testing laboratories.
16 Apply weldable primer over whole of underside of base plate surface, limit thickness to 15
microns maximum. Apply the top coat over whole area but not within 50mm of plate edges.
Suitable alternate topcoats may also be used but do not apply within 50mm of plate edges. This
system must be applied before tank base is fabricated.
17 The Manufacturer of the PFP shall advise suitable primers and topcoats for compatibility with the
PFP system. Test data and project experience shall be provided for Purchasers approval
confirming that such systems have the required corrosion resistance. Surface preparation shall,
as minimum, be as detailed in System 8.
Page 24 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Page 25 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Colour
BS 4800 Shade N
Off White
08 B 15
08 E 51 / 04 E 53
Yellow
08 E 51
Off White
08 B 15
Red
04 E 53
Off White
08 B 15
Blue
18 E 53
Light Blue
18 E 50
Semi-gloss
Yellow
08 E 51
Orange
06 E 51
Dark Grey
00 A 09
Off white
08 B 15
WhiteWhite
00-E-55
Page 26 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Item
Additional Colour
Colour
BS 4800 Shade N
Markings
Band
BS 4800 Shade N
Green
14 E 53
Diagonal lines
White
00 E 55
Red
04 E 53
a)
b)
c)
Dangerous materials
White
00 E 55
Checks
Red checks
04 E 53
d)
Safe materials
White
00 E 55
Checks
Green checks
14 E 53
e)
Protection materials
f)
ii)
Green
14 E 53
Yellow
08 E 51
Black
Red
04 E 53
Letters
Letters white
Letters
Letters white
g)
Green
14 E 53
h)
Orange
06 E 51
i)
Handrails on bridges
Golden Yellow
Yellow Gloss
10 E 53
Letters
Letters Black
Tangerine Gloss
06 E 51
Letters
Letters Black
j)
00 E 43
Corrosive Contents
ii)
Toxic Contents
Page 27 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
General
D1.1
All pipe work shall be identified in accordance with the Purchasers identification system
defined in this Appendix. Unless otherwise approved by the Purchaser, the identification
system shall be fitted to erected pipe work including that contained in packaged equipment.
D1.2
All metallic pipe work, except that for firewater shall be coated off-white (BS 4800 colour
shade 08-B-15). Firewater pipe work shall be coated RED. (BS 4800 colour shade 04 E 53).
The generic type of protective coating system applied to pipe work shall be determined by
reference to Appendix A of this specification.
D1.3
All pipe work shall be identification banded by coats of acrylic urethane paint of the required
colour as detailed in Section D2 below.
D1.4
The primary colour (outer) band of the identification tape shall identify the pipe contents e.g.
water, air, oil. The secondary colour (inner) band shall provide additional detail to further
identify the service. Thus, except where stated otherwise, the service shall be fully identified
by the combination of the two banding colours.
D2
D2.1
D2.2
Prior to application of the painted bands the pipe surface shall be thoroughly cleaned of all
surface contamination such as oil, grease, dust, etc using a suitable cleaning solvent
compatible with the underlying coating system. The solvent shall be allowed to completely dry
out before the colour bands are painted.
D2.3
On insulated pipework the colour banding shall be applied only on top of the insulation; for this
purpose only the colour banding shall be a tape system. The tape system shall be heavy duty
acrylic epoxy or equivalent and shall be self-adhesive and resistant to high temperature, ultra
violet light and seawater. For the purposes of this application the term insulation includes all
forms of insulation plus personnel protection, and passive fire protection.
D2.4
Identification colour bands shall be applied on all pipework, oriented so that the flow
directional arrow and label text will be clearly visible by operations personnel. The colour
bands shall be applied immediately adjacent to:
a) All vessels / heat exchangers pumps etc.
b) All valves
c) All pipework junctions
d) All service appliances
e) All wall / floor / ceiling penetrations
In addition to the above locations, the colour bands shall be applied on pipework runs at 6m
1m intervals.
D2.5
Where a second colour is required to identify the specific service a further band shall be
centred on the primary band. The width of the primary and secondary colour bands shall be as
follows:
Pipework 4 dia
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
Pipework < 4 dia
AZERBAIJAN DEVELOPMENTS
A 50 mm wide band shall be used to show the direction of flow. The details of the colour band
system for >4" pipework is illustrated below.
Double Band
Identification
Single Band
Identification
150mm
50mm
50mm
50mm
50mm
50mm
D2.6
In general, and unless otherwise approved by the Purchaser, all diameters for the various
services shall be fitted with the colour band(s) apart from instrument tubing. A minimum of
one arrow shall be visible.
D2.7
On all Supplier packaged equipment the colour banding system shall be applied to the pipe
work contained in the package that connects to pipe work external to the package. The
colour bands shall be located immediately adjacent to the boundary of the package.
Additionally, colour bands shall be applied to all pipe work within complex equipment
packages located on the platforms including but not limited to the following:
D2.6
Gas Metering
Oil Metering
Hydrocyclone
Glycol Regeneration
Chemical Injection
Page 29 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
AZERBAIJAN DEVELOPMENTS
Service
Code
Primary
(Outer) Band
BS 4800
Shade
(Note 1)
Secondary
(Inner)
Band
BS 4800
Shade
(Note 1)
AIR
Breathing Air
Bulk Air
Instrument Air
Plant Air
CHEMICALS
Methanol
Chemical Acid
Chemical, Catalyst
Chemical, Caustic
Aqueous FilmForming Fluid
Glycol (TEG)
Wax inhibitor
Corrosion inhibitor
Anti-Foam
Emulsion Breaker
Biocide
Scale inhibitor
Glycol (MEG)
Oxygen scavenger
Reverse Emulsion Breaker
Sodium Hypochlorite
Rich Glycol/Water to Regen
AB
AC
AI
AP
Light Blue
Light Blue
Light Blue
Light Blue
20-E-51
20-E-51
20-E-51
20-E-51
White
Brown
Green
Grey
00-E-55
06-C-39
12-D-45
00-A-09
CA
CB
CC
CD
CF
CG
CH
CI
CJ
CK
CL
CM
CN
CO
CR
CS
CW
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
Violet
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
22-C-37
18-E-53
04-D-45
16-E-53
10-A-03
20-E-51
00-E-53
06-E-51
00-E-55
10-C-31
10-E-53
04-D-45
12-D-45
00-E-53
14-C-39
06-C-39
04-E-53
04-C-33
H2S Scavenger 4
CZ
Violet
22-C-37
Blue
Dark red
Blue Green
Silver
Light Blue
Black
Orange
White
Cream
Yellow
Burgundy
Green
Black
Dark Green
Brown
Red.
Pink
(1) Pink &
(2) Pink
DC
DG
DH
DO
DS
DW
DX
Black
Black
Black
Black
Black
Black
Black
00-E-53
00-E-53
00-E-53
00-E-53
00-E-53
00-E-53
00-E-53
Red.
Violet
Pink
Green
Brown
Blue
Red
04-E-53
22-C-37
04-C-33
12-D-45
06-C-39
18-E-53
04-E-53
PL
PT
PV
PW
PW
SP
VT
Yellow
Yellow
Yellow
Green
Green
Silver
Yellow
10-E-53
10-E-53
10-E-53
12-D-45
12-D-45
10-A-03
10-E-53
Brown
Blue Green
Not Needed
Black
Brown
Green
Blue
06-C-39
16-E-53
N/A
00-E-53
06-C-39
12-D-45
18-E-53
VA
VG
VH
VL
Yellow
Yellow
Yellow
Yellow
10-E-53
10-E-53
10-E-53
10-E-53
Silver
Black
Green
Pink
10-A-03
00-E-53
12-D-45
04-C-33
FJ
GA
GF
GI
GO
GW
OF
Brown
Red
Yellow
Blue Green
Yellow
Yellow
Brown
06-C-39
04-E-53
10-E-53
16-E-53
10-E-53
10-E-53
06-C-39
Red
Silver
Grey
White
Burgundy
Brown
White
04-E-53
10-A-03
00-A-09
00-E-55
04-D-45
06-C-39
00-E-55
DRAINS
Open Contaminated Drains
Drain Glycol
Hazardous Open Drains
Non-Hazardous Open Drains
Sanitary Black Water Drains
Open Non-Contaminated Drains
Closed Drains (Onshore) 3
PROCESS
Hydrocarbon Liquid
Two-Phase Hydrocarbon
Hydrocarbon Gas
Produced Water (Onshore) 3
Produced Water (Offshore) 3
Steam, Process
Vessel Trim
RELIEF SYSTEMS
Atmospheric Vents
Emergency Diverter Line
High Pressure Vents
Low Pressure Vents
UTILITIES GASES/FLUIDS
Jet Fuel
Firefighting Gas
Fuel Gas (Onshore) 3
Nitrogen/Inert Gas
CO2 Gas
Waste/Flue Gas
Diesel Fuel
UNCONTROLLED WHEN PRINTED
04-C-33
Page 30 of 31
AD-CDZZZZ-MT-SPE-0020-000 D021
General Coating Specification for the
Sangachal Terminal Fabrication Site
Service Name
AZERBAIJAN DEVELOPMENTS
Service
Code
Primary
(Outer) Band
BS 4800
Shade
(Note 1)
Secondary
(Inner)
Band
BS 4800
Shade
(Note 1)
OH
SU
WH
Brown
Silver
Green
06-C-39
10-A-03
12-D-45
Green
Blue
Pink
12-D-45
18-E-53
04-C-33
WC
Green
12-D-45
White
00-E-55
WF
WI
WP
WQ
WX
Red
Dark Green
Green
Green
Green
04-E-53
14-C-39
12-D-45
12-D-45
12-D-45
Not Needed
Yellow
Blue
Silver
Black
N/A
10-E-53
18-E-53
10-A-03
00-E-53
OR
HG
HO
HW
PR
Brown
Violet
Brown
Green
Yellow
06-C-39
22-C-37
06-C-39
12-D-45
10-E-53
Orange
Dark Blue
Blue
Red
Orange
06-E-51
20-D-45
18-E-53
04-E-53
06-E-51
Notes:
1)
2)
3)
4)
The shade Ns for White and Black are referenced in BS 4800 but the colour shade cards are contained
in BS 5252 on which BS 4800 is based.
The following services do not require tape identification:
Lube oil (OL)
Seal oil (OS)
Onshore secondary colour bands are unchanged from the original onshore colour band schemes used for
Caspian projects. They have not been updated to match the offshore colour band scheme.
Two secondary colour bands are required.
Page 31 of 31