0% found this document useful (0 votes)
51 views9 pages

Individual Performance Commitment and Review Form (Ipcrf) : To Be Filled in During Planning To Be Filled During Evaluation

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 9

INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW FORM (IPCRF)

Name of Employee: FRETZIE P. ALCANTARA


Position: SECONDARY SCHOOL TEACHER I
Division: MARINDUQUE
Rating Period: SY: 2015-2016
TO BE FILLED IN DURING PLANNING
MFO

KRAs
Teaching
and
Learning
Process

OBJECTIVES

1.Prepared eight
(8) lesson logs
with appropriate
and updated
instructional
materials in grade
7 and 10 English
weekly. (10%)

TIMELI
NE

June
2015
to
March
2016

Weig
ht
per
KRA

35%

Name of Rater: LINO P. PEAREDONDA


Position: PRINCIPAL I
Date of Review: ________________________
TO BE FILLED DURING EVALUATION
PERFORMANCE INDICATORS

Quality
5-Has prepared8
lesson logs with
complete,
appropriate and
updated instructional
materials weekly.
4-Has prepared6
lesson logs with
complete,
appropriate and
updated instructional
materials weekly.
3-Has prepared4
lesson logs with
complete,
appropriate and
updated instructional
materials weekly.
2-Has prepared2
lesson logs without
updated instructional
materials weekly
1 has not prepared
lesson logs

Efficiency

Timeliness
5 Has submitted 8
lesson logs for
checking weekly
4 Has submitted 6
lesson logs for
checking weekly
3 Has submitted 4
lesson logs for
checking weekly
2 has submitted 2
lesson logs for
checking weekly
1 Has not submitted
any lesson logs for
checking

ACTUAL
RESULTS
Q

Av
e.

RATI
NG

Scor
e

0.5

1.37
5

2. Facilitated
learning in
classroom through
functional lesson
logs, appropriate
instructional
materials and
innovative
teaching
strategies to 79
grade 7 and 55
grade 10 students
handles daily.
(15%)

June
2015
to
March
2016

5 Has attained 50%


and above index of
mastery
4 Has attained
45%-49% index of
mastery
3 Has attained
40%-44% index of
mastery
2 Has attained
35%-39% index of
mastery
1 Has attained 34%
and below index of
mastery

5 Has prepared
appropriate
instructional
materials and
utilized effective
and innovative
teaching
strategies in all
of the lessons
daily
4 Has prepared
appropriate
instructional
materials and
utilized effective
and innovative
teaching
strategies in
most of the
lessons daily
3 Has prepared
appropriate
instructional
materials and
utilized effective
and innovative
teaching
strategies in
some of the
lessons daily
2 Has prepared
appropriate

3.5

0.52
5

3.Checked,
analyzed, treated
and submitted
Quarterly
Assessment
results in English
7 and 10 with at
least 50% MPS
and appropriate
activities for
remediation.
(10%)

August
2015
March
2016

5 Has attained 50%


and above class
MPS in English 7 and
10
4 Has attained 45%
- 49% class MPS in
English 7 and 10
3 Has attained 41%
- 44% class MPS in
English 7 and 10
2 Has attained 35%
- 40% class MPS in
English 7 and 10
1 Has attained 34%
and below class
MPS in English 7 and
10

instructional
materials and
utilized effective
and innovative
teaching
strategies in
only one of the
lessons daily
1 Has not
prepared
appropriate
instructional
materials and
not utilized
effective and
innovative
teaching
strategies in all
of the lessons
daily

3.5
0.35

5 Has submitted the


analyzed Quarterly
Assessment results 7
days after the test
4 Has submitted the
analyzed Quarterly
Assessment results 10
days after the test
3 Has submitted the
analyzed Quarterly
Assessment results 15
days after the test
2 Has submitted the
analyzed Quarterly
Assessment results 20
days after the test
1 Has not submitted
the analyzed Quarterly
Assessment results

Students

Outcome
s

1. Initiated cocurricular
activities and
encouraged
students
participation in
school activities
(Nutrition Month,
Monthly Mass,
Career Guidance
Week, Buwan ng
Wika, SHS
Activities, English
Festival) and
other extracurricular
activities. (15%)

2. Provided
appropriate
learning tasks and
activities that
help enhance
academic and
non-academic
performance of
grade 7 and grade
10 students
throughout the
RPMS cycle.
(10%)

June
2015
March
2016

June
2015
March
2016

35%

5 Has participated
in at least 2 cocurricular/extracurricular activities
with documented
results
4 Has participated
in at least 2 cocurricular/extracurricular activities
with documented
results
3 Has participated
in at least 2 cocurricular/extracurricular activities
with documented
results
2 Has participated
in at least 2 cocurricular/extracurricular activities
with documented
results
1 Has participated
in at least 2 cocurricular/extracurricular activities
with documented
results
5-Has provided
learning tasks suited
to the needs and
interest of all

5-Has attained
80% of the
learning tasks
applied by the
students in the
learning tasks,
projects and
activities
4- Has attained
75%-79% of the
learning tasks
applied by the
students in the
learning tasks,

5 All planned cocurricular and extracurricular activities


were implemented on
time
4 All planned cocurricular and extracurricular activities
were implemented 3
days after the
scheduled time
3 All planned cocurricular and extracurricular activities
were implemented 5
days after the
scheduled time
2 All planned cocurricular and extracurricular activities
were implemented 7
days after the
scheduled time
1 All planned cocurricular and extracurricular activities
were implemented
15days after the
scheduled time

4.5

0.35

0.30

1.27
5

3. Conducted
remediation or
enrichment
program to
improve the class
performance from
2nd to 4th quarter
to address English
learning gaps
from the previous
quarter of the
current school
year (10%)

June
2015March
2016

students
4- Has provided
learning tasks suited
to the needs and
interest of most
students
3- Has provided
learning tasks suited
to the needs and
interest of some
students
2- Has provided
learning tasks suited
to the needs and
interest of few
students
1- Has provided
learning tasks not
suited to the needs
and interest of the
students

5-Has achieved
100% passing rate
at the end of the

projects and
activities
3- Has attained
70%-74% of the
learning tasks
applied by the
students in the
learning tasks,
projects and
activities
2- Has attained
66%-69% of the
learning tasks
applied by the
students in the
learning tasks,
projects and
activities
1- Has attained
64% and below
of the learning
tasks applied by
the students in
the learning
tasks, projects
and activities
5-Has offered
enrichment/reme
diation program
to 100% of the
students who
need it through
self-made
modules /
downloaded

0.30

school year
4 - Has achieved
85%-99% passing
rate at the end of the
school year
3- Has achieved
70%-84% passing
rate at the end of the
school year
2- Has achieved
51%-69% passing
rate at the end of the
school year
1- Has achieved 50%
and below passing
rate at the end of the
school year

activities from
the DepEd portal
and LRMDS
4- Has offered
enrichment/reme
diation program
to 85%-99% of
the students
who need it
through selfmade modules /
downloaded
activities from
the DepEd portal
and LRMDS
3- Has offered
enrichment/reme
diation program
to 70%-84% of
the students
who need it
through selfmade modules /
downloaded
activities from
the DepEd portal
and LRMDS
2- Has offered
enrichment/reme
diation program
to 51%-69% of
the students
who need it
through selfmade modules /
downloaded

activities from
the DepEd portal
and LRMDS
1- Has offered
enrichment/reme
diation program
to 50% and
below of the
students who
need it through
self-made
modules /
downloaded
activities from
the DepEd portal
and LRMDS

Parents
Involvemen
t and
Community
Partnershi
p

1. Conducted
Card
Day/Recognition
Day of honor
students and
Homeroom
PTA/General PTA
with parents
(10%)

2. Initiated in the

June
2015March
2016

30%

5 At least 90% of
the parents attended
and signed the FORM
138
4 - At least 80% of
the parents attended
and signed the FORM
138
3 - At least 70% of
the parents attended
and signed the FORM
138
2 - At least 60% of
the parents attended
and signed the FORM
138
1 - At least 50% of
the parents attended

5 Conducted before
the scheduled time
4 - Conducted on the
scheduled time
3 - Conducted a week
later than the
scheduled time
2 - Conducted 2 weeks
later than the
scheduled time
1 - Conducted 3 weeks
later than the
scheduled time

4.5

0.45

0.45

1.02
5

improvement of
physical
environment,
minor repair of
classrooms,
school facilities,
school projects
and other
teaching-learning
related projects
(15%)

3. Conducted
Home Visitation
for academic
monitoring and
follow-up within
the school year
(5%)

and signed the FORM


138
5 Accomplished at
least 5 school
projects and other
teaching-learning
related projects
4 - Accomplished at
most 4 school
projects and other
teaching-learning
related projects
3 - Accomplished at
most 3 school
projects and other
teaching-learning
related projects
2 - Accomplished at
most 2 school
projects and other
teaching-learning
related projects
1-Accomplished one
new school projector
other teachinglearning related
projects

5-Visited 4 parents
of learners needing
academic monitoring
and follow-up within
the school year

5 Accomplished the
project before the
scheduled time
4 Accomplished the
project on the
scheduled time
3 - Accomplished the
project a week later
than the scheduled
time
2 - Accomplished the
project 2 weeks later
than the scheduled
time
1 - Accomplished the
project 3 weeks later
than the scheduled
time

5 4 parents of
learners needing
academic monitoring
and follow-up visited in
two weeks
4 3 parents of

2.5

.125

4- Visited 3 parents
of learners needing
academic monitoring
and follow-up within
the school year
3- Visited 2 parents
of learners needing
academic monitoring
and follow-up within
the school year
2- Visited 1 parent
of learners needing
academic monitoring
and follow-up within
the school year
1-Not visited any
parent of learners
needing academic
monitoring

learners needing
academic monitoring
and follow-up visited in
3 weeks
3 2 parents of
learners needing
academic monitoring
and follow-up visited
in1 month
2 1 parent of learners
needing academic
monitoring and followup visited in 2 months
1 1 parent of learner
needing academic
monitoring and followup visited in 3 months

3.6
75
FRETZIE P. ALCANTARA

Secondary School Teacher I


Ratee

LINO P. PEAREDONDA
Principal I
Rater

CARLITO M. MATIBA, Ph.D.

OIC Schools Division Superintendent


Approving Authority

3.6
75

You might also like