17 Ge Hitachi
17 Ge Hitachi
17 Ge Hitachi
and operational
performance of the ABWR
and ESBWR designs
Douglas McDonald
Vice President, Nuclear Power Plant
Sales Middle East and Africa
IAEA Technical Meeting on Technology
Assessment for Embarking Countries
June 24-28, 2013
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Wilmington, NC
USA
Tokyo,
Japan
Wilmington, NC
USA
Uranium
Enrichment
Third
Generation
Technology
Wilmington, NC
Yokosuka, Japan
Peterborough, ON
Canada
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Dodewaard - Netherlands
K6/K7 - Japan
KKM - Switzerland
Dresden 1 USA
KRB - Germany
Santa Mara de Garoa - Spain
Lungmen - Taiwan
Vallecitos USA
Laguna Verde - Mexico
Garigliano - Italy
Tarapur 1&2 India
84 operating BWRs
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
ABWR
ESBWR
PRISM
Revolutionary technology
with a rich, 40-year heritage
frequency of any
Generation III reactor
Extensive operational
experience since 1996
Licensed in US, Taiwan,
and Japan
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Operation of a BWR
Saturated water/steam
mixture cooling fuel
Direct cycle (No external
steam generators)
Water moderator modified
by steam voids (bubbles)
To Turbine
FeedWater
Core
Saturated Steam
Saturated Water
Rx Internal
Pumps
(ABWR)
Subcooled Water
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
550 F / 288 C
99.9% Steam
Steam
Dryer
Steam
Separator
BWR Fuel Assembly
- 90 fuel rods encased
in a channel
- 2 water rods
- part-length rods
- burnable absorbers
420 F / 216 F
100% Water
Reactor
Internal Pumps (ABWR)
Control Rod Blades
Control Rod Drives
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
90.96%
89.83%
90%
80%
BWR
PWR
1% BWR
advantage
provides 8
additional
months of
revenue over
60-year
lifetime
PWR
35.5
days
BWR
PWR
Fuel performance
10 fewer days in
BWR outages
in North America
45 days
Source: IAEA PRIS Database and 3/2013 EPRI Fuel Reliability Update
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
U.S. PWRs
2 E-5 (avg.)
U.S. BWRs
8 E-6 (avg.)
Generation II
APR1400
2 E-6
APWR
1.2 E-6
EPR
2.8 E-7
AP1000
2.4 E-7
III+
Generation III
ABWR
1.6 E-7
ESBWR
1.7 E-8
III+
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
30 MIN. 2 HRS.
Operator
Action
24 HRS.
Electric
Power
Water
ABWR
30 MIN.
~36 HRS.*
DECAY HEAT
AP1000
72 HRS.
ESBWR
>7 days
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
10
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
11
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
12
HPCF
RCIC
ADS
LPF
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
13
Containment
heat removal
Core cooling
Reactor depressurization
capability for >7 days due to
battery segregation and
pneumatic controls
Seismic AC independent water
injection into core
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
14
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
15
In Operation
Under Construction
4 Units
4 Units
Ohma ABWR
Under Construction
COD TBD
COD 1996/1997
Shika-2 ABWR
Higashidori-1
Shimane-3 ABWR
Japan
COD 2006
Hamaoka-5 ABWR
Under Construction
COD TBD
Lungmen-1/2 ABWR
Kaminoseki-1
COD 2005
Taiwan
: BWR Power Plant Site
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
Under Construction
COD 2014 (estimated)
16
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
17
MSIV/CV
Condensate Demineralizer
RCCV liner
Upper Condenser
Central Mat
Base Mat
HCU Room
RPV Pedestal
Offgas Equipment
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
18
Walk-through simulation
Full 3D CAD design
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
19
Modularization
Proven experience in operating Gen III plants
RCCV liner
Central Mat
Top Slab
RCCV Rebars
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
20
Predictability of Schedule
Building
RI BC
ABWR#1
CO:1996/11
2M
Commissioning
FL
38M
BC CO
COD
11.2M
49.2M
8.8M
48.3M
Kashiwazaki-Kariwa-6
ABWR#2
CO:1997/7
3.5M
39.5M
1M
43.5M
2.5M
44.5M
Kashiwazaki-Kariwa-7
ABWR#3
CO:2005/1
10.5M
54.0M
Hamaoka-5)
ABWR#4
CO:2006/3
10.5M
55.0M
Shika-2)
RI : Rock Inspection BC:Start of Basemat Construction FL : Fuel Loading CO: Commercial Operation
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
21
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
22
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
23
4500 MWt
1520 MWe
7.17 MPa (1040 psia)
216C (420F)
7.1 meters (23.3 feet)
27.6 meters (90.5 feet)
Natural Circulation
1132 fuel bundles
Shortened length of 3m
269 Fine Motion Control
Rod Drives (FMCRDs)
(2) Nominal
Rated Operation
24
ESBWR
10
10
9
4
7
6
3
8
5
4
5
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
25
MSIV
Condensate Demineralizer
RCCV liner
Upper Condenser
Central Mat
Base Mat
HCU Room
RPV Pedestal
Offgas Equipment
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
26
Natural Circulation
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
27
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
28
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
29
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
passive
decay heat
removal
31
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
32
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
33
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
34
Depressurization Valve
test
WW to DW
Vacuum Breaker
drywell to wetwell
vacuum breaker test
Isolation
Condenser Testing
natural circulation
proven at Dodewaard
GDCS PO
DRYWELL
DW1
DW2
WETWELL
WW1
WW2
RPV
FMCRDs
from ABWR
fuel
modified
GNF2
BiMAC
testing
GIST facility
VACUUM BREAKER
(GDLB TESTS ONLY)
DEPRESSURIZATION
LINE (1 OF 2)
REACTOR
PRESSURE
VESSEL
WETWELL
HORIZONTAL
VENT (1 OF 2)
UPPER
DRYWELL
GDCS INJECTION
LINE (1 OF 4)
BDL
BREAK
LOWER
DRYWELL
35
Operations
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
36
Improved Man-Machine
Interface
Large mimic displays
Prioritized alarms
Flat panel controls
minimize hard switches
Human factored displays
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
37
Simplifications in design
Safety, operations, and reliability
O&M costs
Simpler to operate
Safety and reliability
Operator actions and transients
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
38
39
ABWR
Safe.
Simple.
ESBWR
Smart.
1 Based on the industry standard measure of reactor safety - core damage frequency
2 Claims based on the U.S. DOE commissioned Study of Construction Technologies and Schedules, O&M
Staffing and Cost, and Decommissioning Costs and Funding Requirements for Advanced Reactor
Designs and an ESBWR staffing study performed by a leading independent firm
Copyright 2013 GE Hitachi Nuclear Energy - Americas, LLC - All rights reserved
40