SIX MONTHLY COMPLIANCE REPORT OF

ENVIRONMENTAL CLEARANCE
2640 (4660) MW THERMAL POWER PLANT
At

VILLAGE SUVA, VAGRA TALUKA,


BHARUCH DISTRICT
GUJARAT
Submitted to:

Western Regional Office


Ministry of Environment & Forests,
Central Pollution Control Board, New Delhi &
Gujarat Pollution Control Board, Gandhinagar

Submitted By:

Corporate Environment Group

Adani Power Dahej Limited


Sambhav House, Judges Bunglow Road
Bodakdev, Ahmedabad
Gujarat
PERIOD: October2013 March2014

ADANI POWER DAHEJ LIMITED

CONTENTS
Sl. No.

Title

1.

Introduction

2.

Compliance status of Environmental Clearance

Annexures

ADANI POWER DAHEJ LIMITED


Introduction
Adani Power Dahej Ltd. (APDL), a wholly owned company of Adani Power
Limited, proposed to establish 2640 MW (4x660) Coal-based Supercritical
Thermal Power Plant at Suva Village, Vagra Taluka, Bharuch District in Gujarat.
The project site is located in GIDC, Dahej near village Suva, Taluka Vagra,
Bharuch District in Gujarat. The power plant is based on supercritical, energy
efficient & environment friendly technology.
APDL has been granted Environmental Clearances & Consent to Establish from
Ministry of Environment & Forest and Gujarat Pollution Control Board and APDL
also obtained all necessary statutory / mandatory clearance respectively.
Adani, a conglomerate with a formidable presence in multiple businesses across
the globe, has entered the power sector to harbinger a Power Full India, by
generating 20,000 MW of power by 2020. Comprehension of the criticality in
meeting the power requirement and its crucial role in ensuring the energy
security of India, spurs us to build Indias largest and one of the worlds top 5
single location thermal power plant in Mundra.
Along with thermal power generation, Adani power has made a paradigm shift by
venturing into Solar Power generation in Gujarat. It is Adanis endeavour to
empower one and all with clean, green power that is accessible and affordable for
a faster and higher socio-economic development. Achieving it with out-of-the-box
thinking, pioneering operational procedures, motivated team and a yen for
trendsetting. Enthusiasm and energy has earned us accomplishments that make
the First, Fastest and Largest power company in many aspects.
Adani Power Limited has commissioned the first supercritical 660 MW unit in the
country. Mundra is also the Worlds First supercritical technology project to have
received Clean Development Mechanism (CDM) Project certification from United
Nations Framework Convention on Climate Change (UNFCCC).
The Thermal Power Project construction is yet to start, we have started some
infrastructure development, boundary wall and some enabling works.

ADANI POWER DAHEJ LIMITED

Compliance status of Environmental Clearance


2640 (4660) MW DAHEJ THERMAL POWER PLANT
Vide letter no: J -13012/39/2009-IA.II (T) DATED: 25.10.2011

SN
(i)

Specific Conditions
CRZ Clearance for permissible activities in CRZ
area (as may be applicable) shall be obtained before
starting construction activity.

Compliance Status
Obtained,
Vide letter no. 11-35/2012-IA-III
Dated -09.08.2012

Prospective plan (vision document) for the site


showing future expansion shall be formulated and
submitted to the Ministry within six months

Complied

The structure of the power plant shall be designed in


such a way that it can withstand the impact of
Tsunami or Cyclone.

Noted

In case source of fuel supply is to be changed at a later


stage for the proposed 4x660 MW units now proposed
to be run on imported coal from Indonesia and South
Africa, the project proponent shall intimate the
Ministry well in advance along with necessary requisite
documents for its concurrence for allowing the
change.
Harnessing solar power within the premises of the
plant particularly at available roof tops shall be
undertaken and status of implementation shall be
submitted periodically to the Regional Office of the
Ministry.
Transportation of coal from Dahej Port to power plant
site shall be by dedicated closed conveyor system.

Noted
Change in the source of fuel supply shall
be intimated to the Ministry well in
advance
with
necessary
requisite
documents.

(vii)

Sulphur and ash contents in the coal to be used in the


project shall not exceed 0.5 % and 15 % respectively at
any given time. In case of variation of coal quality at
any point of time, fresh reference shall be made to the
Ministry for suitable amendments to environmental
clearance condition wherever necessary

Change in the source of fuel (Coal


Quality) supply for proposed power plant
will be intimated to the Ministry well in
advance along with necessary requisite
documents for its concurrence for
allowing the change.

(viii)

Bi-flue stack of 275 m height shall be provided with


continuous online monitoring equipments for SOx, NOx
and Particulate Matter (PM2.5 & PM10). Exit velocity
of flue gases shall not be less than 22 m/sec.
Mercury emissions from stack shall also be monitored
on periodic basis.

Two bi flue Stacks of 275 meter &


Continuous Emission Monitoring System
will be installed in all flues for SO2, NOX.
& PM. The designed flue gas velocity is
more than 22 m/sec. Hg monitoring in
stack will be carried out once in six
month.

(ix)

NOC from the State Pollution Control Board shall be


obtained.

Complied

(ii)

(iii)

(iv)

(v)

(vi)

Vision documents already submitted


along with Compliance Report of Nov.11
to March12.

The structure has been designed based


on highest tide FGL will be 12m above
chart datum.

Noted.
Compliance assured

Noted
Compliance assured

Obtained and already submitted along

ADANI POWER DAHEJ LIMITED


with Compliance Report of Nov.11 to
March2012.
No water bodies including natural drainage system in
the area shall be disturbed due to activities associated
with the setting up / operation of the power plant.
COC of at least 1.5 shall be adopted.

There are no streams within the plant


premises.

(xii)

Intake shall be designed to ensure aggregation of fish


and other marine creatures.

Intake channel is designed for flow rate


of less than 2 m/s to ensure aggregation
of fish and other marine creatures.

(xiii)

Continuous monitoring of marine biology shall be


undertaken by an institute of repute. The marshy areas
in the vicinity (if any) which may hold large quantities
of water shall not be disturbed.
Transit storage (guard pond) shall be developed to
ensure that cooling water discharge is done near about
ambient temperature. Details shall be submitted to the
Regional Office of the Ministry.

Noted

(xv)

A well designed rain water harvesting system shall be


put in place which shall comprise of rain water
collection from the built up and open area in the plant
premises. Action plan and road map for implementation
shall be submitted to the Regional Office of Ministry.

Design for rain water harvesting scheme


prepared by Geo Engineering Services,
Vadodara, Gujarat and the report has
been submitted along with compliance
Report of April12 to September12 to
Regional Office of CGWB, Ahmedabad &
MoEF regional office, Bhopal for valuable
suggestion & implementation.

(xvi)

There shall not be any contamination of soil ground


and surface waters (canals & village pond) with sea
water in and around the project sites. In other wards
necessary preventive measures for spillage from
pipelines, such as lining of guard pond used for the
treatment of outfall before discharging in to the sea
and surface RCC channels along the pipelines of outfall
and intake should be adopted.
Additional soil for leveling of the proposed site shall be
generated within the sites (to the extent possible) so
that natural drainage system of the area is protected
and improved.

Noted.

(xviii)

Space provision for installation of FGD shall be made.

Space has been provided for FGD in the


project layout.

(xix)

High Efficiency Electrostatic Precipitators (ESPs) shall


be installed to ensure that particulate emission from
the proposed plant does not exceed 50 mg/Nm3

High
efficiency
Electrostatic
Precipitators (ESP) will be installed in
each boiler to meet PM emission of less
than 50mg/Nm3.

(x)
(xi)

(xiv)

(xvii)

This has been incorporated in the plant


design and will be ensured during plant
operation to maintain the COC more
than 1.5.

Compliance assured

Compliance assured
Guard pond will be established and
differential
temperature
will
be
maintained and submitted to the
Regional Office MoEF, Bhopal.

Intake channel will be lined from HTL to


the plant intake pump house. Outfall will
be through pipeline.

The entire project area is almost flat.


Hence chances for generation of top soil
are negligible. There are no streams
within the plant premises.

ADANI POWER DAHEJ LIMITED


(xx)

Adequate dust extraction system such as cyclones/


bag filters and water spray system in dusty areas such
as in coal handling and ash handling points, transfer
areas and other vulnerable dusty areas shall be
provided.

Dust extraction system with Bag filter in


Crusher House is proposed. Pneumatic
ash handling system with bag filters for
ash handling & water sprinkling system
will be provided in Coal yard.

(xxi)

Utilisation of 100% Fly Ash generated shall be made


from 4th year of operation of the plant. Status of
implementation shall be reported to the Regional Office
of the Ministry from time to time.

Ash utilization plan/schedule has been


incorporated in the EIA report. Status of
implementation shall be reported to the
Regional office, MoEF regularly during
plant operation.

(xxii)

Fly ash shall be collected in dry form and storage


facility (silos) shall be provided. Unutilized fly ash shall
be disposed off in the ash pond in the form of slurry
form. Mercury and other heavy metals (As, Hg> Or. Pb
etc.) will be monitored in the bottom ash as also in the
effluents emanating from the existing ash pond. No
ash shall be disposed off in low lying area.
Ash pond shall be lined with HDPE/LDPE lining or any
other suitable impermeable media such that no
leachate takes place at any point of time. Adequate
safety measures shall also be implemented to protect
the ash dyke from getting breached.
Fugitive emission of fly ash (dry or wet) shall be
controlled such that no agricultural or non-agricultural
land is affected. Damage to any land shall be mitigated
and suitable compensation provided in consultation
with the local Panchayat.
To absorb the ground level pollutants, to act buffer
against strong winds arising out of tropical cyclones/
storms, to reduce heat load and ameliorate
environment, there is a need, for shelterbelts /
greenbelts / tree cover along the coastline, bunds
around marshy areas, roadsides, around the project
boundaries, around village boundaries, ash dykes,
railway lines, around protected monuments, forts,
waste places, School Campuses and other vacant lots.
Coconut plantations can be developed along the
coastline and hear villages, Schools and forts. Stands
of Casuariana should also be developed, on some dunes
and along coasts. Bamboos, Neem and other native
trees should be planted in and around at the villages.
The project proponent shall not hamper the vocation of
the fishing community in the area, (if any) and it shall
be ensured that local fishing community shall be
allowed to carry out their vocation.
Aliabet Mangrove conservation and regeneration plan
shall be formulated and implemented during the
development of project itself and the status of
implementation shall be submitted to the Regional
Office of the Ministry from time to time. In addition
about 100 ha in and around the area shall be

Noted.

(xxiii)

(xxiv)

(xxv)

(xxvi)

(xxvii)

Compliance assured.

Noted.
Compliance assured.

The crusher houses for coal shall be


provided with dust extraction system &
Bag Filters. Water sprinkling system will
be provided in the coal yard.
Compliance assured.

Compliance assured.
There is no fishing activity near the
intake & outfall area.
Compliance assured.

ADANI POWER DAHEJ LIMITED


(xxviii)

(xxix)

(xxx)

(xxxi)

(xxxii)

(xxxiii)

(xxxiv)

(xxxv)

(xxxvi)

developed into mangrove forests.


In addition long term impact on Mangrove due to SO2
emission shall be carried out in due course and Report
submitted to the regional Office of the Ministry.
Green Belt consisting of three tiers of plantations of
native species around plant and at least 75 m width
shall be raised. Wherever 75 m width is not feasible a
50 m width
shall be raised and adequate
justification shall be submitted to the Ministry. Tree
density shall not less than 2500 per ha with survival
rate not less than 80 %
A common Green Endowment Fund shall be created
and the interest earned out of it shall be used for the
development and management of green cover of the
area.
A Fishermen Endowment Welfare Fund shall also be
created not only to enhance the quality of life of
fishermen community through creation of facilities for
fish landing platforms / fishing harbour / cold storage,
but also to provide relief in case of emergency
situations such as missing of fishermen on duty due to
rough seas, tropical cyclones and storms etc.
The project proponent shall also adequately contribute
in the development of the neighboring villages. Special
package with implementation schedule for free potable
drinking water supply in the nearby villages and
schools shall be undertaken m a time bound manner.

Compliance assured.

Compliance assured.
Green belt development / plantation is
being developed and our efforts are
being made to develop more greenery in
& around the plant with survival rate >
80%.
Noted

Compliance assured.

Being followed
Social development
carried out under the
Adani
Foundation.
Assessment
Study
submitted along with
report.

activities being
CSR activities by
Need
based
report
already
first compliance

At least three nearest village shall be adopted and


basic amenities like development of roads, drinking
water supply, primary health centre, primary school etc
shall be developed in co-ordination with the district
administration.
The project proponent shall also adequately contribute
in the development of the neighboring villages. Special
package with implementation schedule for providing
free potable drinking water supply in the nearby
villages and schools shall be undertaken in a time
bound manner.

Noted.

An amount of Rs 58.82 Crores shall be earmarked as


one time capital cost for CSR programme.
Subsequently a recurring expenditure of Rs 11.76
Crores per annum till the life of the plant shall be
earmarked as recurring expenditure for CSR activities.
Details of the activities to be undertaken shall be
submitted within one month along with road map for
implementation.
CSR scheme shall, be identified based on need based
assessment in and around the villages within 5.0 km of

A separate budget earmarked for CSR


activities in Need based Assessment
Study report and report already
submitted to your good office

Compliance assured.

Being followed
Social development activities being
carried out for need base families under
the CSR activities by our Adani
Foundation. Need based Assessment
Study report already submitted.

We have carried out a Need Base


Assessment
study
for
community

ADANI POWER DAHEJ LIMITED

(xxxvii)

the site and in constant consultation with the village


Panchayat and the District Administration. As part of
CSR prior identification of local employable youth and
eventual employment in the project after imparting
relevant training may also undertaken. Income
generating projects consistent with the traditional
skills of the people shall be undertaken. Development
of fodder farm, fruit bearing orchards, vocational
training etc. can form a part of such programme.
Company shall provide separate budget for community
development activities and income
generating
programmes.
Vocational training programme for
possible self employment and jobs shall be imparted to
identify villagers free of cost.
It shall be ensured that in-built monitoring mechanism
for the schemes identified is in place and annual social
audit shall be got done from the nearest government
institute of repute in the region. The project proponent
shall also submit the status of implementation of the
scheme from time to time.

development of nearby village. Study


report has been already submitted.

Compliance assured.

General Conditions:
(i)

(ii)

(iii)

(iv)

(v)

A Corporate Environmental Policy shall be formulated


and after due approval of the Board of Directors of the
Company shall be submitted to the Ministry within six
months. The policy shall specifically address issues of
adherence to environmental policy so formulated arid
environmental clearance conditions stipulated for the
power project and also others including matters related
to violations of stipulated conditions (if any) to the
Board.
A sewage treatment plant shall be provided (as
applicable) and the treated sewage shall be used for
raising greenbelt/plantation.
A well designed rainwater harvesting shall be
constructed. Central Groundwater Authority/ Board
shall be consulted for finalization of appropriate
rainwater harvesting technology, within-a period of
three months from the date of issue of clearance and
details shall be furnished to the Regional Office of the
Ministry.

Compliance assured, once the project


take off.

Adequate safety measures shall be provided in the


plant area to check/minimize spontaneous fires in coal
yard, especially during summer season. Copy of these
measures with full details along with location plant
layout shall be submitted to the Ministry as well as to
the Regional Office of the Ministry.
Storage facilities for auxiliary liquid fuel such as LDO/
HFO /LSHS shall be made in the plant area in
consultation with Department of Explosives, Nagpur.
Sulphur content in the liquid fuel will not exceed 0.5%.
Disaster Management Plan shall be prepared to meet

Adequate safety measures will be


established in the plant area. Detailed
information /data will be submitted to
MoEF.

Compliance assured.

Design for rain water harvesting scheme


is being prepared by Geo Engineering
Services, Vadodara, Gujarat and the
report already submitted to Regional
Office of CGWB, Ahmedabad & MoEF
regional office, Bhopal for valuable
suggestion & implementation

The LDO/HFO/LSHS will be properly


stored in minimum risk area. A Disaster
Management Plan will be prepared &
Mock
drills
will
be
conducted

ADANI POWER DAHEJ LIMITED

(vi)

(vii)

(viii)

(ix)

(x)

(xi)

(xii)

any eventuality in case of an accident taking place due


to storage of oil.
Regular monitoring of ground water level shall be
carried out by establishing a network of existing wells
and constructing new piezeometers. Monitoring
around the ash pond area shall be earned out
particularly for heavy metals (Hg,Cr,As,Pb) and records
maintained and submitted to the Regional Office of
this Ministry. The data so obtained should be
compared with the baseline data so as to ensure that
the ground water quality is not adversely affected clue
to the project.
Monitoring surface water quantity and quality shall also
be regularly conducted and records maintained. The
monitored data shall be submitted to the Ministry
regularly. Further, monitoring points shall be located
between the plant and drainage in the direction of flow
of ground water and records maintained. Monitoring
for heavy metals in ground water shall be undertaken.
First Aid and sanitation arrangements shall be made for
the drivers and other contract workers during
construction phase.
Noise levels emanating from turbines shall be so
controlled such that the noise in the work zone shall be
limited to 75 dBA. For people working in the high noise
area, requisite personal protective equipment like
earplugs/ear muffs etc. shall be provided. Workers
engaged in noisy areas such as turbine area, air
compressors etc shall be periodically examined to
maintain audiometric record and for treatment for any
hearing loss including shifting to non-noisy/noise less
areas.
Regular monitoring of ground level concentration of
SO2, NOx, PM2.5 & PM10 and Hg shall be carried out in
the impact zone and records maintained. If at any stage
these levels arc found to exceed the prescribed limits,
necessary control measures shall be provided
immediately. The location of the monitoring stations
and frequency of monitoring shall be decided in
consultation with SPCB. Periodic reports shall be
submitted to the Regional Office of this Ministry. The
data shall also be put on the website of the company.
Provision shall be made for the housing of construction
labour (as applicable) within the site with all necessary
infrastructure and facilities such as fuel for cooking,
mobile toilets, mobile STP, safe drinking water, medical
health care, creche.etc. The housing may be in the
form of temporary structures to be removed after the
completion of the project.
The project proponent shall advertise in at least two
local newspapers widely circulated in the region
around the project, one of which shall be in the

periodically.
Regular monitoring of ground water
quality including heavy metals will be
carried out in and around the project
area.
Piezometric wells will be
established around the ash pond.
Records will be maintained and the same
shall be submitted to Regional office of
the Ministry at Bhopal.

Compliance assured, once the project


take off.

First Aid centre / facility will be made


available during construction phase.
Necessary action has been taken care in
designed to maintain noise levels within
75 dBA. The working personnel will be
provided with appropriate personnel
protective equipment (PPEs) & periodic
audiometric check up will be carried out
during operation.

Compliance assured, once the project


take off.

Will be provided as required

Complied
Advertisement

in

Two

Local

News

ADANI POWER DAHEJ LIMITED

(xiii)

(xiv)

(xv)

(xvi)

(xvii)

vernacular language of the locality concerned within


seven days from the date of this clearance letter,
informing that the project has been accorded
environmental clearance and copies of clearance letter
are available with the State Pollution Control
Board/Committee and may also be seen at Website of
the Ministry of Environment and Forests at http: /
/envfor.nic.in.
A copy of the clearance letter shall be sent by the
proponent to concerned Panchayat, Zila Parisad /
Municipal Corporation, urban local Body and the Local
NGO, if any, from whom suggestions/representations, if
any, received while processing the proposal. The
clearance letter shall also be put on the website of the
Company by the proponent.
An Environmental Cell shall be created at the project
site i t s e l f and shall be headed by an officer of
appropriate seniority and qualification. It shall be
ensured that the head of The Cell shall directly report
to the Head of the Organization. The status report on
the functioning of the Cell shall be submitted to the
Regional office of the Ministry periodically. The Cell
shall comprise of an expert in Marine Biology, Fishery
and Mangroves preservation.
The proponent shall upload the status of compliance of
the stipulated environmental clearance conditions,
including results of monitored data on their website
and shall update the same periodically. It shall
simultaneously be sent to the Regional Office of MOEF,
the respective Zonal Office of CPCB and the SPCB. The
criteria pollutant levels namely: SPM, RSPM (PM2.5 &
PM10), SO2, NOx (ambient levels as well as stack
emissions) shall be displayed at convenient location
near the main gate of the company in the public
domain.
The environment statement for each financial year
ending 31sl March in Form-V as is mandated to be
submitted by the project proponent to the concerned
State Pollution Control Board as prescribed under the
Environment (Protection) Rules, 1986, as amended
subsequently, shall also be put on the website of the
company along with the status of compliance of
environmental clearance conditions and shall also be
sent to the respective Regional Offices of the Ministry
by e-mail.
The project proponent shall submit six monthly reports
on the status of the implementation of the stipulated
environmental safeguards to the Ministry of
Environment and Forests, its Regional Office, Central
Pollution Control Board and State Pollution Control
Board. The project: proponent shall upload the status
of compliance of the environment of the environmental

Papers, Gujarati & English, and Copy of


advertisement already submitted along
with first compliance report.

Complied

We have established Environment


Management Department with Senior
Management at Corporate level. Site
Env. Cell will be created once project
construction is started.

Six monthly compliance status report is


regularly submitted to MoEF, CPCB &
GPCB. The same is sent by email also.
Compliance status updated on Companys
website.
Compliance assured, once the project
take off.

Compliance assured.

Six monthly compliance status report is


regularly submitted to MoEF, CPCB &
GPCB. The same is sent by email also.
Compliance status updated on Companys
website.
Last compliance report for the period of
April2013 to September2013 had been

ADANI POWER DAHEJ LIMITED

(xviii)

(xix)

(xx)

(xxi)

clearance conditions on their website and update the


same periodically and simultaneously send the same by
e-mail to the Regional Office, Ministry of Environment
and Forests.
Regional Office of the Ministry of Environment &
Forests will monitor the implementation of the
stipulated conditions. A complete set of documents
including Environmental Impact Assessment Report
and Environment Management Plan along with the
additional information submitted from time to time
shall be forwarded to the Regional Office for their
reference during monitoring. Criteria pollutants levels
including NOx (from stack & ambient air) shall be
displayed at the main gate of the power plant.
Separate funds shall be allocated for implementation
of environmental protection measures along with itemwise break-up. These cost shall be included as part of
the project cost. The funds earmarked for the
environment protection measures shall not be diverted
for other purposes and year-wise expenditure should
be reported to the Ministry.
The project authorities shall inform the Regional Office
as well as the Ministry regarding the date of financial
closure and final approval of the project by the
concerned authorities and the dates of start of land
development work and commissioning of plant.
Full cooperation shall be extended to the Scientists /
Officers from the Ministry / Regional Office of the
Ministry at Bangalore / CPCB / SPCB who would be
monitoring the compliance of environmental status.

submitted
our
vide
letter
no.:
APL/APDL/EMD/EC/MoEF/254/12/13.
Dated- 06.12.2013.
Noted.
Compliance assured.

Separate fund has been already


allocated for Environmental protection.
Fund for Environment management:
Capital Cost: Rs. 700 Crores (Proposed)
Recurring Cost: 7.00 Crores / year.
Financial Closure yet to be achieved

and Construction work yet to start.