ENVIRONMENTAL CLEARANCE
2640 (4660) MW THERMAL POWER PLANT
At
Submitted By:
CONTENTS
Sl. No.
Title
1.
Introduction
2.
Annexures
SN
(i)
Specific Conditions
CRZ Clearance for permissible activities in CRZ
area (as may be applicable) shall be obtained before
starting construction activity.
Compliance Status
Obtained,
Vide letter no. 11-35/2012-IA-III
Dated -09.08.2012
Complied
Noted
Noted
Change in the source of fuel supply shall
be intimated to the Ministry well in
advance
with
necessary
requisite
documents.
(vii)
(viii)
(ix)
Complied
(ii)
(iii)
(iv)
(v)
(vi)
Noted.
Compliance assured
Noted
Compliance assured
(xii)
(xiii)
Noted
(xv)
(xvi)
Noted.
(xviii)
(xix)
High
efficiency
Electrostatic
Precipitators (ESP) will be installed in
each boiler to meet PM emission of less
than 50mg/Nm3.
(x)
(xi)
(xiv)
(xvii)
Compliance assured
Compliance assured
Guard pond will be established and
differential
temperature
will
be
maintained and submitted to the
Regional Office MoEF, Bhopal.
(xxi)
(xxii)
Noted.
(xxiii)
(xxiv)
(xxv)
(xxvi)
(xxvii)
Compliance assured.
Noted.
Compliance assured.
Compliance assured.
There is no fishing activity near the
intake & outfall area.
Compliance assured.
(xxix)
(xxx)
(xxxi)
(xxxii)
(xxxiii)
(xxxiv)
(xxxv)
(xxxvi)
Compliance assured.
Compliance assured.
Green belt development / plantation is
being developed and our efforts are
being made to develop more greenery in
& around the plant with survival rate >
80%.
Noted
Compliance assured.
Being followed
Social development
carried out under the
Adani
Foundation.
Assessment
Study
submitted along with
report.
activities being
CSR activities by
Need
based
report
already
first compliance
Noted.
Compliance assured.
Being followed
Social development activities being
carried out for need base families under
the CSR activities by our Adani
Foundation. Need based Assessment
Study report already submitted.
(xxxvii)
Compliance assured.
General Conditions:
(i)
(ii)
(iii)
(iv)
(v)
Compliance assured.
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
periodically.
Regular monitoring of ground water
quality including heavy metals will be
carried out in and around the project
area.
Piezometric wells will be
established around the ash pond.
Records will be maintained and the same
shall be submitted to Regional office of
the Ministry at Bhopal.
Complied
Advertisement
in
Two
Local
News
(xiii)
(xiv)
(xv)
(xvi)
(xvii)
Complied
Compliance assured.
(xviii)
(xix)
(xx)
(xxi)
submitted
our
vide
letter
no.:
APL/APDL/EMD/EC/MoEF/254/12/13.
Dated- 06.12.2013.
Noted.
Compliance assured.
Noted
Full co-operation shall be extended.