When North Gold Project Seeking Investors To Develop in Zimbabwe
When North Gold Project Seeking Investors To Develop in Zimbabwe
When North Gold Project Seeking Investors To Develop in Zimbabwe
Date: 08/06/15
4 Deal Terms
5 Name and contact details of promoter
**Request for missing required information.
CHECKED
X
X
X
X
X
FACTOR
COMMENTS
Country
Zimbabwe, Africa
Investment
Sought/ Cost
Location
Project is located in Motapa, Sijauke village which is 120km North west of Bulawayo.
Access is gained by taking Bulawayo Nkayi road(strip tarred road) which goes to Isabella mine .
About 10km from Nkayi turn off turn left at T- junction(Motapa turn off) to Sijauke village for 6km on gravel road.
Total Project Size: 40 Hectares
Number of gold claims : 4 Gold Claims.
Infrastructure
National road (strip tarred) Bulawayo Nkayi road passing via near the Joshua Nkomo airport
Tenure
Name of claim
Type
size
Year registered
When North 2
Mining
10 hecteres
11 January 2011
When North 3
Mining
10 hectares
11 January 2011
When North 4
Mining
10 hectares
11 January 2011
When North 5
Mining
10 hectares
11 January 2011
Ownership
Geology
Lovemore Mauled
Cell: + 27 71 980 1399
Email: [email protected]
Skype: lovemore.mauled
Regional setting When North gold claims are situated on the western margin of Bubi greenstone belt.A number of archaen greenstone belts
& metallogenesis
host the majority of gold deposits in Zimbabwe.
Mineralization is within a broad shear zone cutting through felsic schists close to contact between rocks of the
Exploration
Lithologies
Andesites
Pillow basalts
Feisic Schists
Structure
History
Extensive soil geochemistry, trenching, pitting and drilling activities were done by Anglo American Zimbabwe Ltd. The
data is proprietary
and is not available to the current holders of the claims at the moment.
The huge open cast Motapa mine, Isabella mine, McCays mines and Bubi mine have been mined by Anglo American .
Artisanal miners have been active in the area since the closing down of Motapa Mine.
Exploration activities near the When gold claims led to the discovery of Open pittable resources.
Metalassociation
style
Mineralogy
Extensive drilling was done by Anglo-America,who are the former owners of Isabella mine.
Records of the drilling are not available.
Within shear zone there are a number of elongate pods of mineralization which occur as brecciated and Silicified stock-work
and zones impregnated with pyrites and arsenopyrites.
Arsenopyrite
Pyrite
Resource
Mining
Controls
Strike length
Width
and
orientation
Depth (open pit
potential)
Resource
Size
and Grade
Methodology of
estimation
Upside potential
Study status
Mining method
To be determined.
None yet on the site. The project is early stage greenfield.
Past Production
No records are available at the moment.However, the mining that occurred in the surrounding areas by Anglo American Ltd
and other companies indicate that the area has potential for gold. This is also supported by the general location of the project
on the Bubi Greenstone Belt.
Needs to be determined once an interested investor/funder is found
Reserve
Processing
These need to determined through exploration activities such as trenching and drilling and laboratory analyses of samples
To be determined
Potential to peg more gold claims around the property. This will increase the project size as well as life of mine.
Small scale gold mining has taken place in and around the claims.
Technical risks
Litigation
Recommend
ation
Data Source
Deal Terms
Source
Nearby Mines
Project Budget
Exploration
EXPLORATION PLAN & RESOURCE EVALUATION
ACTIVITIES
Reconnaissance survey and Field mapping
Trenching Trenches will be dug at 100m intervals across strike, each trench 500m long and samples will be taken in each trench on bed rock
Diamond Drilling 16 holes will be drilled on the 4 claims, on a grid of 100m X 100m to investigate gold mineralization and behavior of mineralized sections
with depth, to get dip of ore body, depth and thickness of ore body. Diamond drill boreholes will be drilled to a depth of 60 metres @$150 per metre
Diamond drill cores will be logged and taken for analysis. The analysis envisaged will include Bottle roll and Fire assay.
Diamond Drilling is done to declare Resources and Reserves which assist in projecting the life span of the mine. Mining geological soft wares will be used for
ore Reserves calculations.
Compilation of a detailed Geological report with all maps, core log sheets, assay results and estimation of Life span of the mine.
Drawing up of operational plan and pit designs
QUANTITY
UNIT PRICE
4 X 4 Bakkie (diesel)
2 $12 000
Reconnaissance Survey
1 $500
100 $18
16 $9 000
200 $18
TOTAL (US $)
$24000
$500
$1800
$144 000
$3 600
Stationery, internet,
phone
1 $1000
$1000
1 $2000
$2000
Measuring Tape
4 $150
$600
4 $25
$100
10 $15
$150
Shovels
10 $10
$100
5 $300
$1500
10000 $1.50
$15 000
Tents
Diesel Fuel
12 $5000
Food
$60000
$254 350
TOTAL
NB: Costs to include
hiring of excavator
Labour
Project Manager@4800
per month
Geologist @ $4000 per
month
12
4800
$57600
12
4000
$48000
Geological Assistants
@$30/day for 26 days
2 assistants
$1000
$24000
10 general labour
$250
$30000
Cook
300
$3600
$300 000
TOTAL
$163200
LICENCES
Company Registration
1 $300
$300
1 $500
$500
Zimbabwe Investment
Authority Licence
1 $3 000
1 $500
$3 000
$500
1 $400
$400
Legal fees
1 $1 000
$1 000
Environmental Impact
Assessment
1 $5 000
$5 000
TOTAL
$10 700
1 $242350
Labour
1 $163200
Licences
1 $10 700
$254350
$163200
$10700
$428250
Sub Total
10% Contigency
Grand Total
$42825
$471075
_________________________________________________
PROCESSING PLANT
ITEM
5 Tonne/hour ball mill
Concentrators
Crusher
Ore bin
Conveyors
Scrapper Winch
Slurry pumps
Thickener
100 cubic metre Leach tanks
Carbon Tanks
Elution Plant
Total
QUANTITY
2
2
1
1
UNIT PRICE
$70 000
$3 500
$10 000
$8 000
1
2
1
2
4
1
$5 000
$500
$30 000
$7 000
$5 000
$35 000
TOTAL
$140 000
$7 000
$10 000
$8 000
$12 000
$5 000
$1 000
$30 000
$14 000
$20 000
$35 0000
$282 000
VEHICLES
ITEM
Excavator
10 tonne tipper trucks
Front End Loader
Compressors
+jackhammer+hose
7 tonne truck
4X4 Bakkies
Minibus
TOTAL
QUANTITY
1
4
1
4
UNIT PRICE
$400 000
$80 000
$250 000
$10 000
TOTAL
$400 000
$320 000
$250 000
$40 000
1
4
1
$30 000
$25 000
$20 000
$30 000
$100 000
$20 000
$1 160 000
QUANTITY
1
1
1
UNIT PRICE
$1 500
$3 000
$400
TOTAL
$1 500
$3 000
$400
$4 900
QUANTITY
1
10
2
1
UNIT PRICE
$30 000
$120
$500
$10 000
TOTAL
$30 000
$1 200
$1 000
$10 000
$42 200
LICENCES
ITEM
Rural council fee
Milling permit
Borehole licence
TOTAL
TOOLS
ITEM
200 kVa Generator
Wheel barrows
Tool boxes
Office furniture
TOTAL
____________________________________________________________________________
INFRASTRUCTURE DEVELOPMENT
ITEM
Ball mill installation
TOTAL
$10 000
Office block
Staff quarters
Borehole +piping
Workshop
Electricity
Electrical tubing
Plumbing
Fencing + signs
Water Reservoirs
Magazine
Guest house/ management house
Fuel storage
TOTAL
1
4
1
1
1
1
1
1
2
1
1
1
$15 000
$5 000
$15 000
$5 000
$20 000
$10 000
$5 000
$5 000
$1 000
$10 000
$10 000
$5 000
$15 000
$20 000
$15 000
$5 000
$20 000
$10 000
$5 000
$5 000
$2 000
$10 000
$10 000
$5 000
$132 000
MONTHLY CONSUMABLES
ITEM
Diesel
Electricity
Explosives
Drill bits
Drill sticks
Fertilizer
Cyanide
Carbon
Solution Tests+Test Tubes
Stationery
Telephone +Internet
Rock Drill oils
Maintenance spare parts
Canteen supplies
Labour (salaries)
PPE
TOTAL for 12 months
$350
$20
$40
$24
200
$125
$100
$61
TOTAL
$30 000
$10 000
$10 500
$800
$800
$480
$10 000
$2 500
$1 000
$500
$2 000
$500
$2 000
$500
$46 600
$6 100
$1491360
Figure 1 below shows artisanal miners on a Shaft on the Claims.Rock samples from this shaft were taken and analysed at the laboratory and the fire
assay results obtained are as shown below.
.
Element
Sample
Fire Assay
Fire Assay
Fire Assay
Fire Assay
Fire Assay
Fire Assay
Gold
Gold
Gold
Gold
Gold
Gold
Au (ppm)
Detection Limit
16.1
0.24
0.34
13.64
11.62
10.08
0.01
0.01
0.01
0.01
0.01
0.01
Figure 1.