0% found this document useful (0 votes)
192 views5 pages

Daily Report

Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
192 views5 pages

Daily Report

Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report Daily Report
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

DAILY REPORT

STUDENT: Asetre, Dwight Christian F.


COMPANY: Asia Brewery Incorporated
DEPARTMENT: Carbonated Soft Drinks (CSD)

DAY

DATE

DAILY TASK

NO. OF
WORKING
HOURS

Monday

18-Apr-16

Tuesday

19-Apr-16

Wednesday

20-Apr-16

Thursday

21-Apr-16

Friday

22-Apr-16

Introduction: about ASIA Brewery


Inc. (history,departments), mission
and vision, safety, rules and
regulations, department assigned:
CSD(Carbonated Soft Drinks)
Meet with the Department Head
(Engr. Nane Remulta), Supervisors
(Engr. Dexter Fernandez & Jan
Ryan Ching) and other employees,
CSD Tour (Cobra Production
Equipments); Lecture on Cobra
Production (Line 3); Fabrication
Works Familiarization
Bottled Water Department Tour
(Line 4); Project Management
Planning (Pipe/Equipment
installation plan) by Engr. Nane
Remulta; Plastic bottle production
using: Resin/Pre-formed bottles, and
Lecture on Bottled Water production
Stick/SMAW welding (proper
welding positions); Project Request
(PR) forms familiarization &
Material Acquisition; Grinder
Repair (by Sir Jan Ryan Ching)
Operation/ Project Approval:
Department Head Signatures;
Basic AutoCAD 2011 tutorial;
Familiarization of ABI future
projects, and Acetylene Cutting
Observation

DAY

DATE

DAILY TASK

NO. OF
WORKING
HOURS

Monday

25-Apr-16

Tuesday

26-Apr-16

Wednesday

27-Apr-16

Thursday

28-Apr-16

Friday

29-Apr-16

DAY

DATE

Project Visit (Utilities 2), and


Material Acquisition (flexible
grinding disc)
Familiarizing Pipe Standards;
Utilities 2 Project Visit and
Observation;
Plant Refrigeration Lectures
( Ammonia, Glycol, CO2 Storage);
Discussion on types of valves
(Check, ball, butterfly)
Research of standard: flanges and
symbols; Work Approval
Processing; Material Acquisition
Platform construction (Utilities 2
CO2 Storage); AutoCAD drawing
(Platform); Material Acquisition
Measuring actual dimensions of
platform (Utilities 2); Continuation
AutoCAD drawing (platform)

DAILY TASK

NO. OF
WORKING
HOURS

Monday

02-May-16

Tuesday

03-May-16

Wednesday

04-May-16

Thursday

05-May-16

Watching Air vent installation @


Soft H2O discharge; Continuation
of AutoCAD design of the platform
Lectures on Pipe & Flanges
Specifications; Lay outing
(Reducer)
AutoCAD
Tutorial (How to get pipe suction
and & discharge diameter); Lecture
about the steam pipes (slope, steam
trap, drip leg, thermal expansion on
pipes, rollers); Research pump

8
8

Friday

06-May-16

DAY

DATE

formula
Control room U2 (Utilities 2) visit;
Processing of work permit for
leaking piping (CSD)

DAILY TASK

NO. OF
WORKING

Monday

09-May-16

Tuesday

10-May-16

Wednesday

11-May-16

Thursday

12-May-16

Friday

13-May-16

DAY

DATE

HOLIDAY
Lay out ( Square to Round);
Processing Work permit for
installation of Reverse Osmosis
(R.O)
Material Acquisition for R.O (Dn
50 stainless pipes, Pneumatic
Valve)
Processing Work Permit for
installation of water level gauge &
spray ball (Bottled Water
Department Product Storage Tank)
Lay outing; Processing work permit
for installation of exhaust fan
(Bottled Water Department)

DAILY TASK

HOURS
8
8

NO. OF
WORKING
HOURS

Monday

16-May-16

Tuesday

17-May-16

Wednesday

18-May-16

Thursday

19-May-16

Installation of level gauge & spray


ball (Bottled Water Department
Product Storage Tank)
Continuation of the installation of
level gauge & spray ball (Bottled
Water Department Product Storage
Tank)
Continuation of the installation of
level gauge & spray ball (Bottled
Water Department Product Storage
Tank)
Installation of exhaust fan

Friday

20-May-16

Fabrication Works Aide

DAY

DATE

DAILY TASK

NO. OF
WORKING
HOURS

Monday

23-May-16

Tuesday

24-May-16

Wednesday

25-May-16

Thursday

26-May-16

Friday

27-May-16

Monday

30-May-16

Processing Work Permit (Installation


of Pipe for Recovery line, Filler
No.5 & 6 Bottled Water
Department); Observing (Welding
CO2 filter leaking); CO2 Filter
repair, Material Acquisition (10
pieces Dn 50 Stainless Steel Pipe)
AutoCAD; Installation of Pipe for
Recovery line, Filler No.5 & 6 Aide;
Material Acquisition (17 pieces Dn
50 Stainless Steel Pipe)
Installation of Pipe for Recovery
line, Filler No.5 & 6 continuation
Installation of Pipe for Recovery
line, Filler No.5 & 6 continuation;
Cutting Pipes Dn 50 (5 in.) for pipe
recovery line
Utilities 2 visit; Inserting drain valve
for CO2 Storage
Welding of scrap box: Storage tank
calculations/computations;
Discussion on thermal expansion on
steam pipelines; Roller and saddle
application on steam pipeline; Metal
standards

8
8

TOTAL NO. OF HOURS: 240