PetrochemicalSpecialEconomicZoneProjects
OlefinNo.6
Implementedby:AmirKabirPetrochemicalCompany(publicjointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):55
Ownership:NPC56%,MinistryorPetroleumsPensionFund15%,Social
SecurityOrganization20%,
NationalPensionFund4%,otherinvestors5%
Startdate:1998
Projectedproductiondate:2004
Productslate '000t/y
Product
Intermediate Final
Ethylene
520
70
Propylene
*
158
Butene1
20
*
HDPE
*
140
LLDPE/HDPE
*
300
LDPE
*
300
PP*
*
158
PyrolysisGasoline
*
137
Butadiene
*
51
FuelOil
*
24
*ThePPplanthasbeensoldtolocalprivatecompanyNavidZarChimie.
2005/6/11 IranianPresidentKhatamiinauguratedOlefin6
NPCNewsBulletinApr.2003
AmirKabir(OlefinNo.6)startsupHDPEplant
http://www.nipc.net/npcnews/news38/projects.htm
NPCsubsidiaryAmirKabirPetrochemicalCompanyhassuccessfullycommissionedits
140,000t/yhighdensitypolyethylene(hdPE)plant.Precommissioningactivitiesstartedin
October2002.In22February2003,theplantstartedtestproductionandhasproducedover
3,500tonnesofhdPE.Theplant'soutputhasalreadyfounditswaytothedomesticmarket.

TheunitisthefirstfacilityinAmirKabir'solefincomplextostartup.The520,000t/y
crackerplantisthenextunittostartuplaterin2003.
SituatedinthePetrochemicalSpecialEconomicZone,thefacilityisslatedtoproduce
160,000t/yofpolypropylene(PP),300,000t/yoflinearlowdensitypolyethylene(lldPE),
20,000t/yofbutene1,158,000t/yofpropylene(PP),137,000t/yofpyrolysisgasoline,
51,000t/yofbutadieneand24,000t/yoffueloil.
Theplannedethyleneplantandotherderivativeswillstartupinstages.ThePPplanthas
beensoldtolocalprivatecompanyNavidZarChimie.
Itsrequiredfeedstockincludeethane,butane,LPG,raffinate,C5cut,lightendsandbutene
1.TheywillbesuppliedbythenearbyBandarimamandBualiSinafacilities.Whenfully
operational,AmirKabirwillberunamanpowerof577.
NPCNewsBulletinJuneJuly2004(No.52)
AmirKabirselectsBasellprocessatLDPE
http://www.nipc.net/npcnews/news52/projects.htm
TheNPCsubsidiaryAmirKabirPetrochemicalCo.(AKPC)hassignedalicensing
agreementtouseBasell'sLupotechTprocessforits300,000tonne/yearlowdensity
polyethylene(ldPE)plantinPetrochemicalSpecialEconomicZoneinBandarImam,
southwestofIran.AKPCisresponsibleforimplementingandoperatingNPC'sOlefin
No.6project.AKPCbroughta140,000tonne/yearhighdensitypolyethylene(hdPE)
plantonstreamlastyear.Thecompanyisbuildinga520,000tonne/yearethyleneplant,
a51,000tonne/yearbutadieneunit,a20,000tonne/yearbutene1unit.Itwillalso
produce158,000tonne/yearofpropyleneand300,000tonne/yearoflinearlowdensity
polyethylene(lldPE)/highdensitypolyethylene(hdPE).
Platts2005/1/10
SKorea'sDaelimtobuildIranianLDPEplantbylate2007
SouthKorea'sDaelimIndustrialCorphasclinchedaWon107.6bil
($102.2mil)contracttobuilda300,000mt/yrlowdensitypolyethylene
plantforIran'sAmirKabirPetrochemicalCo,Daelimsaidinastatement.
AmirKabirisasubsidiaryofIran'sNationalPetrochemicalCo.Daelim
IndustrialwilljoinhandswithBritain'sSembCorpSimonCarvesin
buildingthefactoryonaturnkeybasistobebuiltatIran's6thOlefin
petrochemicalcomplexinBandarImam,itsaid.Theplant'sconstruction
wouldbeginearlythisyear,anditscompletionscheduledforlate2007.
NPCNewsBulletinAugSept.2005No.66
AmirKabirlldPEup&running
AmirKabirPetrochemicalCo.(AKPC),asubsidiaryofNPC,hasbroughtonstreamits
300,000tonne/yearlinearlowdensitypolyethylene(lldPE)plantatPetrochemical

SpecialEconomicZoneinBandarImam.Innovene,thesubsidiaryofBP'solefinsand
derivativesbusinesses,isthetechnologylicensorforthefacility.Engineering
contractorsareTechnipofFranceandEnerchimiofIran.AKPChadbroughtits
520,000tonne/yearcrackeronstreambackinMay2005.Its51,000tonne/year
butadieneextractionunitisalsoinproduction.Otherderivativeunitswhichare
alreadyinoperationincludea140,000tonne/yearhighdensitypolyethylene(hdPE)
unitanda20,000tonne/yearbutene1unit.AKPCalsohasa300,000tonne/yearlow
densitypolyethylene(ldPE)projectatthesamesitewhoseproject'sengineeringdesign
isunderway.ThecontractfortheprojectwasawardedtoaconsortiumofDaelimof
SouthKorea,SembCorpSimonCarvesofUKandNamvaranofIran.AKPCis56%
ownedbyNPC,15%bythePetroleumMinistryPension&WelfareFund,20%bythe
SocialSecurityInvestmentCo.and9%byothers.
2004122


SembCorp SimonCarves
4,500

Amir Kabir
DaelimIndustrial
Namvaran
30
Pars

25
2007
NPCNewsBulletinNov.2004No.57
AmirKabir'sB1kicksoffproduction
TheAmirKabirPetrochemicalCompany'sbutene1planthasbeenbroughtonstreamand
hasstartedproduction.Theplanthasanannualcapacityof20,000tonnes.Its
precommissioningandcommissioningactivitieswerecompletedbySeptember2004.Work
isalreadyunderwaytostabilizetheplant'soperationalconditions.AmirKabirwillalso
produce520,000tonne/yearofethylene,300,000tonne/yearoflowdensitypolyethylene
(ldPE),51,000tonne/yearofbutadiene,158,000tonne/yearofpropylene,300,000
tonne/yearofhighdensitypolyethylene(hdPE)/linearlowdensitypolyethylene(lldPE)and
137,000tonne/yearofpyrolysisgasoline.Amirkabir's140,000tonne/yearHDPEplantis
alreadyonstream.

EngineeringPolymers
Implementedby:KhuzestanPetrochemicalCompany(publicJointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):10hectares
Ownership:100%NPC
Startdate:1998
Projectedproductiondate:2003
ProductSlate'000t/y
Product'sName
Final
PolycarbonateepoxyResin 25
LiquidEpoxyResin
5
SolidEpoxyResin
5

NPCNewsBulletinApr.2003
NPC'sengineeringpolymersfacilityisforgingaheadwithitsimplementationactivities
expectingtostartupinthethirdquarterof2003.Thefacilityisbeingimplementedby
KhuzestanPetrochemicalCo.(KZPC)anNPCsubsidiary.
TheprojectisbeingdevelopedinPetrochemicalSpecialEconomicZoneinanareaof10
hectares.ItiswhollyownedbyNPCandwillproduce25,000t/yofpolycarbonateepoxy
resin,5,000t/yofliquidepoxyresinand5,000t/yofsolidepoxyresin.
GermanengineeringcompanySalzgitterhassuppliedtechnologyandbasicengineeringfor
theplants.NamvaranofIranandNoyvallesinaofItalyaredetailedengineering&
procurementcontractorsfortheproject.Itinvolvesaninvestmentof$198mn.
Theplantwillconsume2.5mm3/yofnaturalgas,29,000t/yofcausticsoda,1,500t/yof
HCL,9,500t/yofchlorine,8,000t/yofacetone,27,000t/yofphenoland5,000t/yof
epichlorohydrin.Acetone,phenolandepichlorohydrinwillbeimportedwhiletheremaining
requiredrawmaterialsaresupplieddomestically.
FiveNPCProjectsofficiallyopenedIran'spetcheminbloomingstage
ThirdAromatics
Implementedby:BoualiSinaPetrochemicalCo.(publicJointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):31
Ownership:100%NPC
Startdate:1999
Projectedproductiondate:2003
Productslate'000t/y
Product
Paraxylene

Final
400

Orthoxylene
Benzene
LPG
Raffinate
Lightends
Heavyends
HeavyAromatics
C5cut
Pyrolysisgasoline(heavyend)

30
179
39
199
350
488
23
21
11

2005/6/11 IranianPresidentKhatamiinaugurated3rdaromatics
Platts2004/3/16
Iran'sNPCtostartupNo3aromaticsprojectbymid2004
Iran'sNationalPetrochemicalCohasscheduledtocommissionitsNo3aromaticcomplexin
BandarImamKhomeinibyJulyatthelatest,andstartcommercialoperationsbyOctober,a
companysourcesaidTuesday.NPChadinitiallyscheduledtostartuptheplantinJanuary
thisyear.
NPCNewsBulletinJanFeb.2005No.6162
NPCstartsPXproductionatAromaticsNo.3
NPChasachievedonspecparaxylene(PX)fromitsAromaticsNo.3projectinBandar
Imam.Thefacilitystartedtoyieldonspecproducton2May2005.Sincethen,ithasbeen
onstreamwithapurityof99.83%.Theproject,whichwasimplementedandisoperatedby
NPC'ssubsidiary,BouAliSinaPetrochemicalCo.hasthecapacitytoproduce400,000
tonne/yearofPX,30,000tonne/yearoforthoxylene,179,000tonne/yearofbenzene.ThePX
outputismeanttofeedtwo350,000tonne/yearpurifiedterephthalicacid(PTA)unitsatthe
samesite.Thefacilityalsoproduces199,000tonne/yearofraffinate,23,000tonne/yearof
heavyaromatics,39,000tonne/yearofLPG,350,000tonne/yearoflightends,488,000
tonne/yearofheavyendsand21,000tonne/yearofC5cutperyear.Itconsumescondensates
aswellaspyrolysisgasolineasitsfeedstockwhicharesuppliedbythenearbyOlefinNo.6.
Thefirstphaseoftheplant,includingtheprefractionationunit,wascompletedandbrought
onstreaminlate2003,andthesecondphasewascompletedinthethirdquarterof2004.
Implementationactivitiesattheplantcommencedinearly2000.Theproject'soutputisused
fortheproductionofPTA,whichisusedasfeedtoproducepolyesterpolymer.Itisalsoused
toproducepharmaceuticals,insecticides,styrenemonomer,ethylbenzene,LAB,phenol
whichisfeedforproducingnylon,solventsandanumberofotherchemicals.
ThirdMethanol
Implementedby:FanavaranPetrochemicalCo(PublicJointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):15

Ownership:100%NPC
Startdate:1999
Projectedproductiondate:2003
ProductSlate '000t/y
Product'sName Final
Methanol
1000
NPC'sthirdmethanolfacility,isunderconstructionatPetrochemicalSpecialEconomicZone
nearMahshahr.Theplant,whichisbeingimplementedbyFanavaranPetrochemicalCo.has
acapacityof1mtonne/year.Itisalready98%completeandisexpectedtocomeonstreamin
early2004.Thecomplexwillconsume610,000tonne/yearofnaturalgasand330,000
tonne/yearofCO2whichwillbesuppliedlocally.
Fanavaranisalsobuildinga150,000tonne/yearaceticacidprojectanda140,000tonne/year
carbonmonoxide(CO)unitdownstreamofthemethanolplant.Bothoftheseplantsare
slatedtocomeonstreambytheendof2004.Aboutthreequartersofthemethanolplant's
capacitywillbeexportedwhile82,000tonne/yearofitsoutputwillfeeditsaceticacidplant.
ItwillalsosupplyBandarImamPetrochemicalComplexwith178,000tonne/yearof
methanol.
FiveNPCProjectsofficiallyopenedIran'spetcheminbloomingstage
methanoltopropylene(MTP)
Implementedby:FanavaranPetrochemicalCo(PublicJointStock)
Location:PetrochemicalSpecialEconomicZone
Ownership:100%NPC
ProductSlate '000t/y
Product'sName
propylene

LPG

gasoline

Final
120
25.2
45.6

NPCNewsBulletinMarchApril2006
WorkcontinuesonNPCsMTPplant
LandpreparationandpilingworkhasbeensteppedupattheNPCsmethanolto
propylene(MTP)pilotplantprojectatthePetrochemicalSpecialEconomicZone,
BandarImam.ThepilotplantisbeingdevelopedjointlybyNPCsresearcharm
PetrochemicalR&TCo.andLurgiofGermany.TheMTPprojectisbasedonLurgis
technology.Meanwhile,FanavaranPetrochemicalCo.,anotherNPCsubsidiary,is
implementingaMTPprojectincommercialscaleforthefirsttimeeverintheworld.
Theplantisslatedtohaveacapacityof100,000tonne/year.Thefeedfortheproject
willbesourcedfromFanavarans1mtonne/yearmethanolplant.TheMTPprocessis
implementedinafixedbedadiabaticreactorsysteminwhichthemethanolis

convertedtopropyleneinthepresenceofsteam.Acontractismadeforthegrantof
licenseandbasicengineeringforthisproject.Basicengineeringwillbecompletedby
theendofJuly06.Preparationsarealreadyunderwaytofloattenderdocumentsfor
anengineering,procurement,constructionandcommissioning(EPCC)contract.Most
oftheworldwidepropyleneproductionisbasedonpetroleum.TheLurgiprocess
obtainspropylenefrommethanolproducedfromnaturalgas.Fanavaranisalso
operatinga140,000tonne/yearCOplant.Besides,itisimplementinga150,000
tonne/yearaceticacidwhichisalreadyincommissioningstage.Avinylacetate
monomer(VAM)plantisalsoplannedtobeconstructedatFanavaran.
Feb.2006NO.69
Fanavarankicksoffimplementationworkatmethanoltopropyleneplant
ImplementationworkhasbeenkickedoffforFanavaranPetrochemicalsmethanolto
propylene(MTP)plant.Theplantisslatedtoproduce120,000tonne/yearofpropylene.
Thecomplexisalsoplannedtoyield25,200tonne/yearofLPGand45,600tonne/year
ofgasoline.
March7,2005Lurgi
PropylenePlantontheBasisofMethanol(MTPR)inIran
LurgiandPetrochemicalResearchandTechnologyCompanyofIranhave
signedacontractwithFanavaranPetrochemicalCompanyforabasic
engineering,thelicenseandthedeliveryofproprietaryequipmentfora
methanoltopropyleneplant.Inasecondstep,thedetailengineeringand
erectionworkswillbetendered.Theplantwithanannualcapacityof
100,000tonsofpropyleneistogoonstreaminearly2009.Theplant
locationwillbetheBandarImamSpecialEconomicPetrochemicalZone.
ThisplantrepresentsthefirstindustrialscaleapplicationofLurgis
proprietaryMTPRprocess.Thematurityofthisprocesswasalready
proveninademonstrationplantbuiltwithStatoilinNorway.Thecontract
securedinIraninvolvestheconstructionofthefirstindustrialscale
propyleneplantonthebasisofmethanol.
VAM
Implementby:FanavaranPetrochemicalCompany(PublicjointStock)
Location:PetrochemicalSpecialEconomicZone
Ownership:100%NPC
ProductSlate'000t/y
Product
Final
VAM 150
JanFeb2001
FanavaranPetrochemicalCo.(FPC),asubsidiaryofNPC,hasfloatedtender

documentsforavinylacetatemonomer(VAM)plant.Thetenderscallforprovisionof
technologylicense,basicanddetailedengineering,andequipment.
FPCwillpickupacontractorbyMarch20,theendofthecurrentIranianyear.
The150,000t/yVAMprojectwillbebuiltina3hectaresareanexttoMethanolNo.3
andaceticacidplantswithinthePetrochemicalSpecialEconomicZone(PETZONE)on
theIraniancoastofthePersianGulf.Itwilluseaceticacid,ethyleneandoxygenasits
feedthatwillbesuppliedbytheneighboringplants.
AceticAcid&CO
Implementby:FanavaranPetrochemicalCompany(PublicjointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):3(CO)&4(AceticAcid)
Ownership:NPC(50%),SocialSecurityOrganization(17%),Retirement
Organization(18%),PetroleumMinistryRetirement&WelfareFund(15%)
Startdate:2001
Projectedproductiondate:2004
ProductSlate'000t/y
Product
Intermediate Final
CarbonMonoxide(CO)
140 58
AceticAcid
150

NPCNewsBulletinJuly2005No.65
FanavarancommissionsitsCOplant
FanavaranPetrochemicalCo.commissionsitscarbonmonoxide(CO)plantatthe
PetrochemicalSpecialEconomicZone(Petzone)inBandarImam,onthenorthern
coastofthePersianGulf.Theplanthasanoutputcapacityof140,000tonne/year.The
lion'sshareoftheplant'soutputwillbeearmarkedfortheproductionof150,000
tonne/yearaceticacidfacilityatthesamesiteinPetzone.Fanavaranalreadyhasa1m
tonne/yearmethanolplantinoperation.Fanavaran'sstakeholdersincludeNPC(50%),
SocialSecurityOrganization(17%),theNationalPensionFund(18%)andPetroleum
MinistryPensionandWelfareFund(15%).
Feb.2006NO.69
FanavaranaceticacidplantincommissioningstageProductionexpectedsoon
WorkisinprogressonNPCs150,000tonne/yearaceticacidplantinPetrochemical
SpecialEconomicZoneinBandarImam.Theplantisalreadyincommissioningstage
andisexpectedtostartproductionbyApril2006.Theplantsoutputwillfeedavinyl
acetatemonomer(VAM)whichisbeingconstructedatthesamesiteandtwoPTA
plantsatthenearbyShahidTondguyanPetrochemicalCo.site.Besidestheaceticacid
plant,NPCsubsidiaryFanavaranPetrochemicalCo.isimplementingacarbon

monoxide(CO)plant,amethanoltopropylene(MTP)facilityandaVAMplant.The
COunitisalreadyonstreamyieldingCOatapurityof99.8%Itisalsooperatinga1m
tonne/yearmethanolplantwhichislocatedatthesamesitewithanareaof25hectares.
TheaceticacidplantisbasedontheUkrainianKimtechnologiyatechnology.
GermanysSalzgiterisprovidingthelicenseandisalsotheplantsbasicengineering
contractor.Detailedengineeringandsupplyofequipmentisdonebyaconsortiumof
LGofKoreaandOIECofIran.Iraniancontractorsareresponsibleforindustrialcivil,
erectionandprecommissioningwork.

2ndPTA/PET
Implementedby:ShahidTondgooyanPetrochemicalCo.(PublicJointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):18
Ownership:NPC(85%),PetrolumeMinistryRetirement&WelfareFund(15%)
Startdate:2000
Projectedproductiondate:2008
Productslate '000t/y
Product
Intermediate Final
PTA
350
10
PET(FiberGrade)

132
PET(BottleGrade)

132
PetPoy

132

Feb.2006NO.69
ShahidTondgouyanstartsupitsNo2PTAproject
ShahidTondguyanPetrochemicalCo.(STPC)hasstartedupitssecondpurified
terephthalicacid(PTA)project.The350,000tonne/yearPTAplantislocatedatthe
PetrochemicalSpecialEconomicZone,BandarImam,onthenortherncoastofthe
PersianGulf.DownstreamofthisPTAplantisa400,000tonne/yearpolyethylene
terephthalate(PET)facility.ThePETplantisalready91%complete.Erectionworkis

beingcarriedoutattheplantintandemwiththeprecommissioningactivity.STPC
expectstobringonstreamconsecutivelytheplantsthreebottleandfibergradelines
frommid2006.TheoverallprogressattheNo2PTA/PETplantisover95.2%anditis
anticipatedtobefullyoperationalbyQ4of2006.BeforethePETplantiscompleted,
STPCwillexportoutputfromthePTAplant.ShahidTondgouyanoperatesanother
350,000tonne/yearPTAplantatsiteNo1,whichcameonstreaminMaylastyear.
Whenfullyonstream,STPCwillproduce800,000tonne/yearofPET.
1stPTA/PET
Implementedby:ShahidTondgooyanPetrochemicalCo.(PublicJointStock)
Location:PetrochemicalSpecialEconomicZone
Ownership:NPC85%,MinistryofPetroleumsPensionFund15%
Pproductiondate:Q22004
Productslate '000t/y
Product
capacity
PTA
350
PET(FiberGrade)
235
PET(BottleGrade)
177
2005/6/11 IranianPresidentSeyyedMohammadKhatami
inaugurated PTAproject
NPCNewsBulletin2004/JanFeb
ShahidTondguyantobringonstreamPET/PTA1inQ2'04
http://www.nipc.net/npcnews/news4748/projects.htm
ShahidTondguyanPetrochemicalCompany(STPC),anNPCsubsidiary,isplanningto
bringonstreamitsNo.1polyethyleneterephthalate(PET)andpurifiedterephthalic
acid(PTA)plantsinthesecondquarterof2004.Thetwoplantswillbecommissioned
inthefirstquarterof2004.
ThePET1projecthasacapacityof412,000tonne/year,consistingofa235,000
tonne/yearoffibergradelineanda177,000tonne/yearofbottlegradeline.ThePTA1
facilityhasanannualoutputof350,000tonnes.TheintegratedNo.1PET/PTAproject
issituatedinPetrochemicalSpecialEconomicZone.
STPCplanstocommissionitssecondPET/PTAcomplexinQ4of2004withstartup
plannedforQ1of2005.ThePET/PTA2isalready69%complete.
ItwillconsistofaPTAunitwithacapacityof350,000tonne/yearandthreelinesof
PETwithacombinedoutputcapacityof396,000tonne/yearconsistingofabottlegrade
line,afibergradelineandapartiallyorientedpolyesteryarn(POY)line.
Paraxylene(PX)feedstockwillbesourcedfromtheNPC'ssubsidiaries,BandarImam
andBoualiSinacompanies,whileethyleneglycol(EG)willcomefromArak
Petrochemicalandpartlyfromabroad.WhenOlefinNo.7orMarunPetrochemical
Co.iscompleted,itwillsupplyalltherequiredEG.Aceticacidwillbesuppliedby
Fanavarancompany,anotherNPCsubsidiary.

NPCNewsBulletinAugSept.2005No.66
2ndlineofShahidTondguyanPETplantonstream
NPChasbroughtonstreamthesecondlineofitsfirstpolyethyleneterephthalate(PET
1)plantwhichislocatedatthePetrochemicalSpecialEconomicZone.The117,000
tonne/yearfibregradePETisinproductionlinewithautilizationrateof70%and
highqualityproduct.NPCsubsidiary,ShahidTondguyanPetrochemicalCo.(STPC),
operatesthefacility.ThePET1plantconsistsoffourPETlines.STPCbrought
onstreamthefirstlineofitsPETplantearlierin2005.Itproduces60,000tonne/year
PETbottlegradechips.Theremainingtwolinesarealreadyinprecommissioning
stage.Overall,STPCfirstPTA/PETplantwillproduce237,000tonne/yearoffiber
gradePET,177,000tonne/yearofbottlegradePETand350,000tonne/yearofpurified
terephthalicacid(PTA).STPC'ssecondPTA/PETfacilitywillconsistof350,000
tonne/yearofPTA,132,000tonne/yearoffibergradePET,132,000tonne/yearofbottle
gradePET,66,000tonne/yearofpartiallyorientedyarnsorPOYand66,000tonne/year
ofstaple.
OlefinNo.7
Implementedby:MarunPetrochemicalCompany(publicJointStock)
SABICJV pending
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):102.5hectares(93hectaresinpetrochemicalspecial
Economiczone
9.5hectaresinAhwaz)
Ownership:80:20jointventurebetweenNPCandtheOilPensionFund
LDPEajointventurebetweensabicEuroPetrochemicals
B.V(30%),pooshinehBaft(25%)
andNPC(45%)
Startdate:2000
ProjectedProductiondate:2004
Productslate '000t/y
Product
Intermediate Final
Ethylene
1,100
216
Propylene
200

HDPE

300
LDPE

300
Polypropylene

300
PyrolysisGasoline

83
EthyleneGlycols*

443
*400,000tonne/yearofmonoethyleneglycol(MEG),
40,000tonne/yearofdiethyleneglycol(DEG)and
2,800tonne/yearoftriethyleneglycol(TEG).

NPCNewsBulletinJuly2005No.65
HDPEcrackerplantsofOlefinNo.7prepareforcommissioning
NPCexpectstostartupthehighdensitypolyethylene(hdPE)plantofitsOlefinNo.7
byOctober2005.Theprecommissioningworkontheplantisalready80%complete.
MajorpiecesofequipmentofthehdPEplanthavebeenerected.Theethylenefeedfor
theprecommissioningstagewillbesourcedfromBandarImamandAmirKabir
complexes.Meanwhile,precommissioningactivityonthefacility's1.1mtonne/year
crackerisalready65%finishedanditisexpectedtobecommissionedbyNovember
2005.Theplant'smaincompressorand6ofitsfurnaceshavebeencommissioned.The
remainingtwofurnaceswillbeoperationalbytheendofAugust.Constructionand
erectionworkis94%completeatthepolypropyleneplant.Itisslatedtobe
commissionedbyDecember2005.
FacilitiesdownstreamofOlefinsNo.7includea300,000tonne/yearhighdensity
polyethylene(hdPE)unit,a300,000tonne/yearpolypropylene(PP)unitandan
ethyleneglycol/ethyleneoxide(EG/EO)unitthatwouldproduce50,000tonne/yearof
ethyleneoxide(EO)and443,000tonne/yearofethyleneglycol(EG).Itwillalsoproduce
200,000tonne/yearofpropyleneand83,000tonne/yearofpyrolysisgasoline.Marun
PetrochemicalCo.,an80:20jointventurebetweenNPCandOilMinistryPension
Fund,ishandlingtheOlefinNo.7project.
NPCNewsBulletinAugSept.2005No.66
Marun'scracker,hdPEpickupsteamforproduction
The1.1mtonne/yearOlefinsNo.7crackeranditsderivativehighdensitypolyethylene
(hdPE)unitareonthevergeofcomingonstream.Allthecompressorandfurnacesat
thecrackercomplexarereadyforoperationandflareswillcomeosntreamwithindays.
Currently,75%ofprecommissioningworkhasbeencompleted.Marun'sethane
recoveryplantisalreadyintrialrunwiththenaturalgasitproducesbeinginjected
intothenationalgasgrid.ThecrackerisexpectedtostartproductioninDecember.The
ethanerecoveryplant,locatednearthecityofAhwaz,theprovincialcapitalof
Khuzestanprovince,produces1.9mtonne/yearofethanewhichwillbepipedtocracker
plantinthePetrochemicalSpecialEconomicZone.Inthemeantime,commissioning
workisgainingmomentumatthefacility's300,000tonne/yearhdPEplant.Theplant's
baggingsystemandthegranulationunithavebeensuccessfullytested.Therequired
hdPEproductfortrialtestwassuppliedfromanotherNPCsubsidiaryBandarImam
PetrochemicalCo.Some250tonnesofhdPEwasusedforthetest.Otherfacilities
downstreamofOlefinsNo.7area300,000tonne/yearpolypropyleneunitandan
ethyleneglycol/ethyleneoxide(EG/EO)unitthatwillproduce443,000tonne/yearof
EGs.MarunPetrochemical,an80:20jointventurebetweenNPCandtheOilPension
FundishandlingtheOlefinsNo.7project.
Feb.2006NO.69
MarunshdPEplantonstream
NPCsubsidiaryMarunPetrochemicalhasstartedupproductionatits300,000
tonne/yearhighdensitypolyethylene(hdPE)plantatPetrochemicalSpecialEconomic

ZoneinBandarImam.Marunhadearlierbroughtonstreamits1.9mtonne/yearC2+
recoveryplantwhichissituatedinthecityofAhwaz.Theplantsethylenefeedstockis
currentlysuppliedbyAmirKabirandBandarImamcomplexes.Theplantwillbefed
byMarunsownethyleneunitwhenitiscompleted.TheextruderofMaruns
polypropylene(PP)planthasbeenstartedup.ThePPplantisexpectedtobebrought
onstreamsoon.Marunsethyleneglycols(EGs)plantisalsoreadyforstartup.The
plantwillstartreceivingfeedassoonasrequiredguaranteesareissuedbythevendor.
MarunPetrochemicalCo.isan80:20jointventurebetweenNPCandtheOilPension
FundInvestmentCo.Whenfullyfunctional,itwillproduce1.81mtonnesofsaleable
productsincluding516,000tonne/yearofethylene,300,000tonne/yearofhighdensity
polyethylene,300,000tonne/yearofpolypropylene,83,000tonne/yearofpyrolysis
gasoline,443,000tonne/yearofethyleneglycolsand168,000tonne/yearofC3+cuts.
March25,2004IranMania
Iran,Saudijointventuretoboostexports
http://www.iranmania.com/News/ArticleView/Default.asp?
NewsCode=23607&NewsKind=BusinessEconomy
IranandSaudiArabiaestablisheda5050jointventurecompanytoexportIranian
petrochemicalsinordertoboostthecountrysmarketshareintheworld,aninformedsource
withthestateownedNationalIranianPetrochemicalCo(NIPC)saidhereTuesday.
SaudiArabiasleadingglobalpetrochemicalcompany,SaudiBasicIndustriesCorporation
(SABIC)hasagreedtocooperatewithIranformarketingandsellingIranspetrochemical
products,especiallyMarunPetrochemicalCompany(MPC)polymerproducts,bothin
domesticandinternationalmarkets,hesaid.
ThejointinvestmentaimstoselloneofMPCspolymerproducingunits,whichistocome
onstreamlateinthenextIraniancalendaryearof1384(endingMarch21,2006),thesource
said.
StaterunMPC,anNIPCsubsidiaryLocatedinBandarImamPortsouthernIran,istosupply
theJVwithits50percentofpolymerproductswhiletherestissettomeetdomesticneeds,
headded.
Iranhaswidelyscheduledtoboostitspetrochemicalproducingcapabilitiesandthecountrys
exportcapacityisestimatedtoincreaserapidly,thesourcesaid,addingthatthejoint
investment,regardingSABICsvaluableexperienceswouldplayasignificantrolein
maintainingthetwosidescustomers.
SABIC,establishedbyaRoyaldecreein1976,isamongtheleadingglobalpetrochemical
companiesintermsofsalesandproductdiversity.HeadquarteredinRiyadh,itisalsothe
MiddleEast'slargestnonoilindustrialcompany.
Sell2Arabia2004/7/29
SaudiArabia&IrantofinalisePetrochemicaljointventure
http://www.sell2arabia.com/NewsDetail.asp?NewsId=1281

TheSaudiArabianBasicIndustriesCorporation(SABIC)andIran'sMarunPetrochemical
Companyareexpectedtofinaliseajointventureagreementwithinthenexttwomonths.This
isthefirstjointventurebetweenSABICandtheIraniancompany,thetwopetrochemical
giantsintheregion.SABICisworldplayerinthepetrochemicalsectorandIranis
endeavouringtoraiseitsproductionmanifoldstoexploitthenaturalrichesoftheregion.
Afterfinalisation,SABICwouldown50percentoftheseventholefinproject,currently
underconstructionandwillalsoundertakehalfofthetotalcostoftheproject,whichis
expectedtoproduce1.1milliontonnesofethyleneasintermediateproduct,aswellas1.35
milliontonnesofpolymers.Theprojecthasbeenreportedas90.46percentcompletebythe
endoffirstquarterofthecurrentIraniancalendaryear.ThisunitwillincreasetheIranian
annualolefinproductionbyfourpercenttosixpercent.InMarch2004,itwasmadeknown
thatSABIChasagreedtocooperatewithIranformarketingandsellingIran'spetrochemical
products,especiallyfromMarun,bothinthedomesticandinternationalmarkets.
Platts 2004/10/21
SABICIrancracker,integratedcomplexjointventureplanstalls
TheproposedjointventurebetweenSaudiArabiaBasicIndustriesCorpandIran'sNational
PetrochemicalCo,whereSABICwastotakea50%stakeinNPC'ssubsidiaryMaroun
PetrochemicalCo,hasreachedanimpasse,confirmedSABIC'sViceChairmanandCEO,
MohamedAlMady,Wednesday.
InIran,SABICwasassessingthreetofourpotentialJVatonego,asthecompanywasnot
abletoironoutseveralissueswithNPC,itdecidedtoputtalksonhold.
FajrCentralizedUtilityPlant
Implementedby:FajrPetrochemicalCo.(privateJointStock)
Location:PetrochemicalSpecialEconomicZone
Area(Hectares):30
Ownership:100%NPC
Startingdate:1999
Anticipatedproductiondate:2003
Productslate
Product

Electricity
Steam
ROWater
DMWater
ServiceWater
PortableWater
ServiceAir

InstrumentAir
Nitrogen
Oxygen

Final
585MW
860t/h
4680m3/h
980m3/h
400m3/h
250m3/h
16500Normalm3/h
15000Normalm3/h
18000Normalm3/h
19000Normalm3/h

FiveNPCProjectsofficiallyopenedIran'spetcheminbloomingstage

2008/10/24
Iran'sNIPCandGermanUhdeGmbHinkpetrochemagreement
NationalIranianPetrochemicalCompany(NIPC)andGermany'sUhdeGmbHhave
inkedapetrochemdealfordehydrogenatedpropaneplantwithcapacitytoproduce
350,000tons.TheplantistobelocatedinImamKhomeiniPortinIran'sKhuzestan
province.Thetotalvalueofthecontractis25millioneurosanditwilltake42months
tobecompleted.TheplantwillsecurefeedstockpropanefromImamKhomeini
PetrochemicalComplex.
RejalPetrochemicalCompany
KhuzestanprovincialcityofMahshahr(BandarImamSpecial
EconomicalZone)
PP 90,000 160,000
methanoltoolefins
November26,2006IslamicRepublicNewsAgency
Firstprivatepetrochemicalcomplexduetocomeonstream
Thefirstprivatepetrochemicalunitinthecountryisduetocomeonstreamin
KhuzestanprovincialcityofMahshahr(BandarImamSpecialEconomicalZone),head
ofboardofdirectorsinRejalPetrochemicalCompanytoldreportershereonSaturday.
AliMohammadRejalisaidinthefirstphaseofthecomplextobeinauguratednext
weekconcurrentwiththeauspiciousbirthanniversaryofImamReza(A.S.),90,000
tonsofpolypropyleneistobeproduced.
HeaddedthatIsfahaniinvestorshaveexpendedanamountofrls950billionforthe
complexanditsdevelopmentplansofar.
Hestatedduringthefirststageofthecomplexdevelopmentplan,theproductionrateis
expectedtoreach160,000tons.Itisalsoscheduledtoproducepropylenegasfromthe
natural"methanol"gasutilizingamoderntechnologyinthenextsteps.
ParsSpecialEconomic/EnergyZone
Ehtanerecoveryandstyrenemonomerplants
Implementedby:ParsPetrochemicalCompany(PrivateJointStock)
Location:ParsSpecialeconomic/EnergyZone
Area(Hectares):20.2

Ownership:100%NPC
Startdate:2000
Projectedproductiondate:20045
Productslate '000t/y
Product'sName Final
Ethane
1,600
ethylbenzene
645
Styrene
600
PS
250
GP100HI100
EPS50
Benzene
6
Toluene
14
Propane
980
Buthane
570
MixedC5+
86
NPCAug.2004(No.54)
ParsexpectedtobecompletedbyQ1'06
http://www.nipc.net/npcnews/news54/projects.htm
ParsPetrochemicalComplexisexpectedtobecompletedbyMarch2006.Thecomplexis
beingdevelopedbytheNPCsubsidiary,ParsPetrochemicalCo.,atParsSpecial
Economic/EnergyZoneinAssaluyeh,southofIran.ThefacilityconsistsofaC2+recovery
andfractionationplant,a645,000tonne/yearethylbenzeneunit,a600,000tonne/year
styrenemonomerplantanda250,000tonne/yearpolystyreneunit.Parswillalsoproduce
1.6mtonne/yearofethane,980,000tonne/yearofpropane,570,000tonne/yearofbutane,
86,000tonne/yearofmixedC5+,14,000tonne/yearoftolueneand6,000tonne/yearof
benzene.Itwillconsume19,782,000tonne/yearofnaturalgaswhichwillbesourcedfrom
theSouthParsgasfield,470,000tonne/yearofbenzenesuppliedbyBorzuyehandBuali
Sinacompaniesand175,000tonne/yearofethylenesuppliedbythenearbyAryaSasol
PetrochemicalCo.
Feb.2006NO.69
AssaluyehC2+recoveryonstream
NPChasbroughtonstreamitsC2+atthePetrochemicalSpecialEconomic
EnergyZone,Assaluyeh.Theplantwasimplementedandisoperatedby
ParsPetrochemicalCo.Itproduces1.6mtonne/yearofethane,980,000
tonne/yearofpropane,570,000tonne/yearofbutaneand86,000tonne/year
ofpentaneplus.
WorkisprogressingatfullspeedonAryaSasolpolymerproject,alsoknownas9tholefin
plant,intheParsSpecialEconomic/EnergyZoneinAssaluyeh,southofIran.Theprojectis
beingconstructedandwillbeoperatedbyAryaSasolPolymerCo.,a50:50jointventure

betweenNPCandSasol.Thefacilitywillproduce1,000,000tonne/yearofethyleneofwhich
600,000willbeforcaptiveuseandtheremaining400,000willbefinalproduct300,000
tonne/yearofmediumdensity/highdensitypolyethylene(mdPE/hdPE)300,000tonne/year
oflowdensitypolyethylene(ldPE),and90,000tonne/yearofC3andabove.Itwilluse
1.267mtonne/yearofethaneasfeedwhichwillbesourcedbytheneighboringPars
PetrochemicalCo.AryaSasol'sethyleneplantwillprovidefeedforthedownstreamplastic
andstyreneunits.Thesurplusethylenewillbeearmarkedforexport.Theplant'sbasicand
detailedengineeringworkaswellasequipmentandmaterialdeliveryhavebeencompleted.
Constructionworkisalready75%complete.IntheldPEunit,processdesignhasbeen
completedandpackageisdelivered.Basicengineeringhasalsofinished.Detailed
engineeringandprocurementworkis82%complete.Materialdeliveryisinprogresswhile
civilconstructionhasalreadybegun.TheprocessdesignforthemdPE/hdPEplanthasbeen
completedandtherespectivepackageisdelivered.Theplant'sdetailedengineeringworkand
procurementservicesare81%complete.Civilconstructionactivitieshavestartedatthesite.
Theengineeringworkfortheoffsiteprojectisalmostfinished.Theplantwillsupplyutilities
totheethylenecracker,mdPE/hdPE,ldPEofAryaSasolandethylebenzeneandstyrene
monomerofParsPetrochemicalCo.Procurementserviceshaveregistered91%progress.
Materialdeliveryisinprogressandcivilconstructionworkhasalreadystarted.
EB
NPCawardedDaelimofKoreaandChagaleshofIranthecontracttobuildanethylbenzene
(EB)plantinAssaluyeh,southofIranforitssubsidiaryParsPetrochemicalCompany.
The645,000tonne/yearcapacityplantisscheduledtobecompletedin23months.Itwill
consume175,000tonne/yearofethylenewhichwillbesuppliedbyNo.9olefinsprojectand
470,000tonne/yearofbenzenefromthenearbyNPC'sNo4aromaticsproject.
UtilitiesfortheEBplantwillbeprovidedbyMobinPetrochemicalCo.
NPCAug.2004(No.54)
NPCbreaksgroundonethylbenzeneproject
http://www.nipc.net/npcnews/news54/projects.htm
Implementationworkhasofficiallybegunfortheconstructionoftheethyl
benzeneplantoftheNPCsubsidiaryParsPetrochemicalCo.(PPC)inPars
SpecialEconomic/EnergyZone.
PPCbrokegroundontheprojectinaceremonyattendedbytheNPCPresident,
M.R.Nematzadeh,Mr.BaekKimoon,theAmbassadoroftheRepublicof
KoreatoTehranandYongKooLee,PresidentandCEOofDaelimIndustrial
Co.
TheplantislicensedbyPolimeriEuropaofItaly.Ithasacapacityof645,000
tonne/year.Theengineering,procurement,constructionandcommissioning
activitiesarebeingdoneintheframeworkofanEPCCcontractthatPPC
awardedtotheconsortiumofChagaleshConsultingEngineersofIranand
DaelimIndustrialCompanyoftheRepublicofKorea.Thecontractwassigned
onMay20,2003.AnEarlyWorkAgreementwascreatedonJune23,2003with
thecontractorstohelptheprojectgoforwardforaperiodofsixmonths.This
agreemententeredforceonAugust4,2003underwhichearlyworkactivities
werekickedoff.ThemainfinancingarrangementbecameeffectiveonJuly21,
2004.Thecontractualcompletionperiodis20monthsfromtheeffectivedate.

NPCNewsBulletinDec.2004No.58
NPCpickscontractorforitsParsPSplant
TheNationalPetrochemicalCompany(NPC)hasawardedthecontractforthe
polystyreneprojectofitssubsidiary,ParsPetrochemicalCompany(PPC)to
SembCorpSimonCarvesofUKand(EIED)ofIran.Thecontractcallsfor
provisionoflicense,basicanddetailedengineering,procurementandsupplyof
equipment,erection,construction,precommissioning,commissioning,startup
andperformancetests.TheplantwillbebuiltinParsSpecialEconomic/Energy
Zone,onthenortherncoastofthePersianGulf.Itwillproduce250,000
tonne/yearofpolystyrene.Theplant,oneofthelargestintheworld,willconsist
oftwolinesofgeneralpurposepolystyrene(GPPS)andHighimpact
polystyrene(HIPS)eachwithanannualcapacityof100,000tonneandalineof
expandablepolystyrenewithacapacityof50,000tonne/year.Theplantwill
consume233,000tonne/yearofstyrenemonomerasfeedstockwhichwillbe
sourcedfromthePPC'sstyrenemonomerplant.Theprojectisscheduledtobe
completedin36months.Inthemeantime,theutilitiesfortheprojectwillbe
providedbyanotherNPCsubsidiaryMobinPetrochemicalCompany.Output
fromtheplantwillbemarketedtoboththedomesticandexportmarkets.PPCis
responsibleforimplementingtheproject.Itwilloperatetheprojectwhenitis
completed.
OlefinNo.10
Implementedby:JamPetrochemicalCo(PrivateJointStock)
Location:ParsSpecialEconomic/EnergyZone
Area(Hectares):77
Ownership:NPC(49%),SocialSecurityOrganization(26%),RetirementOrganization
(25%)
Startdate:2000
Projectedproductiondate:20042005
ProductsQuantity:1000Tons/Year
Product
Intermediate Final
Ethylene
1,320
220
Propylene
320
20
LLDPE/HDPE
+
300
HDPE
+
300
Polypropylene
+
300
Ethyleneglycols
+
443
AlfaOlefins
200
168
RawPyrolysisGasoline
+
216
FuelOil
+
40
Butadiene1&3
+
64
Crackedgazoline
+
4

ABS

200

AnIranianprivatecompanycalledFarsaChimiCo.holdsa100%stakeinJam'sEGs
plant
whileanotherIranianprivatecompany,Sadra,hasa51%initsPPfacility.
NPCNewsBulletinJuly2005No.65
JamreadiesforprecommissioningitsHDPEplant
NPCsubsidiary,JamPetrochemicalCo.isgearinguptoprecommissionits300,000
tonne/yearhighdensitypolyethylene(hdPE)unitatAssaluyeh,onthenortherncoast
ofthePersianGulf.ConstructionanderectionworkonJam'shdPEunithasalready
beencompleted.
Meanwhile,workisinprogressonJam's1.3mtonne/yearcrackeranditsdownstream
unitswhichincludea300,000tonne/yearpolypropylene(PP)unit,a300,000tonne/year
linearlowdensitypolyethylene(lldPE)/hdPEunit,a320,000propyleneplant,a300,000
hdPEunit,a443,000ethyleneglycols(EGs)facilityanda216,000pyrolysisgasoline
unit.
JamisalsoslatedtoproduceAlfaolefins,13butadieneandacrylonitrilebutadiene
styrene(ABS).
Overall,theerectionworkfortheentireJamcomplexisover82%completeandits
totalphysicalprogressisover92%.Theerectionactivityisover56%completeforthe
olefinplant.
AnIranianprivatecompanycalledFarsaChimiCo.holdsa100%stakeinJam'sEGs
plantwhileanotherIranianprivatecompany,Sadra,hasa51%initsPPfacility.
2008/6/16
JamPetrochemicalComplexs10tholefinprojectinaugurated
JamPetrochemicalComplex'sTentholefinproject,theworldslargestofitskind,will
beofficiallyinauguratedonTuesdayinAssaluyehregion,southernIran.
Jampetrochemicalstentholefinprojectsexecutiveoperationwasstartedinthe
Persiancalendaryear1379(March20,2000March20,2001)withtheaimof
producingyearly3.3milliontonesofEthylene,propylene,highdensitypolyethylene
(HDPE),lowdensitypolyethylene(LDPE)andotherbyproductsinAssaluyeh.
ThemajorcontractorsoftheprojectareFrancesTechnipCompany,Germanys
KruppUhdeCompany,ItalysTechnimontCompany,andIransNarganandSazeh
companies.
FarsaChimieCompany(FCC)asalargescalemanufacturerofEthyleneGlycols(EG)
mainlyMonoEthyleneGlycol(MEG),astartingmaterialessentiallyforproductionof
PolyEthyleneTerephthalate(PET)polyesterandforantifreezeformulationputinto
operationinDec2007.
Currently,FCCplantisunderoperationinanareaof11hectaresatJam

PetrochemicalComplexwhichislocatedinAssaluyehonthecoastlineofthePersian
Gulf.Bymakinguseofadvancedtechnologythecompanyhasthecapacitytoproduce
annually400Kt/yMonoEthyleneGlycol(MEG),40Kt/yDiEthyleneGlycol(DEG),
2.8Kt/yTriEthyleneGlycol(TEG)tomeetthegrowingglobaldemandandexportto
internationalmarkets.
TheprimarydesigncaseisbasedonproductionofMEGasthemainproductandDEG
andTEGasbyproducts.Inaddition,theplantisdesignedforpurificationof50Kt/y
HPEthyleneOxide(EO)asafutureprojectandalsoiscapabletorecyclepartofDEG
totheglycolreactioninordertoincreasetheTEGproduction.
JamPetrochemicalComplex(JPC)isresponsibleforimplementingofthe10tholefin
projectinanareaof77hectareswhichmorethan40hectareshasbeenreclaimedfrom
thesea.Thiscompanywillbeoneofcountryslargestolefinplantswiththefinal
productioncapacityof1,320Kt/yincludingHDPE,LDPE,BD,andPP.
OlefinNo.12
Location:ParsSpecialEconomic/EnergyZone
ProductsQuantity:1000Tons/Year
Product
capacity
Ethylene
1,900
LLDPE/HDPE
300
MEG
660
DEG
70
Polypropylene
300
Benzene
388
Toluen
196
mixedXylene
128
Propylene(excess)
545
Butadiene
277
Fuelgas
752
Fueloil
979

downsizes
600,000tpaethylene
350,000tpapropylene
nopolyolefins

NPCAug.2004(No.54)
ITBstobeissuedforNo.12ethylene
http://www.nipc.net/npcnews/news54/projects.htm
NPCwillsoonissueinvitationtobid(ITB)documentstointerestedcontractorsforits
worldscaleNo.12olefinsproject,whichwillbebuiltattheParsSpecialEconomic/Energy
ZoneinAssaluyeh.Thecomplexwillconsistoftheworld'sbiggestethylenecrackerwitha
capacityof1.9mtonne/year.Plannedcapacitiesdownstreamofthecomplexinclude300,000
tonne/yearofhighdensitypolyethylene(hdPE)/linearlowdensitypolyethylene(lldPE),
640,000tonne/yearofmonoethyleneglycol(MEG),70,000tonne/yearofdiethyleneglycol
(DEG),300,000tonne/yearofpolypropylene(PP),388,000tonne/yearofbenzene,196,000

tonne/yearoftoluene,128,000tonne/yearofmixedxylene,545,000tonne/yearofexcess
propylene,277,000tonne/yearofbutadieneand845,000tonne/yearoffueloil.
2008/11/13ICISnews
IrandownsizesOlefinsNo12,omitspolymers
Iran'sNationalPetrochemicalCo(NPC)planstoscaledowntheplannedcapacityatits
OlefinsNo12projectatAssaluyehandmodifyitsfeedstockanddownstreamslate,a
seniorcompanyofficialsaidonThursday.
"Wearelookingtoproduce600,000tonnes/yearofethyleneand350,000tonnes/yearof
propylene,"saidMohammadHassanPeyvandi,NPC'sdirectorforplanningand
development,onthesidelinesoftheICISWorldPolymersConference.
Theproject,dueonstreamin2013,hadearlierlookedatproducing1.8mtonnes/year
ofethyleneand900,000tonnes/yearofpropyleneandalsopolyethylene(PE)and
polypropylene(PP).
Theprojectwouldnownotincludeanypolymerproduction,butwoulduseethylene
andpropylenetofeedotherderivativeprojects.
"Thereasonwehavereducedthecapacitiesisthatmarginsforpolymersareonthe
declineandbecausewewouldliketodiversifyourproductslate,"Peyvandisaid.
Thecompanyhasalsodecidedtouseonlycondensatefeedstockforthecrackerrather
thanamixofcondensateandheavyendfeed,hesaid.Thecondensatewouldbe
sourcedfromtheSouthParsgasfieldinsouthernIran,hesaid.
"Thereisbettereconomicsinheavyendoilproducts,sowewouldrathersecure1m
tonnes/yearofheavyendoilproductsfromthecrackerratherthanusetheheavyend
asfeedstock,"Peyvandisaid.
Theprojectwouldalsoincludearomaticsproduction,hesaid.
"Wearelookingtoproduce700,000tonnes/yearofparaxylene,100,000tonnes/yearof
orthoxyleneandaround300,000tonnes/yearofbenzeneattheproject,"hesaid.
2007/4/11TehranTimes
Chinaeagertoinvest$2.7binOlefin12:NPC
NationalPetrochemicalCompany(NPC)ManagingDirectorGholamHosseinNejabat
hereTuesdaysaidthatChinawaskeentomakea2.7billiondollarinvestmentinOlefin
12planinIran.
TalkingafteranEastAsiaPacificstatesforum,hesaidtheIranianandChinese
officialsheldnewroundofnegotiations,whosemaintopicsrevolvedarounda2.7
billiondollarinvestmentinOlefin12planandinvestmentindownstreamand

upstreamoilprojectsinIran.Nejabatsaid,ChinaisthefirstcountrytheIranian
partywillpayavisittoholdofficialtalks.
FourthAromatics
Implementedby:BorzuyehPetrochemicalCompany(privateJointStock)
Location:ParsSpecialEconomic/EnergyZone
Area(Hectares):69
Ownership:100%NPC
Startdate:2000
Projectedproductiondate:2005
Productslate'000t/y
Product
Final
Benzene
430
Paraxylene
750
Orthoxylene
100
Lightends
680
Heavyends
2,000
Raffinate
380
HeavyAromatics
16
LPG
76
C5+
47
NIPCNewsBulletinNo.78April,May,June,July2007
Largestworldscalearomaticplantinaugurated
PresidentMahmudAhmadinejadinauguratedBorzuyehPetrochemicalComplex,the
world'slargestaromaticplant,inSouthParsSpecialEconomic/EnergyZone,southof
Iran.
BorzuyehPetrochemicalCo.,asubsidiaryofNPC,hasnowstartedupits4,458,000
tonsayearofaromaticplant.
Themainproductsofthiscomplexareparaxylene,benzeneandorthoxylenewiththe
annualproductionof1,280,000tons.
ThebyproductsofBorzuyehPetrochemicalCo.,withayearlyproductionof3,178,000
tonsincludeC5cut,LPG,LightEnds,HeavyEnds,RaffinateandHeavyAromatics
whichareeitherusedasthefeedforneighboringpetrochemicalplantssuchastheJam
petrochemicalcomplex,orexportedoverseas.
Therequiredfeedstock,consistingof4,500,000tonsayearofcondensatesand270,000
tonsayearofpyrolysisgasoline,willbesourcedfromPhases1,2,3oftheSouthPars
gasfield,andolefinNo.10andotherpetrochemicalcomplexes,respectively.
Thefirst20,000tonconsignmentofheavyendswasexportedoverseasatthebeginning
daysofthenewIranianyear(startedMarch21,2007).
AconsortiumofToyoofJapan,LGofSouthKorea,andSazehofIran,basedon
licensedtechnologiesacquiredfromTorayofJapanandIFPofFrancethroughanEP
contract,builttheBorzuyehComplexinanareaof61hectaresinSouthParsSpecial

Economic/EnergyZone,southofIranonthenortherncoastofthePersianGulf.
Speakingattheinauguralceremonyforthe4tharomaticplantinAssaluyeh,southof
Iran,PresidentAhmadinejadandhisVenezuelancounterpartPresidentHugoChavez
pointedout"weastwounitedcountrieswillbuildabetterworld."Ahmadinejadmade
theremarkinajointpressconferencewiththevisitingVenezuelanPresident,Hugo
Chavez,inAssaluyeh,BushehrProvince.HesaidthatIranandVenezuelaenjoy
profoundbrotherly,extensiveanddynamicrelationsandwillputtheirachievementsat
theserviceofglobalpeace,welfareandsecurity.
FourthMethanol ZagrosNo.2
Implementedby:ZagrosPetrochemicalCo.(privateJointStock)
Location:ParsSpecialEconomic/EnergyZone
Area(Hectars):31
Ownership:100%NPC
Startingdate:2001
Anticipatedproductiondate:2004
Productslate'000t/yIran'sshareofglobalmethanoloutputtoreach6.4%
Product Final
Methanol 1650
Iran'sshareofglobalmethanoloutputtoreach6.4%
NPCNewsBulletinJuly2005No.65
PrecommissioningworkcontinuesatZagrosNo.1methanol
NPC'sZagrosNo.1methanolcomplexisonthevergeofcompletion.Locatedin
Assaluyeh,itiscurrently97%completeandprecommissioningworkisunderwayat
thesite.The1.65mtonne/yearisexpectedtoreachproductionwithinthefirstquarter
of2006.GermancompanyLurgiisthetechnologylicensorandcontractorresponsible
forbasicengineeringandprocurementservicesoftheoffshoreequipmentand
machinery,whiledetailedengineeringandsupplyoftheonshoreequipmentis
undertakenbyIraniancontractor,PIDEC.TheprojectisoperatedbyZagros
PetrochemicalCo.,anNPCsubsidiary,whichisalsobuildinganothermethanolfacility
ofthesamecapacity.
NPCNewsBulletinJuly2005No.65
NPCpushingaheadwithZagrosNo.2
NPCispushingaheadwithitsZagrosNo.2methanolprojectatAssaluyeh.Overall,
workonthe1.65mtonne/yearprojectisalready60%complete.ZagrosNo.2usesthe
sametechnologyasZagrosNo.1.Thenaturalgasfeedstocksupplyfortheprojectwill
besourcedfromSouthParsgasfieldandoxygenwillbesuppliedbyanearby
centralizedutilitycomplexMobinPetrochemicalCo.Whencompleted,70%ofthe

outputfromZagrosNo.1andNo.2willbeexported.
AssaluyehAmmonia/Urea
Implementedby GhadirPetrochemicalCo.
Location:ParsSpecialEconomic/EnergyZone
Area(Hectares):47
Ownership:NPC 48%
GhadirInvestmentCo.51%
IranPetrochemicalCommercialCo.(IPCC) 1%
IPCCistheNPCsmarketingandsalessubsidiary.
Startingdate:2001
Anticipatedproductiondate:2004
Productslate'000t/y samecapacitiesatthesame

site.
Product Intermediate Final
Ammonia
680
75
Urea
1075
Feb.2006NO.69
AssaluyehammoniaureaNo.1onvergeofcompletion
ThefirstammoniaureacomplexinAssaluyehreadiesforcompletion.Overall,the
plantisalreadyabout98%complete.Itisslatedtoproduce680,000tonne/yearof
ammoniaand1,075,000tonne/yearofurea.Theammoniaplantisalready97.6%
completeandtheureaunitis97.9%finished.Thecomplexhasfinished99.9%ofcivil
andconstructionworkand98.9%oferectionandprecommissioningactivity.
Ammonia/UreaComplexNo.2
NPCNewsBulletinJanFeb,2004
NPCselectscontractorsforits2ndAssaluyehAmmonia/UreaProject
http://www.nipc.net/npcnews/news4748/projects.htm
On28February2004,NPCawardedthecontractforitsAmmonia/UreaComplexNo.2at
ParsSpecialEconomic/EnergyZonetoaconsortiumofToyoEngineeringandChiyodaof
JapanandPetrochemicalIndustriesDesignandEngineeringCo(PIDEC)ofIran.
Thecontractcoversprovisionoflicense,basicanddetailedengineering,procurementand
supplyofequipmentandsupervisionservices.
ThecomplexwillbelocatedadjacenttoAmmonia/UreacomplexNo.1.
ItisaduplicationofNo.1complexwiththesamecapacityof2050tonne/dayofammonia
and3250tonne/dayofurea.ItwilluseMWKelloggandStamicarbon'stechnologiesforthe
ammoniaandureaplantsrespectively.TheureagranulationprocessislicensedbyHydro
FertilizerTechnology(HFT).

Theproject'sfeedstockisnaturalgas,whichwillbesuppliedbySouthParsgasfield.
Thecomplexisscheduledtobecompletedin24months.Itwillbeimplementedby
PetrochemicalIndustriesDevelopmentManagementCo(PIDMCO),anNPCsubsidiary.

2004/04/12 /

http://release.nikkei.co.jp/detail.cfm?relID=69384


2,0503,250

2007/11/3www.tehrantimes.com
GhadirPetrochemicalComplexofficiallyinaugurated
GhadirPetrochemicalComplex,theproducerofureaandammonia,was
officiallyinauguratedinthepresenceofIransPresidentMahmud
AhmadinejadThursday.
GhadirUreaandAmmoniaComplexisoneoftheprojectsofthefirstsite
ofParsSpecialEconomicEnergyZone(PSEEZ),whosefirstphasebecame
operationalonMarch25,2007.
Thetwophasesofthecomplex(each)produceonemilliontonsofureaand
680thousandtonsofammoniaperannum.Ureaisthemainproductofthe
complexandthemainpartofproducedammoniaisusedforproductionof
urea.
BushehrPetrochemical
Location:BushehrProvince,inthevicinityofParsSpecial
Economic/EnergyZone

'000t/y
ethane 850
ethylene 670
methanol 1,970
MayIuneJuly 2006
NPCtoinvitebidforBushehrPetrochemicalComplex
ThecomplexwillbebuiltinBushehrProvince,inthevicinityofParsSpecial
Economic/EnergyZone.Thecomplexwillconsistofanethanerecoveryplantto
recover850,000tonne/yearethanefromnaturalgassuppliedfromSouthParsGas
fields,anethanecrackingplanttoproduce670,000tonne/yearpolymergradeethylene
andamethanolplantwithacapacityof1,970,000tonne/yearforexport.Tender
DocumentsforEPCCcontractarepreparedandwillbedispatchedtoshortlisted
bidderssoonforsubmissionofproposals.
MobinCentralizedUtility
Implementedby:MobinPetrochemicalCo.(PrivateJointStock)
Location:ParsSpecialEconomic/EnergyZone
Area(Hectars):47
Ownership:100%NPC
Startingdate:2001
Anticipatedproductiondate:2004
Productslate
Product
Final
Electricity
740MW
Steam
2130t/h
Coolingwater(fromsea)
374,000
PotableWater
100m3/h
BoilerWater
2,290
Freshwater
1,560m3/h
DMwater
1,560m3/h
Nitrogen
48,000m3/h
Oxygen
156t/h

DME(Zagros)
NPCNewsBulletinMay2004
NPC'sR&TCo.&TopsosetobuildDMEforZagros

ThePetrochemicalResearch&TechnologyCompany(PRTC)ofNPCand
HaldorTopsoeA/SofDenmarkhavebeenengaged,underacollaboration
agreementsignedtwoyearsago,inajointefforttodemonstratenew
technologiesforthepetrochemicalindustry.Thecollaborationhasnowresulted
inacontractwithZagrosPetrochemicalCo.tolicensetechnology,provide
engineeringandsupplycatalystforan880,000oftonne/yearofdimethylether
(DME).TheplantwillbelocatedatParsSpecialEconomic/EnergyZone.Itis
basedonthetechnologyandcatalystdevelopedbyHaldorTopsoeA/Sfor
dehydrationofmethanolandmadeavailableinIranbyjointscientificand
technicalcollaborationwithPRTC.Theimplementationofthisprojectwill
resultinaworldwideincreaseinDMEproductionbymorethan200%and
representsabreakthroughfortheapplicationoftheproductasagreenfuel.
June162004HaldorTopsoe
ContractLicenseandBasicEngineeringoftheFirstLargescalePlantfor
ProductionofDME
http://www.haldortopsoe.com/site.nsf/all/CHAP5ZZBB5?OpenDocument
PetrochemicalResearch&TechnologyCompany(NPCRT)ofIranandHaldor
TopsoeA/SofDenmarkhavebeen,underacollaborationagreementsignedtwo
yearsago,engagedinajointefforttodemonstratenewtechnologiesforthe
petrochemicalindustry.Itiswithagreatpleasuretoannouncethatthis
collaborationhasnowresultedinacontractwithZagrosPetrochemical
Companytolicensetechnology,provideengineeringandsupplycatalystfora
dimethylether(DME)plant.
TheplantwhichistobeconstructedatBandarAssaluyeh,Iranwithacapacity
of800,000MTPYofDME,isbasedontechnologyandcatalystdevelopedby
HaldorTopsoeA/SfordehydrationofmethanolandmadeavailableinIranby
jointscientificandtechnicalcollaborationwithNPCRT.
TheimplementationofthisprojectwillresultinaworldwideincreaseinDME
productionofmorethan200%andrepresentsabreakthroughfortheapplication
ofDMEasagreenfuel.