x000D - Job Safety Analysis Local Delivery
x000D - Job Safety Analysis Local Delivery
x000D - Job Safety Analysis Local Delivery
1 (36)
Field Supervisor
Position
11/2/2015
Digicel
Date
Customer
Aspirona
Supplier Name
Link Upgrade
Urban area
Activity performed
Geographic location of the site and the nearest hospital:
Address / Location
Phone:
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
2 (36)
No
N/A
Yes
No
N/A
"The risks qualified as UNACCEPTABLE and NO ACTION THERE MITIGATING, should be channeled immediately to the Project Manager (IM Er
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
3 (36)
Photos: Personal Protective Equipment, Emergency Plan, aid kit and fire extinguisher on site
Emergency MOP:1:Notify appropriate response personnel. 2:Shut down operations and evacuate the
designated assembly area(s): 4.Assess the need for site evacuation, and evacuate the site as warranted: 5.
as required by shareholders.
Probability
No
High
Risks:
Medium
x
x
Vehicular collision
Insecurity (robbery, kidnapping, threats)
Low
Consequence
Multiple lesions
Fatality
Other (specify):
x
x
x
x
x
x
Other (specify):
Yes
Site Access
Probability
No
High
Risks:
Insecurity (robbery, kidnapping, threats)
Aggression of neighborhood
Animal aggression
Undergrowth
Poor lighting conditions
Medium
x
x
x
x
Low
Fatality
x
x
x
Consequence
Permanent or total disability
Permanent partial disability
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
Other (specify):
4 (36)
First aid
Affectation of service
Impact on the brand Ericsson or Client
x
x
x
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
5 (36)
Yes
Work at Height
Probability
No
High
Risks:
Fall more than 2 meters
Amputation
Fractures
Damage to back
Medium
x
x
x
x
Low
Consequence
Fatality
Permanent or total disability
x
x
x
x
First aid
Affectation of service
Impact on the brand Ericsson or Client
x
x
x
x
x
x
Other (specify):
x
x
Work in excess of 2 meters, alone, heights are prohibited; should have a vigia or companion
Photos: Risks work at heights
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
6 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
Yes
No
7 (36)
High
Risks:
Medium
Electrocution
Low
Consequence
Amputation
Burns
Fatality
Fire
Cardiac arrest
First aid
Explosion
Affectation of service
Other (specify):
Works with high voltage are prohibited, works with energy must have a lookout or companion (except lo
"Low voltage (" LV ")" usually refers to the voltage exceeds low voltage levels, but without exceeding 1000 V AC or 1500 V DC betwe
between conductors or ground.
Photos: Risks works with electricity
Probability
Yes
Hot work
No
High
Risks:
Medium
Burns
Fire
Low
Consequence
Explosion
Fatality
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
8 (36)
Electrocution
First aid
Other (specify):
Affectation of service
Impact on the brand Ericsson or Client
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
Yes
Manual handling
9 (36)
No
High
Risks:
Medium
Damage to back
Low
Consequence
Multiple injuries
Entrapping
Fatality
Luxations
Contusions
First aid
Other (specify):
Affectation of service
Impact on the brand Ericsson or Client
Other (specify):
Probability
Yes
No
High
Risks:
Medium
Intoxication
Spills, leaks of chemicals
Low
Consequence
Explosion
Fatality
Water Pollution
Soil contamination
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
10 (36)
Air Pollution
First aid
Affectation of flora
Affectation of service
Allocation of wildlife
Fire
Burns
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
11 (36)
Probability
Yes
No
High
Risks:
Medium
Damage to back
Low
Consequence
Multiple injuries
Entrapping
Fatality
Luxations
Contusions
First aid
Affectation of service
Explosion
Other (specify):
Fire
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
12 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
13 (36)
Signature
Name an
Name
Sibron Barnett
Name
Keston Emmanuel
Name
Randolph Maman
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
14 (36)
Name
Name
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
15 (36)
Link Upgrade
Activity performed
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
Yes
Emergency plan and emergency numbers:
Rescue Plan:
No
N/A
16 (36)
uld be channeled immediately to the Project Manager (IM Ericsson) with a copy to contact OHS Ericsson".
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
17 (36)
response personnel. 2:Shut down operations and evacuate the immediate work area:3.Account for personnel at the
need for site evacuation, and evacuate the site as warranted: 5.Conduct Incident Notification,Reporting and Investigation
as required by shareholders.
x
x
x
x
x
Other (specify):
x
x
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
18 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
19 (36)
x
x
x
x
x
x
Other (specify):
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
20 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
21 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
22 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
23 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
24 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
25 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
26 (36)
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
27 (36)
Reviewed by:
Signature
Signature
Signature
Signature
Signature
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
28 (36)
Signature
Signature
Date: 2014-12-23
Prepared: TAM/O/N/M/A Acela Juarez_x000D_Approved:
TAM/O/N/M/A
Juarez] No: OPER/RLAM-14:004435 Uen_x000D_Rev: A
Sheet:
JSA RLAM [Acela
(English)
Public
ANALYSIS_x000D_Job
29 (36)
Aspirona
LTE Upgrade
Element
Fulfillment
Safety harness
Harness code
Date of manufacture
Harness straps
YES
NO
NO
NO
Carabiners
YES
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
Breakage or deformation
Deformed beards
Unadjusted
Cracks, especially at the intersection of the straight portion and curved
They are in perfect condition (rusted , broken , heat damage)
D - Rings
Sewing
Lifeline straps
Absorber
NO
YES
Sling code
Date of manufacture
YES
NO
NO
NO
NO
NO
NO
Cuts
Abrasion or frayed
Overstretching
Deterioration by rotting, mold or ultraviolet exposure
Check overload indications
YES
NO
NO
Sling code
Date of manufacture
YES
NO
Date of manufacture
YES
NO
Sling code
Date of manufacture
YES
NO
Date of manufacture
Delivery date
YES
NO
Cuts
Sling straps
Abrasion or frayed
Overstretching
Deterioration by rotting, mold or ultraviolet exposure
SIGNATURE
OPERATIONAL
SIGNATURE
Activity
Arrive onsite and gain access to the site
Place call to the NOC upon entering
Team assess site for any issues & hazards
Team reports issues & hazards to NOC
Team organizes tools, materials, & safety equipment
Team conducts safety meeting, ways to mitigate issues and hazards, and warmup
FS take backups of system
Crew begins climb
Crew assess tower for ability to preinstall equipment or perform swap
Crew perform installation when ready
FS configures RAU
Alignment of Antenna perormed
Traffic restored and confirmed with NOC
All areas of installation are completed
Site is cleared
Place call to the NOC upon leaving
Notes:
Team may arrive early and begin assembling material on the ground
Alloted time for install is 3 hours granted no major issues are encountered
Name
Safety
Helmet
Chin
Strap Vest
Steeltoe
Boots
Caution
Tape
Safety Head
Cone
light
Harness
Date: