Jindal Steel and Power Ltd

Investor Presentation
4Q FY16 (May 16)
Copyright @ 2015 Jindal Steel & Power Limited

Table of Contents
S No.

Content

Slides

The Company

3-12

Focus for FY2016-17

13-14

Overview & Business Segments

15-25

Power Business

26-34

Global Ventures

35-45

Financials & Operational Highlights

46-53

Key Initiatives & Projects Update

54-61

Facilities at a glance

62-78

CSR Initiatives

79-82

10

Rewards & Recognitions

83-85

11

Contact Us

86
Copyright @ 2015 Jindal Steel & Power Limited

Jindal Steel & Power Limited


Building the Nation of Our Dreams

Aerial View of Raigarh Plant

Copyright @ 2015 Jindal Steel & Power Limited

Ownership Structure - O P Jindal Group


O P Jindal Group

Jindal Saw
Mr. P.R. Jindal

JSL Limited
Mr. Ratan Jindal

JSW Steel/JSW Energy


Mr. Sajjan Jindal

Jindal Steel & Power (JSPL)


Mr. Naveen Jindal

Copyright @ 2015 Jindal Steel & Power Limited

Key Milestones during our journey


Commisioned coal gasification plant, first of its
kind and the Angul Integrated Steel Complex
Commissioned 2.0 MTPA SMS at Shadeed
Commissioned 4.5MTPA pellet plant at Barbil

Acquired 99.99% stake in Shadeed


Iron & Steel Co

2015
2014

1,000 MW
Tamnar I
commissioned
Setup a Coal Washery
with a
2.5 MTPA capacity for
DRI, Raigarh

2012
2010

1,200 MW (2*600MW) of
Tamnar II commissioned

2009
2008

Promoted as Orbit
Steel Private
Limited (OSPL) by
Late Mr. O.P. Jindal.

Commercial production of
India's widest 5.0 meter wide
plate mill production at Angul

2005
2001
1979

1998

After a restructuring exercise in Jindal Strips


Limited (JSL), JSLs Raigarh and Raipur units
were hived off and merged with JSPL

Jindal Power
Ltd (JPL)
became a
subsidiary

Commissioned 4.5MTPA
pellet plant at Barbil

Copyright @ 2015 Jindal Steel & Power Limited

JSPL - Formidable Steel & Power player


Capex cycle completed on path to achieve multifold earnings
growth

Projects at strategic locations in proximity to raw materials,


end markets and evacuation infrastructure

A comprehensive diversified long products portfolio with


several unique high value added products

Amongst the lowest cost producers of steel and power in India

3,400 MW IPPs set up at extremely competitive project cost

Copyright @ 2015 Jindal Steel & Power Limited

What differentiates us
Technological innovation
Coal gasification plant first time in India
Conversion of EAF into BoF
Hot Charge DRI and Slab

Project execution track record


Projects set up within record timeline and cost
3rd Unit of 4x600 power plant synchronized in record time of 16 months
Barbil pellet plant of 4.5 MTPA in 23 months
Oman 1.5 MTPA DRI project commissioned 4 months before schedule
Oman 2.0 MTPA SMS commissioned in 23 months
Superior asset quality and business model
Copyright @ 2015 Jindal Steel & Power Limited

What differentiates us
Lowest cost producer
Low cost of steel manufacturing on account of
Captive power supply and
Low logistics overhead due to strategic plant locations
Power projects set up at extremely competitive project cost

Integrated operations
Presence across the entire steel making value chain
Own railway sliding at each of the plants

Superior asset quality and business model


Copyright @ 2015 Jindal Steel & Power Limited

Experienced Board Of Directors


Naveen Jindal
Chairman
Experience: 21 years
Qualification: MBA
(University of Texas)

Ravi Uppal
MD & Group CEO
Experience: >36
years

Shallu Jindal
Non Executive
Director
Director of Jindal
Power Limited

Qualification: MBA
(IIM A)

Arun Kumar Purwar


Independent Director

R.V. Shahi
Independent Director

Experience: >33 years

Experience: >30 years

Qualification: MBA

Qualification: M.Com

Former Power Secretary

Former CMD, SBI

Hardip Singh Wirk


Independent Director

Experience: >11
years

Chandan Roy
Independent director

Experience: 40 years

Qualification: Mechanical
Engineering

Qualification: LLB

Dinesh Kumar Saraogi


Wholetime Director

Shalil Mukund Awale


Nominee director

Haigreve Khaitan
Independent Director

Arun Kumar
Independent Director

Experience: 38 years

Qualification: MSc

Experience: >18
years

Qualification: LLB

Rajeev Bhadauria
Whole time director

Experience: 28

Qualification: LLB

Sudershan Kumar Garg


Independent Director

Experience: 32 years

Experience: 18 years

Qualification:
Mechanical
Engineering

Experience: 39 years

Qualification:
Chemical Engineering

Qualification:
Bcom & CA

Copyright @ 2015 Jindal Steel & Power Limited

& Best in Class Management


K. Rajagopal
Group CFO
Experience:
>30 years

Anand Goel
Chief Advisor
Experience:
>36 years

Rajesh Bhatia
CEO-Global
business
Experience:
>25 years
VK Mehta
Director, S&M
Experience:
>36 years)

N.A. Ansari
CEO, Oman
Experience:
>38 years.
Copyright @ 2015 Jindal Steel & Power Limited 10

Moving Towards Plural Leadership


Strategic Governance Structure

Operational Governance Structure

Business
Segments

Core
Management
Team

ManCo

UniCo

For each
Business

For each
Location

Group
Executive
Committee

Steel & Cement


Power
Senior Management
Committee

Mines & Minerals

Global Ventures
Construction Material & Solution

Implementation of Strategic & Operational Governance Structure


Copyright @ 2015 Jindal Steel & Power Limited 11

Shareholding of JSPL from FY13

Number of share holder s (Retail /HNI) increases by 15% in 2Q FY15


Copyright @ 2015 Jindal Steel & Power Limited 12

Focus for FY17


Capacity Utilization

Ensure Full Utilization of Steel Capacity


Increase Operational efficiency of all processes
Transition of product mix More Value Added & Premium products
Commission & Commercial production from Rebar mill in Angul
Optimally utilize power capacities to generate higher operating profits

Financial Prudence

Cost Savings & Incremental Operating Profits by Completion of Angul Phase IB


Substantially increase margins in Oman - utilize full Rebar capacity
Further reduction in Working Capital
Completion of Refinancing of Debt in Steel
Implementation of Vendor Managed Inventory on JIT principles

Copyright @ 2015 Jindal Steel & Power Limited 13

Green Shoots for Steel Industry

Indias per capita steel consumption of 59.4Kg, is way below world avg
of 217 Kg in 2014.

Domestic Steel Demand Increasing during April-Feb 16


Finished Steel: Consumption stood at 73 mt, a growth of 4.6% (y-o-y)
Fall in Imports post February due to MIP & rising international prices

Increased Domestic Raw material availability :


Iron Ore availability increased by 20% to estimated 155 Mt in FY 15-16
More then 62 Mt additional Iron ore mining capacity came up in FY 15-16.
Coal (from CIL & SCCL) availability increased by 9% (50Mt) to 597 Mt in FY
15-16
Governments Construction & Infrastructure led Growth Model:
Steel is central to the idea of Urbanisation which is the focus of all programmes
announced by the Government of India

Union Budget 2016-17: Govt. to spend Rs 2,18,000 Cr on roads,


railways
14

Business Segments
Steel

Mines &
Minerals

Power

Global
Ventures

Construction
Material &
Solution

Current Capacities Domestic & Global

IPP 3400** MW
CPP 1649 MW
4.75 MTPA Steel*
Renewable 24 MW

3.11 MTPA*

Domestic
**Includes 600 MW - synchronized & will be commissioned in FY16

2 MTPA Steel
6.25 MTPA Mines

Cement
Road solutions
LGS

Copyright @ 2015 Jindal Steel & Power Limited

15

Integrated Operations with multiple point of sale


Raw materials

Intermediate inputs

Coal from mines

Processing
Coal washery

End-products
Washery rejects

Char/Flu gases

Rotary kilns

Pelletisation
plant

Pellets

Sponge
iron

Iron ore
from
mines

EAF/BoF

Fines

Coking coal

Coke
oven

Sinter
plant

Sinter

Electricity

Power plant

Rounds/
Blooms/
Slabs/Billets

Blast furnace

Wire Rod &


Bar Mill

Wire Rod &


Rebar

Plate mill

Plates &
Coils

Rail &
universal
beam mill

Rails
Structurals

Pig iron

Coke
Point of sale

Multiple sale points across steel value chain

Copyright @ 2015 Jindal Steel & Power Limited 16

Steel Capacities across Life Cycle

Iron Making

Liquid Steel

Finished Steel

(6.75 MTPA)

(6.75 MTPA)

(6.55 MTPA)
WRM 0.60 MTPA

DRI 3.12
MTPA in
Capacity
deail

BF 2.13 MTPA

RUBM 0.75 MTPA


SMS 6.75 MTPA

MLSM 0.60 MTPA


Plate Mill 2.20 MTPA

HBI 1.50 MTPA


BRM 2.4 MTPA

BRM in Angul 1.4* - Commissioning in 1QFY17


* To be commissioned

Effective Finished Steel 8.05 MTPA


Copyright @ 2015 Jindal Steel & Power Limited

17

Integrated & Diversified operations of scale


Raigarh

Angul

Barbil

Patratu

(Chhattisgarh)

(Odisha)

(Odisha)

(Jharkhand)

BF 1.67
MTPA
DRI 1.32
MTPA
SMS
3.25MTPA

CGP
225,000
Nm3/Hr
DRI 1.8
Capacity
MTPA in

Plate Mill
1.00 MTPA

MTPA

Pellet
Plant

Plate Mill
1.2 MTPA

9 MTPA

RUBM 0.75
MTPA
MLSM 0.70
MTPA
CPP 839
MW

deail
SMS 1.5

CPP 810
MW
Hot Metal

SMS 2.0
MTPA

JPL

Mining

Tamnar
2800
MW

Iron Ore
3.11
MTPA

600
MW*

Coal
Overseas
6.20
MTPA

HBI 1.5
MTPA

Rebar
Mill 1.0
MTPA

BRM 1.4
MTPA*

Power

*To be commissioned

WRM
0.60
MTPA

Oman

BRM 1.4
MTPA

Liquid Steel

Finished Steel

Copyright @ 2015 Jindal Steel & Power Limited

18

JSPL Product Range

Copyright @ 2015 Jindal Steel & Power Limited 19

JSPL Product Range

Copyright @ 2015 Jindal Steel & Power Limited 20

Special Grade Plates Angul

Developed steel grades for various critical applications like boilers, ship building,
petroleum pipes, high strength grades for automotive and earth movers, structural steel
for oil exploration platforms, grades for making warships , ballistic launch applications
and bullet proof vehicles, stainless steel low thickness plates for nuclear application
Copyright @ 2015 Jindal Steel & Power Limited 21

Value Added Products help in higher Turnover & EBITDA margins

Cement

Cut & Bend

EPS Panels

Welded Mesh

Road Stabilizer

LGS

Speed Floor

Bricks & Pavers

LWA

Copyright @ 2015 Jindal Steel & Power Limited

22

Extensive Sales and Distribution Network

Plants
Distributors
Stockyards

Pan India presence with multiple customer touch points


Copyright @ 2015 Jindal Steel & Power Limited 23

COUNTRY / PRODUCT WISE


PERFORMANCE 2014 -15

S.E ASIA, 1%

MIDDLE EAST,
42%

USA/CANADA
, 24%

NEPAL/
BANGLADESH
/ SRILANKA,
24%

MEXICO, 4%

WRT/TMT

AFRICA,
5%

SEMIS

PLATE

EU, 0%

STRUCTURAL

RAIL
PREFAB

Copyright @ 2015 Jindal Steel & Power Limited 24

Steady customer base of marquee corporates

Customer base comprising large public and private sector clients


Copyright @ 2015 Jindal Steel & Power Limited 25
Copyright @ 2015 Jindal Steel & Power Limited 25

Copyright @ 2015 Jindal Steel & Power Limited 26

Power Capacities at a glance


Independent Power Projects (IPP)
Project
Tamnar 1(a)

Tamnar 2(a)

Satara (b)

Capacity
(MW)

Fuel

Configurati
Status
on

1,000

Coal

4x250 MW Operational

2,400

Coal

1,800 MW
operational,
4x600 MW
balance 600 MW
synchronized

24

Wind

18x1.5 MW Operational

Captive power projects (within JSPL)


Raigarh
Tamnar
Angul

Project

Capacity
(MW)

Fuel

Configuration

Status

Satara

DCPP, Raigarh
IPP

540

Coal

JSPL, Raigarh

299

Coal &
waste
heat

Angul, Odisha

810

Coal

CPP

4x135 MW

Operational

2x25 MW & 40 MW
(Waste heat)
2x55 MW
3x25 MW
24 MW

Operational

6 x135 MW

Operational

One of the largest thermal portfolios in India


(a) Within JPL; (b) Within JSPL

Copyright @ 2015 Jindal Steel & Power Limited 27

IPP - JINDAL POWER LIMITED


96.43% subsidiary of JSPL

EUP -I

EUP -II

EUP -III

1000MW (4 X 250)

1200MW (2 X 600)

1200MW (2 X 600*)

*600 MW Synchronized, Await Commissioning


Copyright @ 2015 Jindal Steel & Power Limited 28

Key Contractual Arrangements for JPL


Tamnar-I, 1,000 MW (EUP I)
Awaiting clarity on Tara

Coal Block
FSA

Tamnar-II - 1,200 MW (EUP II)

Awaiting clarity on Gare

Long term linkage from

Mahanadi Coal Limited


(MCL) and South Eastern
Coalfields Limited (SECL)

In the interim, coal

sourced through market


purchase and e-auction

Tamnar-II - 1,200 MW (EUP III)

Palma IV/2 & 3 Coal mine


Market purchase and e-

auction

TNEB 400MW

PPA

TNEB 200 MW

CSEB 60MW

Bilateral/short term/

KSEB 200MW

merchant

KSEB 150MW

258km transmission line

Evacuation

from plant to national grid

CSEB 60MW

TNEB, PPA full open access


for 400MW from Oct 2015
post commissioning of
765KV Aurangabad Solapur
line

Open access to be finalised

against PPAs

Raw materials, transmission & PPAs in place for achieving higher PLF
(a)

Excluding auxiliary consumption

Copyright @ 2015 Jindal Steel & Power Limited 29

PPA Arrangements
Period
Project

Buyer

Type

From

To

Long Term

Feb-14

Sep-28

400

Tamnar I

Medium Term

Sept-12

Aug-17

200

Tamnar II
(Phase 1)

Long Term

Jun-16

May-41

200

Tamnar II
(Phase 1)

Long Term

Oct-17

Sep-42

150

Tamnar II
(Phase 1)

Long Term

After commercial operation of Unit


and for complete life of plant

60

Long Term

After commercial operation of Unit


and for complete life of plant

60

Tamnar II
(Phase 1)

Quantum (MW)

Tamil Nadu

Kerala

Chhattisgarh
Tamnar II
(Phase 2)

More than 30% of commissioned capacity tied up *


* 2800MW Out of 3400 MW (IPP)

Copyright @ 2015 Jindal Steel & Power Limited 30

Upcoming PPAs
Type

Procurer

Quantum (MW)

Schedule delivery Tenure (years)

Uttar Pradesh

Long Term

2,800

Oct-16

15

Bihar

Long Term

500

3 year after
submission of RFP

NA

Uttar Pradesh

Long Term

1,000

Oct-16

15

JPL - Well placed on account of low capital cost base


Copyright @ 2015 Jindal Steel & Power Limited 31

Upcoming Transmission Infrastructure & Benefits

Supply 165 MW to KSEB

Kurukshetra

NR
Agra

Jaipur

3000 MW
+ 3000
MW

Gorakhp
ur
Vanara
si
Barh

Gwalior

Rihan
d

Gaya

Vidhyanchal
Shujalpu
r`

Jabalpur Champa
Wardha
Warora

WR

NE R

ER

DharamjaigarhOct1
5

Banaskantha

Increase Medium term PPA supply to TNEB


from 60 MW to 200 MW by Sept16

Bishwanath Charali

Orai
Rapp
C&D
Chittorgarh

Transmission corridor is expected from Jun16

Ranc
hi
Jharsugu
da Ang
Raigarh P.S
ul

Long term access from WR to NR granted for


557 MW is expected to be available by Jun-16
upon commissioning of Champa
Kurukshetra HVDC link (3,000 MW). This will
be useful for power sale to UP

No constraint in power evacuation to


Western and Eastern Region entities

Kolhapur
Nizamabad
Srikakulam
Warangal

Narendra

S
R
6000
MW

Legends:
400 kV D/C Line
765 kV D/C Line
765 kV S/C Line
800 kV HVDC Line

Pugalur

Transmission constraints expected to be resolved in the near term


Copyright @ 2015 Jindal Steel & Power Limited 32

JPL Financials
Particulars

Net Sales
(Million USD)

PAT
(Million USD)

Generation
(MU)

PLF

Year 2015-16

3,015

(102)

9,542

59% (EUP1)
28% (EUP 2)

Year 2014-15

3,228

(171)

10636

93% (EUP 1)

Year 2013-14

2,457

1,107

8282

92%

Year 2012-13

2,510

1,113

7973

91%

Year 2011-12

3,040

1,765

8589

98%

Copyright @ 2015 Jindal Steel & Power Limited 33

JPL- Snapshot of Key Financials

Onset of Summers & KSEB PPA offtake likely to push EBITDA margins up
-

34

Corporate Office, Jindal Africa

Copyright @ 2015 Jindal Steel & Power Limited 35

Summary of International Operations


Shadeed, Oman

1.5 MT HBI & 2 MT SMS Plant


plans to make it an Integrated
Steel Plant

Mozambique,
Africa

Developing a coal mine


(3 MTPA) in
Mozambiques coal-rich
Moatize region

Coal resources
estimated at 1.2 bn
tonnes including coking
coal

Australia

South Africa, Africa


JSPLs Kiepersol Colliery produces Anthracite
coal, sold domestically and internationally Plans
to ramp up capacity

Acquired 82.04% controlling


stake in Wollongong Coal
(Erstwhile Gujarat NRE coking
coal Limited)

Copyright @ 2015 Jindal Steel & Power Limited 36

Holding structure for global operations


Jindal Steel & Power Ltd
Listed Operating Entity in India

Jindal Steel & Power (Mauritius) Ltd


Holding company for overseas business

Oman
2 MTPA Steel plant

Australia
Coking Coal

South Africa
Anthracite Coal

Mozambique
Thermal/ Coking Coal

Copyright @ 2015 Jindal Steel & Power Limited 37

Jindal Shadeed Iron & Steel, Oman


Marching towards becoming a Fully Integrated Steel Plant

1.5 HBI

2 MTPA SMS

1.4 MTPA Rolling Mill

Copyright @ 2015 Jindal Steel & Power Limited 38

Oman - Salient Features


First & Largest Integrated steel plant of Oman
Third largest in Arabian Peninsula
Port based steel plant
Largest Arc furnace in Arabian Peninsula, with contracted natural gas
Worlds Best Performing Midrex plant (category 1.5MTPA)

Products : TMT Rebars, HBI, Blooms & Billets

Copyright @ 2015 Jindal Steel & Power Limited

39

Sourcing of Raw Materials - Oman Plant


Iron Ore Pellets from Vale (Next door neighbour)

Natural Gas from Oman Government through long term contract (at concessional
prices)
Scrap from External Purchase

Key Markets
Sales break up by geography (FY-15)

Sales break up by customer (FY-15)

Saudi Arabia
Others
Italy

Others

Fecat

US

South Korea

Vilmeks

UAE

Ethiopia

Arcellor

South Africa

Al- Wataniyah

Conares

JSW
Emirates

Sohar Steel

China
India

Kuwait
Oman

40

Kiepersol Colliery, South Africa


An Underground Anthracite and Lean Bituminous Coal mine

Location: Piet Retief in Mpumalanga province, South Africa


Resources : Up to 40 MT

Reserves: 22 MT
Products : Anthracite coal
Mining Capacity : Can be expanded to 1.2 MTPA capacity annually
Copyright @ 2015 Jindal Steel & Power Limited 41

Chirodzi Mine - Mozambique, Africa


Open Cut Coking & Thermal Coal Mine

Location: Chirodzi, Mozambique (105 kms from Tete)


Resources : 2,000 MT

Reserves: 132 MT
Products : Semi Hard coking coal , High Grade Thermal Coal
Mining Capacity : 3 MTPA
Copyright @ 2015 Jindal Steel & Power Limited 42

Mozambique - Salient Features


Coking Coal Asset
Exploration License over 100 square kms.
in Central Kalimantan
Medium to large size deposits of prime
hard coking

Thermal Coal Asset

Large size deposit of low ash low sulphur thermal coal for open cast operation
MoU signed with Bupati Barito to develop road for coal hauling

Return load for 200,000 MT tonnages secured resulting in decrease of logistics costs
Infrastructure developed in Moatize for storage and loading of coal into trains
Copyright @ 2015 Jindal Steel & Power Limited 43

Wollongong Coal Ltd., Australia


Two Mines with Unique unmatched location & strategic advantages

Location: Russell Vale & Wongawilli (Wollongong - 80 kms. South of Sydney)


Reserves : 175 MT
Products : High Quality Coking Coal
Mining Capacity : Targeting 2 MTPA
Logistics : Port Kembla - Less than 20 kms
Copyright @ 2015 Jindal Steel & Power Limited 44

Australia - Salient Features


Unique Geographic Location

Wollongong
(80 kms. South of Sydney)
Experienced mining
community available

Port Kembla:
Less than 20 kms with
sufficient coal handling and
Cape size capacity
Easy and reliable
connectivity through Rail
and Road

Unique unmatched location with significant strategic advantages


Copyright @ 2015 Jindal Steel & Power Limited 45

Financials
&
Operational Highlights

Copyright @ 2015 Jindal Steel & Power Limited 46

Consolidated Steel Production

Total Steel Production up 23%*


*Quarter on Quarter

Copyright @ 2015 Jindal Steel & Power Limited 47

Consolidated Steel Sales Volumes

Total Steel Sales volumes up 42%*


*Quarter on Quarter

Copyright @ 2015 Jindal Steel & Power Limited 48

Consolidated Financials at a Glance

Copyright @ 2015 Jindal Steel & Power Limited 49

Standalone 4Q FY 16 - Snapshot of Key Financials

50

Standalone FY 16 - Snapshot of Key Financials

51

Consolidated 4Q FY 16 - Snapshot of Key Financials

52

Consolidated FY 16 - Snapshot of Key Financials

53

Copyright @ 2015 Jindal Steel & Power Limited 54

Converted : EAF to NEOF (Zero power furnace), Raigarh

JSPL has successfully converted one of its Electric Arc Furnace(EAF) to a basic oxygen
type furnace.
Would result in i) lower Thermal coal requirement (as more hot metal produced through
Blast Furnace route will be used) ii) power savings and iii) eliminates consumption of
Electrodes.
This will result in substantial saving in our steel making (liquid steel) cost at Raigarh. .
55

Commissioned : 1.4 MTPA Rebar Mill, Oman

Upgraded : 1.0 MTPA Plate Mill, Raigarh

57

Ushering Turnaround: Blast Furnace Construction, Angul

Ushering Turnaround: Coke Oven Plant Construction, Angul

Ushering Turnaround: Sinter Plant Construction, Angul

Construction & Solutions Growth : BKC, Mumbai

61

Copyright @ 2015 Jindal Steel & Power Limited 62

Global Presence in attractive markets

Raigarh
Oman

Jeraldaburu
Patratu

Cameroon
Tamnar
Satara

Mozambique

Botswana

Australia

Barbil
Angul
Tensa

Bailadila

South Africa

Coal mine

Iron ore mine

CPP

Steel plant

IPP

Wind project

Presence in resource rich regions well connected with evacuation infrastructure

Copyright @ 2015 Jindal Steel & Power Limited 63

Copyright @ 2015 Jindal Steel & Power Limited 64

JSPL, Raigarh

Copyright @ 2015 Jindal Steel & Power Limited 65

Structural Steel Division, Punjipatra

Copyright @ 2015 Jindal Steel & Power Limited 66

Heavy Machinery Division, Raipur

Copyright @ 2015 Jindal Steel & Power Limited 67

Jindal Power Ltd. 4x600 MW - Tamnar

Copyright @ 2015 Jindal Steel & Power Limited 68

Copyright @ 2015 Jindal Steel & Power Limited 69

JSPL, Angul

2.3 MTPA SMS Concast 8 strand billet caster


Copyright @ 2015 Jindal Steel & Power Limited 70

Pellet Plant, Barbil

Copyright @ 2015 Jindal Steel & Power Limited 71

Copyright @ 2015 Jindal Steel & Power Limited 72

JSPL, Patratu

Copyright @ 2015 Jindal Steel & Power Limited 73

Copyright @ 2015 Jindal Steel & Power Limited 74

Jindal Shadeed, Oman

Jindal Shadeed, Oman

Jindal Shadeed, Oman

Making Sustainability A Focus Priority

78

A Responsible Corporate Citizen


9 PILLARS OF CSR

79

A Responsible Corporate Citizen

As of 31st March2015

80

Health & Safety Best Practices

SAFETY INDUCTION

ON-THE-JOB SAFETY TRAINING

SAFETY REVIEWS

SAFETY AUDITS / INSPECTIONS


81

Health & Safety Best Practices

TOOL BOX MEETINGS

SAFETY AWARDS/REWARDS

MEDICAL EXAMINATIONS/ WORLD CLASS PPEs

MOCK DRILLS

82

Recent Awards & Recognitions

JSPL-Barbil Pellet Plant awarded with most prestigious JIPM award for TPM Excellence

First pellet plant in the world to be conferred with this JIPM award

Jindal Shadeed won following laurels


Prestigious Sultan Qaboos Award for Industrial Excellence by the Ministry of
Commerce and Industry on February 9, 2016
2016 Steel Manufacturing Product Line Strategy Leadership Award, GCC'', at GIL
2016: Middle East, Dammam, Saudi Arabia on February 10, 2016

Jindal Shadeed have received 2 Awards from Midrex


For the achievement of 5 Million tons of production within 4 years of Operation [2011
2014]
For the achievement of Exceptional annual operational availability for the year 2014 98.51%. (Total 3 plants have received the awards out of 72 Midrex DR Plants in the world,
and Jindal Shadeed stands number 2.)

JSPL Raigarh got placed in Limca book of world records for manufacturing longest 121
meter long single piece track rail

JPL received Par Excellence Award for 5S implementation by QCFI on 7th Nov15

83

Award and Accolades for JSPL (2014-15)


National Award for Excellence in Energy Management 2014, CII
National Award for Innovative Training Practices, ISTD Delhi, 2014
Dun & Bradstreet Infra Award 2014 in Power Category
Chhattisgarh Industrial Health & Safety Award, Govt of Chhattisgarh, 2014
Award for Innovative HR Practices, Global HR Excellence Awards, 2015
Best CSR Practice Education, Think Media Inc., 2014
Project Excellence Award, Global Symposium, 2014
Procurement Excellence Award: "Outstanding Leader in Procurement" at
the 2nd Annual CPO Forum India & Awards 2014.
Innovation in Employee Retention Strategies, Greentech Foundation, 2014
2nd Best in Overall Mining Mega Mines Group, Annual Safety Fortnight
Competitions, 2015

84

Other Award and Accolades


2013

International Safety Award with merit 2014 by British Safety Council, UK.
World CSR Congress Award 2013
Greentech CSR Award 2013

2012

Golden Peacock National CSR Award 2012


Ranked No.1 as Wealth Creator in India over a 10- year period (Business World)
Awarded the Dun & Bradstreet- Rolta Corporate Awards 2011

Ranked 3rd in the Metals Category of Business Worlds Indias Most Respected Companies Survey

2011

Received the Forbes Asias Fabulous 50 International Award


Golden Peacock Innovation Management Awards
Greentech Award for 1st Position in Metal & Mining Industries
World HRD Congress CSR Award on women empowerment
Rated the Worlds 2nd Largest Value Creator by Boston Consulting Group (BCG), based on Total
Shareholder Return from 2005-2009, and the largest Value Creator in Mining and Materials category

2010

Received the Forbes Asias Fabulous 50 International Award


Golden Peacock Innovation Management Awards
CSR Excellence Award 2010 by ASSOCHAM for promoting and propagating Corporate Social
Responsibility initiatives
Received the CNBCs Most Promising Entrant into the Big League at IBLA
National Energy Conservation Award

2009

Golden Peacock Innovation Award 2009


Winner of Shrishti Green Cube Award 2009
SAIL HR Excellence Award 2009

85

For any information please contact: Mr. Nishant Baranwal Investor Relations
Tel : +91 124 6612 000
Mobile:+91 8800690255
Email: - [email protected]

86

DISCLAIMER
This presentation may contain certain forward looking statements concerning JSPLs future
business prospects and business profitability, which are subject to a number of risks and
uncertainties and the actual results could materially differ from those in such forward
looking statements.
The risks and uncertainties relating to these statements include, but are not limited to, risks
and uncertainties regarding fluctuations in earnings, our ability to manage growth,
competition (both domestic and international), economic growth in India and the target
countries for exports, ability to attract and retain highly skilled professionals, time and cost
over runs on contracts, our ability to manage our international operations, government
policies and actions with respect to investments, fiscal deficits, regulations, etc., interest and
other fiscal costs generally prevailing in the economy. Past performance may not be
indicative of future performance. We do not undertake to update our forward-looking
statements.
This presentation is not intended, and does not, constitute or form part of any offer,
invitation or the solicitation of an offer to purchase, otherwise acquire, subscribe for, sell or
otherwise dispose of, any securities in JSPL or any of its subsidiary undertakings or any
other invitation or inducement to engage in investment activities, neither shall this
presentation nor the fact of its distribution form the basis of, or be relied on in connection
with, any contract or investment decision. The numbers & the contents in this presentation
are purely indicative and subject to change.
Copyright @ 2015 Jindal Steel & Power Limited 87

THANK YOU

Copyright @ 2015 Jindal Steel & Power Limited 88