Alemco 2012
Alemco 2012
Alemco 2012
services; and energy optimization, which helps to reduce operational costs and
prolong plant life. This latter is achieved through a mixture of energy audits and
advanced energy saving methods. Additionally, Project Quantity Surveying and
Budget and BOQ production are services offered.
Furthering its belief in the value of bringing the best and most innovative
technology, systems designs and equipment to bear on every project, ALEMCO
sees its large, reliable workforce as its greatest asset. It is fully committed to
enhancing its peoples skills and personal development through a programme
of technical and soft skills training at its own MEP Technical Training and
Development Department.
Whatever your project needs, ALEMCO will ensure that it is delivered on time,
within budget and to the highest standards.
Abu Dhabi
Built Up Area
103 000m2
Contract Period
42 months
Contract Value
Location
Client
Obaid Al Jaber
Client Representative
Roya International
Architect / Engineer
KEO International
Interior Designer
Hotel Operator
Traders Hotel
Abu Dhabi
Traders Hotel
Adjacent to the Shangri-La Qaryat Al Beri, Traders Hotel is a contemporary
luxury hotel located on a private beach yet just minutes away from the
airport and city centre. ALEMCO was responsible for all MEP operations
during the design and construction of this 300 bedroom 4 star hotel.
Built Up Area
27 000m2
Contract Period
19 months
Contract Value
Location
Client
Obaid Al Jaber
Client Representative
Roya International
Architect / Engineer
KEO International
Interior Designer
Hotel Operator
Royal Mirage
DUBAI
Royal Mirage
Refurbishment PHASE 1
The complete revamp of 111 rooms at this renowned, distinctive hotel,
including 11 suites, and consisted of all MEP, as well as demolitions, civil
works, and the Fit Out.
Contract Period
4 months
Contract Value
Location
Jumeriah, Dubai
Client
Project Managers
Mirage Mille
Electrical Consultant
CKR
Interior Designer
WAI
Mechanical Consultant
RPW
Royal Mirage
Refurbishment PHASE 2
& BEACH LOUNGE
Total refurbishment of 100 deluxe rooms, 19 executive suites, 2 royal suites
and club lounge, as well as a luxury beach lounge and drinks reception area.
Contract Period
4 months
Contract Value
Project Managers
Mirage Mille
Electrical Consultant
CKR
Interior Designer
WAI
Mechanical Consultant
RPW
DUBAI
Built Up Area
552 000m2
Contract Period
29 months
Contract Value
Location
Client
Project Manager
MACE
Architect
Holfords Associates
Structural Engineer
Mott MacDonald
Interior Designer
KCA International
Quantity Surveyors
EC Harris
Built Up Area
12 000m2
Contract Period
8 months
Contract Value
Location
Client
Design Architect
Interior Designer
Quantity Surveyors
Services offered
ALEMCO combines outstanding professional expertise with an active build
better, buy better approach designed to give its clients better value. Engaging
with ALEMCO assures clients of an all round engineering solution supported by
a pool of talent with in-depth local market understanding and experience.
ALEMCO offers the following services to our key clients:
Electromechanical Construction Services
We can provide a wide range of turnkey solutions to meet your current and
future needs. To ensure that you receive a solution that is project specific for
your development, ALEMCO supports each stage of the process through
pre-coordination, on-going collaboration, professional engineering and
planning. Our proactive approach has earned ALEMCO a reputation as being
a cooperative flexible engineering company with an impeccable history of
delivering successful projects time after time.
Facilities Management
ALEMCO facilities management is highly flexible, and comprises a portfolio of
approaches designed to provide an optimum return on investment coupled
with efficient cost-focused management. We can offer contracting, full
maintenance and call-out facilities management services, with turn-key solutions
and management methods being applied to suit each individual clients
requirements.
Energy Optimization Savings
We have a comprehensive range of methods, tools, techniques and technologies
designed to optimize clients use of energy. ALEMCO is highly experienced in
implementing energy audits on existing buildings, with the focal point being
long term operational cost savings and plant optimization engineering. We
also use tried and tested energy-saving methods, chosen to reflect our clients
environment and priorities, coupled with ongoing plant and maintenance
engineering to help create cost effective energy consumption and extension of
plant life-expectancy.
Abu Dhabi
Qasr Al Sarab
Hotel Resort & Spa
A luxury five star Arabian retreat in Abu Dhabis Empty Quarter, Qasr Al
Sarab is inspired by glorious Arabian dcor amid the charm of the Liwa
Desert. The development features a five star hotel, a luxury health spa and
conference centre.
Built Up Area
55 000m2
Contract Period
24 months
Contract Value
Location
Client TDIC
Project Manager
Architect Dubarch
Structural Engineer
Halcrow Yolles
Interior Designer
Quantity Surveyors
Hotel Operator
Anantara
Manarat Al Saadiyat
Abu Dhabi
Manarat Al Saadiyat
A prestigious and purpose-built exhibition area incorporating several art
galleries, including ones for use by the Louvre and Guggenheim museums, as
well as restaurants, retail and an experience centre for TDIC.
Built Up Area
14 000m2
Contract Period
6 months
Contract Value
Location
Client TDIC
Client Representative
AECOM
Architect AEDAS
Engineer
Quantity Surveyors
Reel Cinema
Dubai
Reel Cinema
Reel Cinemas is the premier provider of high quality cinema experiences
and the opening of this six-screen cineplex brought the concept of
boutique cinemas to the UAE. With the design and construction
following the Hollywood Chic concept, it adds to the ambience and
appeal of these business-class cinemas.
Built Up Area
3 200m2
Contract Period
6 months
Contract Value
Location
Client
EMAAR Properties
Client Representative
Quantity Surveyors
Omnium International
Marina Plaza
DUBAI
Marina Plaza
The 41 floor shell and core commercial office tower Marina Plaza is part of the
Dubai Marina Mall, a complex which also incorporates a 180-outlet modern
shopping and entertainment destination, the Dubai Marina Mall Hotel &
Serviced Apartments, and an eight-storey tower dedicated to restaurants.
Built Up Area
160 000m2
Contract Period
22 months
Contract Value
Location
Client
EMAAR Properties
Project
Architect
DP Architects
Structural Engineer
Meinhardt
Interior Designer
KCA International
Quantity Surveyors
DG Jones
Abu Dhabi
Built Up Area
20 000m2
Contract Period
10 months
Contract Value
Location
Abu Dhabi
Client
SCADIA / ADAC
Project Manager
Parsons International
Architect Corgan
Structural Engineer
TYLIN
Quantity Surveyors
Davis Langdon
Vision
Dedicated to becoming the best construction company in our geographical area of operation.
Values
Integrity
Courage
Reliability
We value our people
Strategy
Timeously execute select building projects, by utilising proactive management skills with carefully
selected clients and consultants in order to achieve an optimum return.
Dubai
Built Up Area
580 000m2
Contract Period
29 months
Contract Value
Location Dubai
Client
Government of Dubai,
Architect
Structural Engineer
Quantity Surveyors
TTS
Al Falah Community
Development
The new sustainable community for UAE nationals, part of the Plan
Abu Dhabi 2030 directive, provides around 5,000 homes for middle-income
UAE families. Its innovative design features five villages with many open
parks. Each village has its own centre with schools and mosques. The town
centre will be the focal point of the entire development and will contain
civic buildings, a retail mall, a hospital, commercial office space, a hotel and a
sports and leisure complex.
BBuilt Up Area
2 752 Villas
Contract Period
33 months
Contract Value
Location
Abu Dhabi
Client ALDAR
Main Contractors
El Seif Engineering Contracting
and SPK Construction
Consulting Engineers
*in partnership with El Mech
Fluor Engineering
Abu Dhabi
Location
Abu Dhabi
Client
In just a few short years, ALEMCO has become recognised as one of the UAE
s leading mechanical, electrical and plumbing companies. Over the course
of carrying out a comprehensive portfolio of successfully delivered work on
landmark construction projects, we have built up strong relationships with
major developers and of course are able to integrate our work with any of our
sister companies within the ALEC Group.
Our view however, and that of our clients, is that our success is based on more
than just close relationships and collaborative working. Our team of highly
qualified senior managers have a wealth of experience in overseeing building
projects across a wide range of countries, giving them excellent insight into
Dubai
3601 Marina Plaza
Dubai Marina
PO Box 27639, Dubai, UAE
Tel: +971 (0)4 429 0599
Fax: +971 (0)4 429 0216
Oman
Villa 1, 76 Al Ilam Street, Madinat Al Ilam
P.O. Box 198, PC 103, Bareeq Al-Shatti
Muscat, Sultanate of Oman
Tel: +968 (0)2 200 5570
Fax: +968 (0)2 200 5571
Abu Dhabi
Villa 1, Marakash Residence
Khalifa City A
PO Box 45336, Abu Dhabi, UAE
Tel: +971 (0)2 556 7540
Fax: +971 (0)2 556 3446
Qatar
GRIDCO III Building, Penthouse
C Ring Road, Al Muntazah Area
P.O. Box 23007, Doha, Qatar
Tel: +974 (0)4 441 1880
Fax: +974 (0)4 441 1885
www.alemco.ae