Integrated Project - The Field Lifecycle
Integrated Project - The Field Lifecycle
Integrated Project - The Field Lifecycle
Page 1
Page 2
Page 3
PETROLEUM SYSTEM
Definition
A petroleum system encompasses
a pod of active source rock and all
genetically related oil and gas
accumulations.
Conventional system
Elements are separate
Unconventional system
Number of Elements can be the
same
E.g. shale source
Elements
Source rock
Reservoir rock
Seal rock
Overburden
Page 4
BIGGER PICTURE
Page 5
BIGGER PICTURE
Page 6
Capital Investment:
10(s) Mio. USD
Day rate:
10(s) Tsd. USD
Offshore rig
Page 8
Page 9
Development Lifecycle
Page 10
DEVELOPMENT LIFECYCLE
Exploration
Appraisal
Development
Production
Abandonment
Page 11
EXPLORATION
is about finding oil and gas fields. Main goal is to identify
and deliver commercially viable field development
opportunities. The following geological and geophysical
(G&G) activities would take place:
Page 12
EXPLORATION
Page 13
APPRAISAL
Exploration phase of life cycle closely intertwines with the
next stage of processing which is Appraisal . The objective
of Appraisal is to obtain information about the reservoir in
order to make a decision whether or not to proceed with
development of the field. This stage comprises the following
activities:
Page 14
DEVELOPMENT
The initial phase of field development planning could involve
the assessment of more than one development option. Four
components of a development plan can be used to describe
each option:
Reservoir : number, location, type of wells; assessment of oil
recovery mechanism; assessment of production over the
development stage
Wells : the design of wells to meet production requirements
Facilities: process facilities, infrastructure, terminal/export facilities
Operating and Maintenance strategies: manning level, daily
production level, support requirements, for ex. helicopters, supply
vessels
Page 15
DEVELOPMENT
Page 16
DEVELOPMENT
Page 17
DEVELOPMENT
Page 18
DEVELOPMENT
Page 19
DEVELOPMENT
Page 20
PRODUCTION PHASE
Production phase is targeted at bringing the well fluids to the
surface and preparing them for use in refinery or processing
plant. All production and maintenance activities would be
carried out to meet strict safety and environmental policies
and procedures . The main activities consist of the following:
regulate production and injection to meet approved plans for the quantity and
quality of product.
monitor and record all information to manage the reservoir, wells and
facilities
This could lead to further reservoir development or modifications to the
facilities
plan and schedule all production and maintenance activities to minimise
production deferment and operating costs
carry out maintenance to safeguard the technical integrity of all wells and
facilities and ensure their availability over the life of the field.
Page 21
DEVELOPMENT
Page 22
PRODUCTION PHASE
Page 23
PRODUCTION PHASE
Page 24
PRODUCTION PHASE
Page 25
PRODUCTION PHASE
Page 26
PRODUCTION PHASE
Page 27
ABANDONMENT PHASE
The end of the life of the field is when it is no longer economic for the
operator to continue production, i.e. when the operating costs exceed
the revenue from the sale of production.
It is becoming increasingly common around the world that offshore
facilities must be dismantled and removed and the site restored to its
original condition. The major activities during the decommissioning
phase are:
plug and abandon wells by putting cement plugs into the wells at various
depths and remove the well-head and casing to a depth of about 2 metres
below the surface or seabed
dismantle and remove the jacket and all facilities from the site, ensuring that
there is no contamination of the environment from any oil or waste material
remaining in the process facilities
restore the site to its original condition
conduct a final environmental impact study
Page 28