Rsae ITP QA: Document Review and Cover Sheet Company: Construction Contractor

This document provides a review and cover sheet for the inspection and test plan (ITP) for low voltage bus duct. It includes details of the construction contractor, engineering contractor, and project information. The ITP describes three key activities to be inspected: installation check of the panel assembly, bus duct connection, and phase connection; insulation resistance measurement; and involves Renaissance Construction, Mitsubishi Heavy Industries, and the owner in witnessing, reviewing, and surveillance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
573 views5 pages

Rsae ITP QA: Document Review and Cover Sheet Company: Construction Contractor

This document provides a review and cover sheet for the inspection and test plan (ITP) for low voltage bus duct. It includes details of the construction contractor, engineering contractor, and project information. The ITP describes three key activities to be inspected: installation check of the panel assembly, bus duct connection, and phase connection; insulation resistance measurement; and involves Renaissance Construction, Mitsubishi Heavy Industries, and the owner in witnessing, reviewing, and surveillance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

DOCUMENT REVIEW AND COVER SHEET

Construction Contractor:

Company:

Engineering Contractor:

Engineering and Technical Services:

Review:

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Gasprom Neftehim Salavat Acrylic Acid / Acrylates


Plant (RSAE) Project Bashkortostan, Russian
Federation

PROJECT
CONTRACT NO
DOCUMENT TITLE

ITP for LV BUS DUCT

DOCUMENT NUMBER
DOCUMENT
DESCRIPTION
Status

RSA
- IT - QA E
P
Inspection and Test Plan (ITP)

Status

Code Description

Code

Revieved
Engineer:

REV.

APPROVED WITHOUT COMMENT


REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO
INCORPORATON OF CHANGES INDICATED.
REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY
NOT PROCEED
INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY
PROCEED
CANCELLED/SUPERSEDED

NAME

SIGN

DATE

Remarks or Comments:

A1

Issued for Approval


Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Rev.

Amendment

Prepared

Checked

Approved

Date

Company:

Construction Contractor:

Engineering Contractor:

Engineering and Technical Services:

Project Title:

Gasprom Neftehim Salavat


Acrylic Acid / Acrylates Plant (RSAE) Project
Bashkortostan, Russian Federation
Document Title:

Inspection and Test Plan


LV BUS DUCT

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

REVISION SHEET
Revisio
n
A1

Description of changes

Page

First Issued For approval

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan


LV BUS DUCT
Issue
Date:

No

Revisio
n:

Doc. Number:

DESCRIPTION OF ACTIVITY

CONTROL
DOCUMENT

ACCEPTANCE
CRITERIA

VERIFICATION
DOCUMENT

Page:

1 of 1

INVOLVEMENTS
OWN
RC MHI
ER

Installation Check
1- Inspect panel assembly for
1.1

2345-

alignment, level, tightness of


bolts
Inspect bus duct connection
(Torque check and marking)
Check frame earthing
Inspect termination
Check bus duct supports

1.2

Check phase connection

1.3

Insulation resistance measurement

DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201

Correct Installation

Correct phase connection

500 VDC, 1 Min


>10MOhm

RSAE-FRM-216

RSAE-FRM-216

RSAE-FRM-216

Attachment
1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT
LEGEND
RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, OWNER: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check),