DOCUMENT REVIEW AND COVER SHEET
Construction Contractor:
Company:
Engineering Contractor:
Engineering and Technical Services:
Review:
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
Gasprom Neftehim Salavat Acrylic Acid / Acrylates
Plant (RSAE) Project Bashkortostan, Russian
Federation
PROJECT
CONTRACT NO
DOCUMENT TITLE
ITP for LV BUS DUCT
DOCUMENT NUMBER
DOCUMENT
DESCRIPTION
Status
RSA
- IT - QA E
P
Inspection and Test Plan (ITP)
Status
Code Description
Code
Revieved
Engineer:
REV.
APPROVED WITHOUT COMMENT
REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO
INCORPORATON OF CHANGES INDICATED.
REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY
NOT PROCEED
INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY
PROCEED
CANCELLED/SUPERSEDED
NAME
SIGN
DATE
Remarks or Comments:
A1
Issued for Approval
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
Rev.
Amendment
Prepared
Checked
Approved
Date
Company:
Construction Contractor:
Engineering Contractor:
Engineering and Technical Services:
Project Title:
Gasprom Neftehim Salavat
Acrylic Acid / Acrylates Plant (RSAE) Project
Bashkortostan, Russian Federation
Document Title:
Inspection and Test Plan
LV BUS DUCT
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
REVISION SHEET
Revisio
n
A1
Description of changes
Page
First Issued For approval
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project
Inspection and Test Plan
LV BUS DUCT
Issue
Date:
No
Revisio
n:
Doc. Number:
DESCRIPTION OF ACTIVITY
CONTROL
DOCUMENT
ACCEPTANCE
CRITERIA
VERIFICATION
DOCUMENT
Page:
1 of 1
INVOLVEMENTS
OWN
RC MHI
ER
Installation Check
1- Inspect panel assembly for
1.1
2345-
alignment, level, tightness of
bolts
Inspect bus duct connection
(Torque check and marking)
Check frame earthing
Inspect termination
Check bus duct supports
1.2
Check phase connection
1.3
Insulation resistance measurement
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
Correct Installation
Correct phase connection
500 VDC, 1 Min
>10MOhm
RSAE-FRM-216
RSAE-FRM-216
RSAE-FRM-216
Attachment
1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT
LEGEND
RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, OWNER: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check),