TUNNEL DESIGN STEPS

DR. GYANENDRA LAL SHRESTHA


CEO, NYADI HYDROPOWER LTD.
19 DECEMBER 2014

3 Main Effects of Underground Excavation (Tunnel


X-Sections)

Rock block falls


locally

Water runs in to
tunnel

Stress concentration
after excavation

Preliminary Support Estimation By Empirical Method

Final support chart for Headrace Tunnel.


700

600

Depth

500
400
Squeezing zone

300
200
100

Support type III

Support type II

Support type I

Support type IV

0
0.01

0.1

Q*

10

100

Empirically Estimated Preliminary Supports

Span/
Structure
Height (m)

Headrace
tunnel

10.3

ESR

1.6

De

6.4

25 mm dia
Rock Bolt
Length (m)

Class I
15<Q

Class II
4<Q<15

Class III
0.4<Q<4

Class IV
0.04<Q<0.4

SC and RB as
required

5cm SC
2m cc RB

10cm SC
1.5m cc
RB

15cm SC
1.2m cc RB

Assessment of stress condition


Depth (m)

100

200

300

400

500

600

700

Unit weight (kN/m3)

25

25

25

25

25

25

25

Major Principal Stress 1


(MPa)

2.5

7.5

10

12.5

15

17.5

Unconfined Compressive
Strength (UCS) - ci

22

22

22

22

22

22

22

Maximum Tangential
Stress ()

10

15

20

25

30

35

ci/( 1)

8.8

4.4

2.9

2.2

1.7

1.5

1.3

/ci

0.2

0.4

0.7

0.9

1.1

1.4

1.6

SRF Category

J/K

K/L

L/M

O/N

O/N

O/N

Overburden and Q* values for support Class I, II, III and IV


Support
Class

Cover (m)
100

200

300

400

500

600

700

SRF

Class I

15

15

30

45

60

75

90

Class II

12

16

20

24

Class III

0.4

0.4

0.8

1.2

1.6

2.4

Class IV

0.04

0.04

0.08

0.12

0.16

0.2

0.24

Preliminary Support Class Boundaries With


Q* and Overburden
800
700
600
Overburden (m)

500

Support I
Support II
Support III
Support IV

400
300
200
100
0
0.01

0.1

Q* Value

10

20

Class II, 600m, GSI 80 at 100% Relaxation


Sigma 1
MPa
0.00
3.00
6.00
9.00

15

12.00
15.00
18.00
21.00
24.00
27.00

10

30.00
Shear
Tension
Both

Shear
Tension

250

255

260

265

270

275

280

285

Axial force in Bolt - Class II, 600m, GSI 80 at


100% Relaxation

Phase2 Output Support Class Boundaries with


Q* & Overburden depth
Support
Class

Cover (m)
0

100

200

300

400

500

600

Class I

15

15

20

30

45

70

106

Class II

4.2

15

25

40

Class III

0.4

0.4

0.6

0.8

1.2

Class IV

0.04

0.04

0.05

0.08

0.12

0.2

0.3

Revised Support Requirements for Different


Rock Class

Structure

Headrace
tunnel

Span/
Height
(m)

10.3

ESR

1.6

De

6.4

25 mm dia
Rock Bolt
Length (m)

Class I
15<Q

SC and RB
as required

Class II
4<Q<15

Class III
0.4<Q<4

Class IV
0.04<Q<0.4

15cm SC,
2m cc RB

15cm SC,
1.5m cc
RB

20cm SC,
1.0m cc RB,
Steel ribs at
2m spacing

Boundaries for support class I to IV with Q*


Verses Overburden
700
600

Overburden (m)

500
400

Support I
Support II
Support III
Support IV

300
200
100

0
0.01

0.1

Q* Value

10

100

Support Class Boundary Before and After Analysis


Tunnel supports
700
600
Support I
Support II
Support III
Support IV
Support I
Support II
Support III
Support IV

Overburden (m)

500
400
300
200
100
0
0.01

0.1

1
Q* Value

10

100

Hoek & Marinos Method (2000)

ci {1.029+0.025 e (-0.1 mi) }GSI


= i/do = [0.002-0.0025 pi/po] (cm /po)(24 pi/po -2)
cm

= (0.0034 mi 0.8)

Squeezing Based on Strain - Hoek and Marinos (2000)


Depth (m)

55

69

155

330

525

640

Q*

0.02

0.04

0.4

15

25

Major principle stress 1 MPa

1.375

1.725

3.875

8.25

13.125

16

GSI

10

15

36

56

68

73

Percentage Strain in *

Squeezing Demarcation Line


700
600

Overburden (m)

500

400
300
200

100
0
0.01

0.10

1.00
Q* Value

10.00

Details of support for squeezing tunnel

Capacity Check of RC Liner - Squeezing


Tunnel, 500m, GSI 56 at 100% Relaxation

Final support chart for Headrace Tunnel.


700

600

Depth

500
400
Squeezing zone

300
200
100

Support type III

Support type II

Support type I

Support type IV

0
0.01

0.1

Q*

10

100

Primary Supports for Headrace Tunnel

Structure

Headrace
tunnel

Span/
Height
(m)

10.3

ESR

1.6

De

6.4

25 mm dia
Rock Bolt
Length (m)

Class I
15<Q

Class II
4<Q<15

Class III
0.4<Q<4

Class IV
0.04<Q<0.4

Squeezing
tunnel

10cm SC
15cm SC
and RB as
2m cc RB
required

15cm SC
1.5m cc
RB

20cm SC
1.0m cc RB,
Steel ribs at
2m spacing

20cm SC,
2.0m cc
RB, 50cm
concrete

Unlined Tunnel

Shotcrete and rockbolt support

Tunnel With Steel Rib Supports

Concrete Lined Tunnel

Conclusion and recommendation


The support chart considers two variables
namely, overburden depth and Q*-value, could be more
realistic.
It prescribes support needed for squeezing tunnel also.
As it also includes outcomes of Numerical models , it
helps to make construction period optimum and
project cost economic.
It is recommended to develop similar chart latest in the
detailed design.