GL Shrestha Tunnel Design Steps
GL Shrestha Tunnel Design Steps
GL Shrestha Tunnel Design Steps
Water runs in to
tunnel
Stress concentration
after excavation
600
Depth
500
400
Squeezing zone
300
200
100
Support type II
Support type I
Support type IV
0
0.01
0.1
Q*
10
100
Span/
Structure
Height (m)
Headrace
tunnel
10.3
ESR
1.6
De
6.4
25 mm dia
Rock Bolt
Length (m)
Class I
15<Q
Class II
4<Q<15
Class III
0.4<Q<4
Class IV
0.04<Q<0.4
SC and RB as
required
5cm SC
2m cc RB
10cm SC
1.5m cc
RB
15cm SC
1.2m cc RB
100
200
300
400
500
600
700
25
25
25
25
25
25
25
2.5
7.5
10
12.5
15
17.5
Unconfined Compressive
Strength (UCS) - ci
22
22
22
22
22
22
22
Maximum Tangential
Stress ()
10
15
20
25
30
35
ci/( 1)
8.8
4.4
2.9
2.2
1.7
1.5
1.3
/ci
0.2
0.4
0.7
0.9
1.1
1.4
1.6
SRF Category
J/K
K/L
L/M
O/N
O/N
O/N
Cover (m)
100
200
300
400
500
600
700
SRF
Class I
15
15
30
45
60
75
90
Class II
12
16
20
24
Class III
0.4
0.4
0.8
1.2
1.6
2.4
Class IV
0.04
0.04
0.08
0.12
0.16
0.2
0.24
500
Support I
Support II
Support III
Support IV
400
300
200
100
0
0.01
0.1
Q* Value
10
20
15
12.00
15.00
18.00
21.00
24.00
27.00
10
30.00
Shear
Tension
Both
Shear
Tension
250
255
260
265
270
275
280
285
Cover (m)
0
100
200
300
400
500
600
Class I
15
15
20
30
45
70
106
Class II
4.2
15
25
40
Class III
0.4
0.4
0.6
0.8
1.2
Class IV
0.04
0.04
0.05
0.08
0.12
0.2
0.3
Structure
Headrace
tunnel
Span/
Height
(m)
10.3
ESR
1.6
De
6.4
25 mm dia
Rock Bolt
Length (m)
Class I
15<Q
SC and RB
as required
Class II
4<Q<15
Class III
0.4<Q<4
Class IV
0.04<Q<0.4
15cm SC,
2m cc RB
15cm SC,
1.5m cc
RB
20cm SC,
1.0m cc RB,
Steel ribs at
2m spacing
Overburden (m)
500
400
Support I
Support II
Support III
Support IV
300
200
100
0
0.01
0.1
Q* Value
10
100
Overburden (m)
500
400
300
200
100
0
0.01
0.1
1
Q* Value
10
100
= (0.0034 mi 0.8)
55
69
155
330
525
640
Q*
0.02
0.04
0.4
15
25
1.375
1.725
3.875
8.25
13.125
16
GSI
10
15
36
56
68
73
Percentage Strain in *
Overburden (m)
500
400
300
200
100
0
0.01
0.10
1.00
Q* Value
10.00
600
Depth
500
400
Squeezing zone
300
200
100
Support type II
Support type I
Support type IV
0
0.01
0.1
Q*
10
100
Structure
Headrace
tunnel
Span/
Height
(m)
10.3
ESR
1.6
De
6.4
25 mm dia
Rock Bolt
Length (m)
Class I
15<Q
Class II
4<Q<15
Class III
0.4<Q<4
Class IV
0.04<Q<0.4
Squeezing
tunnel
10cm SC
15cm SC
and RB as
2m cc RB
required
15cm SC
1.5m cc
RB
20cm SC
1.0m cc RB,
Steel ribs at
2m spacing
20cm SC,
2.0m cc
RB, 50cm
concrete
Unlined Tunnel
THANKS