Manukau High Level Project Plan
Manukau High Level Project Plan
CONTENTS
02
PANUKU DEVELOPMENTS
DEVELOPMENT AUCKLAND
AUCKLAND
1. Introduction
07
4. Vision
38
1.1 Mihi
08
5. Goals
42
09
6.
Key Principles
49
1.3
10
7.
Key Strategies
52
2.
Context
14
8. Dependencies
60
2.1
Geographical Context
15
9.
65
2.2
Property Ownership
16
68
18
69
2.4 Planning
22
70
26
71
27
11. Funding
74
28
12. Phasing
80
3.
32
86
Renewal Approach
12.1 Timeframes
03
INTRODUCTION
04
05
1.0 INTRODUCTION
When it comes to transforming Manukau on a huge scale,
we first need to Start with the Heart.
Thats not just because Manukaus proposed vision is to become The Thriving Heart and Soul of
the South. It also refers to the 20ha portfolio of land within Manukau Central that Auckland Council
controls, providing robust influence for effecting change.
In total, 600ha in Manukau Central and Wiri has been chosen as a Transform project of urban
regeneration, to be led by Panuku Development Auckland (Panuku).
Manukau is the largest of Aucklands 10 metropolitan centres by employment, and the closest to
Auckland Airport, which is significant for its growth prospects. It is generally infrastructure-ready
and provides strong employment growth through its supporting employment zone in Wiri. This
underpins its role as Aucklands southern gateway, giving it a compelling position from which to
attract new market attention as a location of opportunity.
The Manukau story has long been one of unique promise. Its combination of deep Mori heritage,
the worlds Pasifika hub, geographical features of interest, and creative and economic potential
makes it unlike any other place in New Zealand.
South Auckland has been identified as the regions biggest opportunity, yet it also faces many socioeconomic challenges. As Auckland grows, it becomes even more vital that this part of the region
fulfils its potential.
Urban regeneration of this scale requires leadership and collaboration to provide strategic
responses to achieve the vision for Manukau. Its our challenge to refine an integrated approach to
development that will help empower communities, lift local well-being and build high-quality, peopleoriented urban environments.
06
07
1.1 MIHI
NAU MAI TAKU ITI. PIKI MAI E TAKU RAHI.
NKU KOE I TIKI ATU I TE PAE-O-TE-RANGI.
KA TIA MAI, KA KMEA MAI
KIA EKE TANGAROA, EKE PANUKU.
Panuku, panuku, kia haumi e, kia hui e
kia ara mai he tiki ngpara.
08
TRANSFORM
Creating change through urban renewal.
We lead the transformation of select parts of our
region; working alongside others and using our
custodianship of land and planning expertise.
E.g. Wynyard Quarter
UNLOCK
Unlocking development potential for others.
We are the facilitator; using our relationships to break
down barriers and influencing others, including our
Council family, to create development opportunities.
E.g. Papatoetoe
SUPPORT
Making the most of what weve got.
09
LIKE THE
NAME SAYS
Were the first Auckland Council organisation whose name
represents what makes us unique as a New Zealand-based company:
our connection to Mori culture and identity.
Development Auckland clearly states what our organisation is about,
while Panuku is an abbreviated form of the whakatauki, or proverbial
saying, Eke Panuku, Eke Tangaroa!
This saying acknowledges unseen energies from the realm of the land
and sea, which are often called upon through Mori oratory traditions
to help invigorate, inspire and manifest success, excellence and
progress within groups.
Our organisation, like a waka, not only requires strength to move
forward, but skill to navigate, balance to ride smoothly and
teamwork to propel.
The next steps after the HLPP involve more detailed project planning, including engagement and
communications plans, project planning and Framework Planning. This will be followed by detailed site
feasibility and assessments and business cases as required.
10
11
CONTEXT
12
PANUKU DEVELOPMENTS
DEVELOPMENT AUCKLAND
AUCKLAND
13
2.0 CONTEXT
TH
RE
BOU
NR
A
AG
RU
NDA
RY
RD
RD
SPORTS
BOWL
KEY
UI R
HIN
PU
TE
GI R
AN
IRIR
Project Area
NK
ISH D
ND
CAVE
ET
VE
DA
OO
NW
RO
METROPOLITAN
CENTRE
E
AV
Manukaus metropolitan centre has a large Westfield shopping centre, a large district court and police
station, many Council facilities, and commercial and industrial businesses in and around the centre.
Together they employ around 17,000 workers on a daily basis. Two major tertiary institutions, Manukau
Institute of Technology (MIT) and Auckland University of Technology (AUT), have opened new
campuses here, which will attract about 10,000 students when complete in 2017.
CA
R
PLU
Although declining in importance, manufacturing remains Manukaus largest industry sector, with
transport, postal and warehousing; wholesale trade; and healthcare and social assistance sectors
emerging in recent years. Its large metropolitan centre continues to serve these industries and the
wider community.
NR
TI O
STA
AU
K
U
N
MA
OAD
SO
WIRI
RN
RD
HE
RD
B
HO
R
TO
MO
ES
UC
DR
TH
NR
TIO
STA
IRI
UT
SO
GR E AT
Y
MOTORWA
STERN
H-WE
SOUT
Y
WA
ILL
E
AV
RS
KER
RD
SUPER CLINIC
SR
AM
OR
ETY
G
DAL
DR
14
SR
WN
BRO
15
TH
The Transform Manukau project area aligns closely with the areas of focus for various
Council and community partnerships, and with Crown landholdings.
RE
Housing New Zealand (HNZ) three communities in Rata Vine Drive, Inverell Avenue and Trevor
Hosken Drive, about 52ha (gross)
MOE
Pacific Events Centre, 13.6ha contains Wero, car parking and stormwater area
Hayman Park, 10.3ha
Four parcels of land totalling 8.6ha cleared for sale and available for development
Westfield car parking freehold, 8.3ha leased
Manukau Institute of Technology site, 2.3ha leased for development
N
RO
New Zealand Transport Agency (NZTA) several remnants of the motorway corridors of SH20 and
SH1 could be considered later in Framework Planning
R
ION
TAT
US
A
K
MANU
HNZ
TH
HNZ
RD
DHB
HNZ
MOE
Ministry of Education
SHA
RD
Y
WA
R
TO
MO
ES
SHA
ILL
E
AV
HNZ
D
R
RS
KER
DHB
D
SR
AM
OR
MOE
ETY
G
DAL
DR
RN
UC
DR
WIR
Manukau Plaza and Karoro Court, 0.7ha some of this was considered for development in previous
plans for Manukau.
16
EVENTS
CENTRE
NR
O
ATI
I ST
AUT
HE
UT
SO
Together, the Council and Crown entities control more than a third of the project area; over 200ha of
the total 600.
Historic Redoubt Road reserves and a cemetery at 10 Manukau Station Road, 1.2ha
The Council also leases the ground and first floors of a building fronting Manukau Plaza for Manukau
Library and the South Auckland Research Centre.
OAD
Y
MOTORWA
STERN
H-WE
SOUT
B
HO
Three Council service properties, totalling 1.7ha Kotuku House, a Housing for Older People site,
and the Civic building and immediate grounds
Crown Entities
AVE
PARK
OD
WO
SO
IRI
WIRI L T
ISH D
ND
CAVE
There are several other entities that either lease or own space such as the Ministry for Social
Development, however these are not as significant as the above.
Council
I RD
G
RAN
Private
GR E AT
Rainbows End freehold, 7.5ha leased until 2034 (excludes Clist Crescent car park)
Project Area
RD
PU
VE
TA
Puhinui/Wiri Stream, 13.7ha runs 2.7km from State Highway 20 (SH20) to State Highway 1 (SH1)
through the Manukau Super Clinic site
Counties Manukau District Health Board the 49ha Super Clinic site presents a particularly strong
opportunity for regeneration and health-related housing
TE
AUT
U
HIN
KE
Manukau Sports Bowl, 21ha large, multiple sport facility, built for the 1990 Commonwealth Games
RY
SPORTS
BOWL
N
PLU
Auckland Council controls about 40 properties totalling 95ha within the project area.
NDA
RD
I RD
The following Crown entities own property within the project area:
NR
A
AG
RU
BOU
SR
WN
BRO
17
18
19
5. Manukau Plaza
This empty and underused civic space could provide an active
and attractive gathering space for the area, creating vibrancy
and a local heart.
20
21
2.4 PLANNING
Previous planning for Manukau Central has been extensive. It is a major metropolitan and
sub-regional centre a CBD of the south and long identified as a key location for growth
and development.
However, the area has underperformed and not realised its
potential. Transformation will not happen by market forces, liberal
planning rules or advocacy alone. We need the Council, ideally
together with the Government (Crown entities), to respond to
the issues and challenges facing Manukau Central and its Wiri
suburban area to the south. The intervention will involve urban
regeneration, renewal and housing.
This Panuku High Level Project Plan (HLPP) includes the
following assumptions related to planning for Manukaus
transformation.
Population growth continues at a high level in Auckland,
maintaining ongoing demand for residential and commercial
property development.
Identified development sites that have been cleared by the
Council for sale will become available for use.
Previous planning is generally supported and provides a
platform for Framework Planning to review and consider.
The vision, goals and key strategic moves are broadly aligned
with other entities, parties and stakeholders.
The resources and funding required to deliver the
transformation project, as set out in this HLPP, are available.
Manukau is at the centre of significant interagency focus and
collaboration through:
The Southern Initiative (TSI)
Council designation as a Spatial Priority Area (SPA)
22
23
The Manukau project area is also the location for the following
initiatives in the planning stage:
Kotuku House refurbishment a major refurbishment of the
Council service property to modernise the building, make the
floors more open plan, and redesign the ground floor to reflect
the standard of upgrades to the Bledisloe House service centre
in central Auckland. It will take 12 months, with temporary
accommodation and customer service in the Civic.
20 Barrowcliffe Place subdivision for 11 blocks is being sought
for up to 145 sites on this 5ha property.
31-33 Manukau Station Road involves a 7000sqm balance of
land from the bus station project. Concept planning for three to
four mixed-use residential and commercial buildings of 10-12 levels.
Pacific Events Centre Special Housing Area (SHA) planning
vision for 800 units, including two hotel sites; so far, consent
sought for the first stage of 50 units.
Lakewood Plaza a 15-level, mixed-tenure residential development
on the old Valentines site; in presale and concept stages.
Manukau Station Road bus priority upgrades support the
bus interchange project. Will deliver bus lanes in each direction,
rationalise intersections and try to improve the environment for
pedestrians.
Hayman Park stage 1 playground in developed design stage,
this project will provide activity in the park to help address
safety concerns. Includes a BMX pump track, skate park
upgrade, flying fox, toilets and covered seating. Budgeted for
implementation in 2017.
PLANNING: STATUTORY AND NON-STATUTORY
Manukau is coming back into focus after some years on the
periphery of planning focus. Its development strengths are
founded in property ownership, infrastructure and location.
24
A local board plan guides decision-making and actions for the next
three years. It informs the boards decisions on local activities, and
enables it to represent the communitys interests and preferences
on regional plans.
25
This change is due to increasing house prices, a shortage of residential land for development, and a
strengthening student and worker population base.
Currently, there are six apartment projects in and around the area, which will create 404 mostly studio
units by 2017. Two of these, Lakewood Court and Lakewood Plaza, are within the project area, creating
a total of 82 studio and 151 two-bedroom apartments.
Future demand through to 2043 is expected to be about 1500 new dwellings within the project area,
500 within the centre. The table below summarises the population and dwelling counts in 2013 and
2043 for the centre and the scope area as:
26
MANUKAU CENTRE
PROJECT AREA
621
5865
Current dwellings
285
1734
2344
9548
Forecast dwellings
772
3316
Two of the key strategies for Panuku, outlined later in this HLPP, relate to improving the central areas
competitive position in the housing market and prompting the private sector to supply housing choice,
considering the market shift from family dwellings to smaller investor-oriented apartments.
These key strategies are supported by initiatives to introduce higher-density residential into the
central area, through underused sites such as ground level car parks, which are also critical to growing
commercial activity in the centre.
The market context for Manukau indicates significant challenges to delivering successful initiatives
from these strategies on the back of the aspiration to introduce various types of apartments. By
their nature these developments are costly and carry higher risk, particularly in developing larger
apartments to add to the diversity of the housing market.
Manukaus commercial market is strong, supported by a robust industrial base and growing residential,
worker and student demand. The vacancy rates on retail and office space will remain low, due to
limited supply and the pull factor of Manukaus strategic location.
Demand for investment in this market is expected to increase under the current favourable business
conditions declining yields, increasing values, low interest rates and vacancy rates, and growing
demand due to future developments (e.g. Te Papa Manukau).
The key sectors for commercial activities, whether or not integrated with apartment developments in
and around the central area are core retail, medical services, creative services and ICT, real estate and
construction services.
Panukus development realisation and implementation plan will need to address this critical market
dynamic. We will consider how best we enable residential apartment delivery in Manukau, including
managing the risk exposure to both Panuku and private sector partners. Panuku will need to act
effectively within the continuum between realistic development and aspirational outcomes.
27
28
29
30
31
32
OPPORTUNITIES
CHALLENGES
OPPORTUNITIES
CHALLENGES
In short, Manukau Central has failed to present a strong identity and brand to the region as a desirable
metropolitan centre of scale and significance in which to invest. This weakness is also its opportunity, as
land values are in a trough and more affordable than other centres and suburban areas of south Auckland.
These factors make Manukau a prime location for urban transformation and regeneration. And in
responding to them, we have an opportunity to help address underlying socio-economic, housing and
crime issues.
33
COMMERCIALLY VIABLE /
MARKET ATTRACTIVE
OPPORTUNITIES
CHALLENGES
OPPORTUNITIES
CHALLENGES
OPPORTUNITIES
CHALLENGES
OPPORTUNITIES
CHALLENGES
Aligning priorities
34
PARTNERSHIPS
Aligning budgets
35
VISION
36
37
4.0 VISION
Manukau provides the basic ingredients that make it ready for
effective urban regeneration. Change at scale and pace is needed
and is achievable.
Sections 4 through 7 outline the recommended vision, goals, principles and strategies for regeneration
in the Transform Manukau project area. They include a high-level approach to how we stage it, with an
emphasis on the short-term recommendations and site development realisation.
38
MANUKAU:
THE THRIVING
HEART AND SOUL
OF THE SOUTH
Manukau metropolitan centre becomes the thriving heart of our
area: an attractive visitor destination, business centre and place
to shop, live, learn, work and play.
39
GOALS
40
41
5.0 GOALS
GOAL 1
GOAL 2
GOAL 3
GOAL 4
GOAL 5
GOAL 6
42
43
GOAL 7
GOAL 8
44
45
KEY PRINCIPLES
46
47
48
GOVERNANCE
Establish a strong, inclusive and accountable governance structure that enables and mandates Panuku to
deliver the vision in partnership with the community, Crown entities, mana whenua and the Council family.
Implement projects that enable rapid and holistic transformation through coherent and integrated
strategies and outcomes in partnership with the community, other organisations and Crown entities.
TRANSIT ORIENTED
SOCIO-ECONOMIC WELL-BEING
Guide Manukau Central towards becoming an exemplar transit-oriented development that fully
capitalises on the Metropolitan Centre zone to build a quality compact centre.
Contribute to increasing and improving the social and economic well-being of the local areas people,
businesses and communities to unlock economic potential and reduce social assistance needs.
MARKET ATTRACTIVE
THINK LOCAL
Change and improve the perception of Manukau by leading the market in consolidating the centre
with high-quality exemplar and catalytic projects. These projects will reconnect existing anchors and
attract new uses, activities and a more diverse population to live and work locally. This will establish
a clear positioning and identity to reinforce Manukaus point of difference and improve market
attractiveness and competitiveness.
Focus urban regeneration and community development towards thinking local with emphasis on
developing a local heart for Manukau. We will build to a human scale with an attractive and quality
public realm, featuring active, safe and connected places.
49
KEY STRATEGIES
50
51
PROJECT CATEGORY
Anchor development
Catalyst community
Exemplar community
Catalyst community
52
53
PROJECT CATEGORY
This strategy involves identifying opportunities to ensure the planning, design and development of
Manukau provides social and economic opportunities for local people and businesses.
Support TSI in ensuring the socio-economic wellbeing of local people is improved and that they
share in the economic opportunities unlocked by
transformation
PROJECT CATEGORY
It might consider:
Unlock development
Partnership options
Anchor development
Support development
employment
Ensuring a Mori approach to integrated design and development that reflects the Councils Te
Start with the Heart develop along the Davies
Avenue amenity axis
Exemplar development
54
Catalytic development
55
STRATEGY 5: REPOSITIONING
POTENTIAL KEY MOVE
PROJECT CATEGORY
This work will review the economic context and reposition Manukau, considering the following
opportunities:
Affordable housing
PROJECT CATEGORY
Support development
Support community
Accessible housing
Rationalise and release Auckland Transportmanaged sites
Sustainable housing
Unlock development
Creating a complementary role to other centres such as the airport, Highbrook, Ormiston, Sylvia
Park recognising Manukaus excellent location and transport connectivity
Housing price points, types and sizes, neighbours, character, scale and amenity.
A development approach that can pursue uses and activities setting Manukau apart from others,
such as housing, education, government and healthcare services
Rebranding Manukau centre in association with the business community to attract investment and
Redevelop underused car parks
Unlock development
56
Support development
Unlock development
Support development
57
DEPENDENCIES
58
59
8.0 DEPENDENCIES
The Transform Manukau project is dependent on a number of
other projects and activities.
Here we summarise the potential ways in which the projects may interrelate, be dependent on one
another and how Panuku will manage those situations. We will also consider the dependencies in the
Framework Planning phase and in our approach to the staging of the project.
ALIGNMENT WITH CROWN ENTITIES
Central government involvement and investment will be vital to achieving the full scale of change and
outcomes that Manukau needs. Panuku will continue regular engagement with the Government and
formalise a contractual framework to work together.
ALIGNMENT WITH COUNCIL AND OTHER CCOS
Panuku as the lead Council organisation for the Manukau transformation. The Councils endorsement
of this HLPP will enable us to move forward with realising the opportunities for regeneration. We will
work closely with other Council departments and Council-controlled organisations (CCOs) on priorities
and budgets to align Transform Manukau with other projects and iron out potential conflicts.
GOVERNANCE
We recognise the need for clear governance, roles and responsibilities, and accountability frameworks.
This is especially necessary given that there are several Council work streams and processes
underway, and the level of collaboration this project will require with Government agencies.
MARKET TESTING
Several sites in Manukau central have been identified for potential development and we need to
ensure the delivered projects are of a quality and scale in line with a metropolitan centre. To ensure
future developments are viable and to test the high-level assumptions we have used in the current
plan, Panuku will investigate whether options are feasible including market testing. This will ensure we
choose the right development options.
Along with the approval of the HLPP, the successful delivery of the Transform Manukau project
depends on the Council approving the business case for funding. The Councils agreement in principle
to fund the projects from the proceeds of property sales will pave the way for Panuku to press on with
the priorities in this HLPP.
AFFORDABLE HOUSING
The Westfield shopping centre and Rainbows End theme park are two large and critical sites on
long-term leases. Of the two, the Westfield site presents the biggest barrier. Addressing the scale,
influence, attraction and built form of Manukau Central is critical to the transformation process, so
dealing with the lease of Westfield will be a prime focus. Through negotiation, Panuku wants to unlock
the potential of the surrounding car park sites. In doing so, we will be able to address scale, built form
and activity.
We understand the expectation on Panuku to ensure other projects underway in the Transform
Manukau area contribute to the desired goals for those locations. To ensure alignment, we will work
with existing projects such as the new bus station, playground and Kotuku House. Overall, this will help
us fulfil the Councils commitment to the quality, timing and integrated approach of the regeneration.
60
61
RENEWAL APPROACH
62
63
64
VALUE CREATION
65
66
67
Based on the belief that effective collaboration will regularly outperform individual or siloed approaches, Panuku is committed to
engaging regularly with key stakeholders to ensure that urban
regeneration in Manukau takes place in a cohesive way. This approach
has proved to offer the best chance for resolving different and
complex issues.
Collaboration requires a close partnership between the public, private and community sectors across
key platforms to achieve an integrated urban strategy. These partnerships must be invested in and put
into practice at all levels of the organisation.
A place is an assembly of elements, characteristics and experiences that together define the identity
of a particular location. Built places are born of communities, culture, economics and technology, and
over time and in turn, built environments shape culture and particular events that take place here
gradually form a history of each and every place.
It is with an appreciation of the importance of this, that Panuku has established a place-led approach
to engagement. We recognise that valuable place-led engagement uses several disciplines, including:
These three phases and the activities comprised within each are:
Form Relationships: The engagement focus sits within the planning phase. The purpose is to
establish key relationships and build a platform for the next steps. Local boards and Council officers
will primarily guide this work; they are knowledgeable about the place and largely concentrate on
gathering and sharing information.
Launch Relationships: In the design phase, we will seek feedback and test opportunities and ideas
using the relationships and networks established as above.
Consolidate Relationships: Stakeholders are kept informed and help to support the local effects of
implementation.
Maintain Relationships: Stakeholder groups and organisations take over the place-based
engagement. Panukus focus is on communications.
Place-making
Communications
Marketing
Relationship management.
68
69
The 11 Tmaki Makaurau mana whenua iwi and hap listed below have interests in the broader
Manukau area. Panuku will work in partnership with these tribes towards best care for land and people
throughout development planning and implementation.
Panuku is developing a work programme with mana whenua for the Framework Planning process. Our
collaborative work is to focus on developing and delivering tangible outcomes reflecting mana whenua
aspirations and interests in Transform Manukau.
Waiohua-Tmaki Ngti Tamaoho, Te Kawerau Maki, Ngi Tai Ki Tmaki, Te kitai Waiohua,
Ngti Te Ata Waiohua, Te Ahiwaru
To this end we have held initial sessions with representatives from six of the 11 mana whenua iwi
and hap with registered interests in the Manukau area on the project. Discussions and input have
been via our monthly forum, a site tour on 24 February 2016 and through individual meetings. Early
conversations have identified the high-level issues below.
A priority for Panuku is the ability to maintain positive momentum and to demonstrate quick wins.
Engaging hearts and minds will be vital to achieving this. Establishing understanding, trust and
credibility with people will help us proactively mitigate negative sentiments, which can often lead to
relitigation of proposals and a delay in progress.
Mana Whenua: A close partnership between Panuku and Mori is a critical part of the overall
stakeholder relationship strategy. There are 19 mana whenua iwi and hap with registered interests in
Tmaki Makaurau. Panuku recognises that through our collaborative partnership approach, Mori can
contribute to the successful exercise of the Panuku mandate in four key areas:
Central Government: While existing relationships are strong, we still need to ensure more cohesive
coordination with central Government across the wider Council family.
HIGH-LEVEL ISSUES
Local Boards: Panuku is committed to developing collaborative partnerships with local boards. We
will develop a framework for working with local boards in Transform and Unlock locations. A tailored
approach to engaging at the local level is essential to developing a genuinely effective working
relationship with these essential partners.
3. Contribution to the urban fabric through recognition of Mori cultural footprint in design, respect
for the environment, and broader social outcomes.
Waiohua tribes indicate primary interest in this area, with Te kitai Waiohua, Ngti Tamaoho and
Ngti Te Ata yet to complete treaty settlement. All unassigned Crown-owned land is of strong
interest as potential settlement land, particularly the DHB site.
Strong interest in commercial opportunities that may arise through redevelopment, with particular
interest in Crown-owned sites. This is due to incumbent settlement agreements, potential Right of
First Refusal opportunities and in respect of treaty settlement agreements still in negotiation.
We will work with the local boards and the Councils Local Board Services to flesh out this framework
in the Form Relationships phase of our relationship cycle. The Engagement team alone will not
design the shape of this working relationship; it will be done in tandem with the Place Shaping and
Development directorates input, so as not to overcommit or misalign our respective objectives.
As the Panuku work programme develops in each focus area, we will extend into committed collaborative
engagement and relationships with mataawaka, urban Mori and the broader Mori population.
725 Great South Road, Manukau Central, is a land-banked, Crown-owned site bordering 20
Barrowcliffe Place. It is likely to be part of Ngti Tamaoho settlement and may be transferred ahead
of final settlement. Accordingly, there is strong interest from Ngti Tamaoho in Panuku precinct
planning.
Critical importance of collaborative work enabling kaitiakitanga roles and responsibilities towards
sustainable management of land and water. This includes the importance of green space and
connectivity with built environment, spaces designed for people and living.
4. G
uiding the nature of our working practice when we embed Mori values in our business at a
strategic and operational level.
Ngi Tai Ki Tmaki has two-year deferred selection rights through settlement over acquisition with
lease-back to the Crown of the Manukau Area Community Probation Centre. They are strongly
interested in ongoing conversations around the potential to acquire neighbouring site Lot 17
Manukau Station Road, also known as 50 Manukau Station Road, which they might develop in the
future.
The project area falls within Tamaki Collective Right of First Refusal zone; all accordingly interested
in any Crown plans to surplus sites that do not fall within other mana whenua iwi or hap specific
settlement agreements.
70
The positive impact of improved environmental functioning of the area on the health of the
community and the feel of the place.
The importance of the Puhinui Stream as life force and life line, requiring a high level of care to
renew (commentary from Ngti Tamaoho).
Absence of cultural narratives, a need to bring cultural narratives into focus and into living presence
of the space.
Te kitai Waiohua highlight that the name of Manukau Central, which was previously known as
Wiri, was amended to Manukau. From their perspective the correct name for the area is Wiri.
71
FUNDING
72
PANUKU
PANUKUDEVELOPMENTS
DEVELOPMENT AUCKLAND
73
11.0 FUNDING
Transform Manukau will require significant funding for both operational and capital works.
Estimates at this early pre-Framework Planning stage indicate we need about $70 million
worth of public good investment projects to realise the necessary anchor, exemplar and
catalytic initiatives.
Some of these public investments will be in streetscape upgrades, greenways, stream restorations
and place activation, while other initiatives will focus on better integration between current projects
and work streams in the area. For example, the Kotuku House refurbishment could be optimised and
enhanced from being solely a building refit by considering other integration options.
The table below gives an indicative list of potential public good projects, before Framework Planning.
City street, tree planting, widened footpaths, street furniture, tree planting, widened footpaths, street furniture
$3m
Osterley Way
City main street (retail/hospitality), wide footpaths, furniture, raised tables/intersections, indented car parks, street trees
$5m
Wide footpaths, rain gardens, some street furniture, indented car parks, street trees visual/design connection with Osterley Way
$3m
Amersham Way
City main street (retail/hospitality), wide footpaths, street furniture, raised tables/intersections, indented car parks, street trees
$4m
$5m
Cavendish Drive
Boulevard enhancement
DESCRIPTION
INDICATIVE COST
Boulevard enhancement
$3m
Lambie Drive
Boulevard enhancement
$3m
$6m
$2m
$1m
$3m
$10m
Riparian planting, stormwater control, paths, feature tree planting, street furniture, bridges, integrated art
$8m
$4m
Public Art
$2m
$70m
INDICATIVE COST
Putney Way
Ronwood Avenue
74
DESCRIPTION
PROJECT
$5m
$3m
75
The proposed funding strategy to deliver on these public works recognises that current long-term plan
(LTP) budgets do not include funding for capital or operating expenditure for any Transform locations.
It is proposed that Transform Manukau (and Onehunga) expenditure is funded by reinvesting the
proceeds from disposed properties in each of these locations.
Panuku will start framework, design, engagement and implementation planning, along with early
place-making, which will require $1.9 million to complete. These internal and external costs will not be
recoverable against specific sites.
FUNDING STRATEGY
The scale of regeneration envisaged for Transform Manukau cannot be achieved within current
budgets, so funding for the project will require access to various funding sources:
The reinvested funds from sale proceeds for operational expenditure associated with preparing
the HLPP and undertaking the subsequent engagement plan, Framework Plan and development
realisation approach.
The use and reprioritisation of existing Council budgets towards delivering the key strategies and goals.
The release of funds from sales proceeds, under the proposal to reinvest such funds, to enable the
delivery of public good projects to help deliver agreed HLPP outcomes.
Possible access to funds arising from a partnership approach with Crown entities.
There are several possible supplementary funding options available to Panuku for operational and
capital expenditure. These include Council LTP funds, Panuku development and strategic development
funds, local board discretionary funds, Auckland Transport capital funds and the Local Residential
Growth Fund.
We will investigate all of these to assist in the funding strategy, which will be developed following
approval of the HLPP.
76
77
PHASING
78
PANUKU
PANUKUDEVELOPMENTS
DEVELOPMENT AUCKLAND
79
12.0 PHASING
The primary reason for an indicative approach to staging the
Transform Manukau project is that, given the intended scale
and rapid delivery, it is important to cluster projects and focus
on single areas before extending resources to other parts.
CA
R
TH
RE
NDA
RD
Goal 2 of Transform Manukau is: A strong, permanent residential population which lives, learns, plays
and works within the centre.
RD
SPORTS
BOWL
TE
UI R
IN
UH
And one of the key initiatives under the second key strategic move is to Start with the Heart and
develop along the Davies Avenue amenity axis.
IR
NG
IRIR
The central area is the most visible part of the transformation area, with the Manukau skyline highly
visible from the airport flight path and motorway network. The centre is also a retail destination for
more than eight million people a year.
RONWOOD
ET
AVE
LD
IE
STF
E
AV
N
RO
OD
WO
WE
NK
PLU
Start with the Heart reflects the importance and urgency of transformation within the central area,
particularly focused on creating a heart. Pursuing the centre first will also leverage the recent and
planned transport and land-use infrastructure investment in the area.
ISH D
ND
CAVE
The Sports Bowl is the only part of the project area to sit east of the motorway. Its potential could
be investigated and realised independently at any time during the next 25 years. Panuku would
prefer development during the medium term, as it would enhance activity for Manukau and help
change perception.
CENTRAL HEART
Within the 84ha centre (too large to develop in a single stage), we recommend a series of short-term
projects. Seven sites clustered along the Davies Avenue axis are either cleared for sale or likely to be
released. Development of this area will contribute strongly to transforming Manukau and changing
poor market perceptions.
OAD
NR
TI O
STA
U
RAINBOWS
KA
MANU
END
BARROWCLIFFE
WERO
RN
INVERELL HOSKEN
RD
B
HO
SHA
ILL
Y
WA
R
TO
MO
O
ATI
I ST
WIR
RD
HE
TH
UT
SO
ES
UC
DR
D
NR
SO
GR E AT
Y
MOTORWA
STERN
H-WE
SOUT
RY
The central area has the highest concentration of Council-controlled property and the area south of
SH20 has the highest concentration of Crown-controlled property
KEY
BOU
NR
A
AG
RU
In recommending we start with the approach outlined in the figure pictured right, we considered the following:
The northern area between the centre and Puhinui Road has little leverage from either the Council
or Crown entities, making it less important for staging
E
AV
RATAVINES
KER
RD
SUPERCLINIC
D
SR
AM
OR
ETY
G
DAL
DR
80
SR
WN
BRO
81
CRES
SILKKIM
LAMB
DR
DISH
EN
CAV
KEY
Development Sites
ERN
UTH
SO
AD
RO
PLAZA
PARK
EY
UTN
This axis presents an early opportunity to develop more than 10ha of Council-owned property,
complemented by 10ha of Hayman Park as amenity. It does not preclude any urban planning outcomes
during Framework Planning.
We need to transfer the energy and effort of the transformation across SH20 and south through
Barrowcliffe and beyond. It is essential to reconnect the centre to the Vector Wero Whitewater Park,
the Pacific Events Centre and the emerging residential area of the Special Housing Area (SHA).
Panuku believes we should start the development process for the Council properties along the Davies
Avenue axis. Development can start on any of the sites in no particular order. The properties are located
along a single, clear and legible roading corridor, which can be a potential show street of development.
These developments happening in parallel are an opportunity to make a landmark and create a
connection via the Puhinui corridor, enhanced as a safe recreation link through redeveloped Crown land
to Auckland Botanic Gardens. Not only will the redevelopment of the Housing New Zealand communities
(Trevor Hosken Drive, Rata Vine Drive and Inverell Avenue) be well placed to leverage the transformation
of the centre, but the centre will importantly have a new and intensified residential catchment.
The show street is well positioned to leverage off the upgraded Davies Avenue, the park amenity,
planned playground and views to the west, views to the Manukau Harbour from above the seventh
floor and the two-minute walk to the new train station and planned bus terminal.
From north to south, the sites are:
BUS
OAD
NR
IO
TAT
US
UKA
MA
Davies Start
2 Davies Avenue seven-level Ronwood car park, with about 1700sqm surface area designed to be
built with apartments and retail sleeved around the outside to hide the car parks
WAY
TRAIN
E-W Axis
Y
WA
UT
AY
W
ER
AM
SO
Y
WA
T
EA
M
SHA
GR
N
LEYTO
RO
TOR
MO
VE
DA
OO
NW
N-S Axis
14 Davies Avenue surface car park of more than 10,000sqm, has several options
Hayman Park developing this axis provides an opportunity to progress the park upgrades and
advocate for Te Papa Manukau to confirm its location and timing
Sections 1 and 6 Manukau Station Road 1.8ha vacant, cleared for sale and ready for development
ORWAY
SOUTH-WESTERN MOT
31-33 Manukau Station Road (lot 59) 7000sqm of residual land from the bus station, used for
car parking and cleared for sale. We recommend progressing the Davies Avenue corner of this long
east-west corridor as a first stage
50 Manukau Station Road just under 10,000sqm of vacant land, cleared for sale
20 Barrowcliffe Place (stage 1) 5.1ha of vacant land next to SH20 and Puhinui Stream, cleared for
sale. The Te Araroa national trail passes through this site into the centre.
NR
IO
TAT
IS
WI
82
83
Framework Planning and collaboration with the Crown entities will continue throughout 2016 and
beyond, so it is reasonable to assume that physical works and development realisation will only occur
on Crown properties from 2020.
The expiry of the Rainbows End lease in 2034 is a critical point for understanding the factors that will
influence the Westfield site and the approach to Rainbows End. We will need to decide whether to
allow the fun park to stay or redevelop the site for other uses.
The extent and nature of the changes in the transformations early stages will guide outcomes for
the Westfield shopping centre and its surrounding car park areas. There is potential for a range of
interventions, uses and activities to truly transform the centre of Manukau, which has the shopping
centre at its core.
Panuku believes Rainbows End should become a celebrated, enhanced and expanded visitor
destination, adjusted to the entertainment needs of the time. The property could join with 2 Clist
Crescent to make a single site, extending the theme park to meet Manukau Station Road and provide
an iconic entry to Manukau Central. Meanwhile, from now until 2034, this property is essentially a
long-term land bank.
Advocating for Te Papa Manukau would provide an additional catalytic project over the medium term
to improve the centres perception. Place activation and management will ensure a regular events
calendar and activities. Beyond this period, working with Westfield is critical to the centres overall
transformation.
In parallel, development will continue south over Kerrs Road onto the Super Clinic site and into the
Rata Vine Drive community. The factors influencing market economics will be more compelling, with
housing stock aged 30-plus and the preceding development stages adding land value. This will be a
significant programme of work to unlock.
In the area covering Ronwood Avenue to the Cavendish Drive blocks, Ronwood Avenue properties will
be well prepared for regeneration in accordance with the Metropolitan Centre zone.
Farther out on the development horizon, there is an opportunity to futureproof the area for potential
light rail transit after 2040, from the airport through Manukau to Botany.
The Puhinui Stream will also be a key environmental project over the medium term.
84
85
12.1 TIMING
As well as the mandate as lead Council agency for Transform
Manukau, we gained approval from the Panuku Board and Auckland
Development Committee to take the next steps.
TASKS
Develop a Manukau Framework Plan that will assess and prioritise projects and initiatives in the
public realm and, in partnership with the private sector, development sites.
Develop an implementation plan that will outline prioritised development initiatives in greater detail
and will inform the go to market document.
Develop an engagement and communications plan that will outline the process for engaging with
the community and key stakeholders throughout the programme.
Dispose of sites that are either surplus to requirements or can be developed, in partnership, by others.
ESTIMATED
TIMING
Approvals programme
APPROVAL
AUTHORITY
DATE
Panuku Board
30 March 2016
(Completed)
Auckland Development
Committee
14 April 2016
(Completed)
Panuku Board
July/August 2016
Panuku
July/August 2016
Panuku
July/August 2016
Panuku/Crown
May 2016
July 2016
Meetings, workshops,
communications
Meeting
May-June (TBC)
Reinvest the proceeds of any asset sales into the Manukau transformation.
86
May onwards
Finalise documents
July 2016
Execution process
September 2016
Site by site
April 2017
87
CONTACTS
PROJECT MANAGER
Richard Davison
ENGAGEMENT MANAGER
Toni Giacon
PANUKU DEVELOPMENT AUCKLAND
Level 2, Pier 21 Building, 11 Westhaven Drive, Freemans Bay.
PO Box 90343, Victoria Street West, Auckland 1142, New Zealand.
T: +64 9 336 8820
W: www.panuku.co.nz
facebook.com/DevelopmentAKL
IN PARTNERSHIP WITH:
88
89
90