Maersk Deliverer
Maersk Deliverer
Maersk Deliverer
Deliverer
Deliverer.indd 1
Ultra deepwater
drilling and development
semi-submersible
19-09-2014 08:44:41
Deliverer.indd 5
21-08-2014 10:30:09
Maersk Drilling
Mrsk Deliverer
Mrsk
Deliverer
TYPE
DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability to attach to an 8-point
pre-installed mooring system; provisions to attach to a
12-point pre-installed mooring system
BUILT
KeppelFELS, Singapore , 2009
CLASS
American Bureau of Shipping
FLAG
Denmark
Main advantages
Exploratory, appraisal and development drilling
Deliverer.indd 2
19-09-2014 08:44:41
Deliverer.indd 4
21-08-2014 10:30:07
Mrsk Deliverer
Maersk Drilling
Main particulars
DIMENSIONS
IMPERIAL
METRIC
Length overall
384 ft
117 m
Width overall
256 ft
78 m
Length of pontoons
376 ft
115 m
57 ft / 33 ft
18 m / 10 m
Columns
55 ft x 57 ft
17 m x 18 m
259 ft / 258 ft
78.5 m / 78 m
Moonpool opening
108.3 ft x 29.5 ft
33 m x 9 m
67.3 ft / 60.7 ft
20.5 m / 18.5 m
Draft transit
31.8 ft
9.7 m
PARTICULARS
IMPERIAL
METRIC
40,000 ft
12,000 m
2,500,000 lbs
1,134 t
1,500,000 lbs
680 t
2,756,000 lbs
1,250 t
2,000,000 lbs
907 t
Setback load
2,646,000 lbs
1,200 t
7,000 t / 4,600 t
1,500 / 400 t
5,000 t / 2,000 t
13,500 t / 7,000 t
4,200,000 lbs
1,906 t
10,765 ft2
1,000 m2
IMPERIAL
METRIC
328 ft 10,000 ft
100 m 3,000 m
Wind speed
56 knots
29 m/sec
26.2 ft
8m
Wave period
12.3 s
12.3 s
Current (surface)
1.7 knots
0.9 m/sec
CAPACITIES
IMPERIAL
METRIC
Drill water
12,580 bbl
2,000 m
Potable water
5,032 bbl
800 m
Fuel oil
25,160 bbl
4,000 m
Brine
4,718 bbl
750 m
Base oil
4,718 bbl
750 m
9,435 bbl
1,500 m
9,435 bbl
1,500 m
Bulk mud
24,000 ft
680 m
Bulk cement
24,000 ft
680 m
Sack material
2,160 ft
200 m
Accommodation
180 people
180 people
Deliverer.indd 3
19-09-2014 08:44:41
Maersk Drilling
Mrsk Deliverer
Key features
CROWN MOUNTED COMPENSATION
Main rotary: static / compensating load 2,500,000lbs/
1,000,000lbs (1,134 t / 454 t). Hydraulic locking with
25ft stroke. Auxiliary rotary: static / compensating load
1,500,000lbs / 750,000 lbs (680 t / 340 t). Hydraulic locking
with 25ft stroke. Active heave compensation mode
available.
HP MUD SYSTEM
Four 2,200 hp mud pumps rated for 7,500 psi.
Deliverer.indd 5
19-09-2014 08:44:41
Maersk Drilling
Mrsk Deliverer
CRANES
Port deck crane: Knuckle-boom crane with 3,000 m, 3 wire
for deployment of subsea trees and other modules up to
100 t heave compensated over the side of the rig. 165 t lift
capability from supply boat. Auxiliary whipline hoist 15 t SWL
@ 50 m. Starboard deck crane: 50 m max. reach, SWL 60 t @
20 m dynamic. One pipehandling knuckle-boom crane: 30 m
max. reach, SWL 12 t @ 10 m.
HELICOPTER DECK
Helicopter deck suitable for an EH101 helicopter or Sikorsky
S61.
SAFETY EQUIPMENT
Lifesaving and firefighting equipment in accordance with
Danish Maritime Authority requirements and the IMO MODU
code 2001. The rig holds a vessel specific safety case which
has been approved by HSE UK.
ACCOMMODATION
Accommodation for 180 people in 10 one-man rooms and 85
two-men rooms. Ample office spaces and conference rooms
for clients and 3rd party service contractors. Recreation
rooms, total area of 270 m2.
Deliverer.indd 6
19-09-2014 08:44:41
Deliverer.indd 4
19-09-2014 08:44:41
Mrsk Deliverer
Maersk Drilling
Drilling features
The rig includes a number of innovative features, which enhance the capacity and flexibility for
multiple concurrent activities and improve the drilling efficiency. Back-up facilities and solutions
are generally provided to reduce the impact of equipment failures.
Rig Floor
Moonpool
LARGE MOONPOOL;
FLEXIBILITY FOR MULTIPLE ACTIVITIES
N-Line riser tensioner system with tripsaver
Transfer of equipment across the moonpool
Dedicated off-line wet parking position for BOP / drilling
riser
BOP handling area (starboard side)
Subsea tree staging area (port side)
Optimised layout
The hull design and layout are based on the operational experience of various deepwater operators
and third party system suppliers and incorporate a number of innovative ideas from our customers.
Great emphasis has been made on optimising the rigs layout to facilitate flexibilit y in installation
and operation of third party equipment.
Subsea completions
Logistics
Deliverer.indd 7
19-09-2014 08:44:41
Maersk Drilling
Mrsk Deliverer
Drilling features
TOP VIEW AND DRILL FLOOR
TANK TOP
Deliverer.indd 8
19-09-2014 08:44:46
Maersk Drilling
Mrsk Deliverer
SIDE VIEW
Deliverer.indd 9
19-09-2014 08:45:02
October 2014
Head office:
Maersk Drilling
50, Esplanaden
1098 Copenhagen K
Denmark
www.twitter.com/maerskdrilling
E-mail: [email protected]
www.maerskdrilling.com
www.youtube.com/user/Maerskcom
www.vimeo.com/maerskdrilling
www.instagram.com/maerskdrilling
DISCLAIMER: This brochure is for promotional purposes only. All descriptions, specifications and other information contained in this brochure and/or in any accompanying material is: (i) intended to give only a general indication of the sorts
of service or equipment or performance that might be available (ii) intended to be no more than an invitation to treat (iii) subject to contract and possible change or alteration at our discretion and without notice to you (iv) not to be relied
upon by you for any purposes whatsoever when entering into any legally binding agreement with us.
Deliverer.indd 10
19-09-2014 08:45:06