Boilers RLA
Boilers RLA
Boilers RLA
and
Life Extension Programme
In Power Boilers
of Captive Power Plant of NALCO
By
R.S.DAS, Chief Manager (MECH),CPP,NALCO
R.S.DAS,NALCO
R.S.DAS,NALCO
R.S.DAS,NALCO
120 MW X 8
R.S.DAS,NALCO
RAW WATER
HP
HEATER
D/A
LP HEATER
GRIDCO
BFP
WATER TREATMENT
HPT
IPT
LPT
GENERATOR
SMELTER
COOLING
TOWER
10.5 KV
220 KV
CEP
CW PUMP
6.6 KV
UA T
CONDE NSER
REHEA TED S TEAM
GT
6.6 KV
SAT
CONDENSATE
STORAGE TA NK
CHIMNEY
BOILER
COAL B UNKERS
ECONOMISER
ELECTRO STA TIC
PRECIPITA TOR
FUEL OIL TA NK
MILL
ID FAN
FD FANS
PA FAN
COAL
CRUS HER
ASH SLURRY PUMPS
R.S.DAS,NALCO
R.S.DAS,NALCO
2.
UNIT
2(part RLA of RH)
YEAR
1997
2000
2003
2004
2004
2005
2009( DUE)
2015( DUE)
2016(DUE)
R.S.DAS,NALCO
R.S.DAS,NALCO
10
R.S.DAS,NALCO
11
12
13
(Cont. )
R.S.DAS,NALCO
14
15
R.S.DAS,NALCO
16
R.S.DAS,NALCO
17
R.S.DAS,NALCO
18
HANGER
CHECKING AT
CPP ,NALCO
R.S.DAS,NALCO
19
R.S.DAS,NALCO
20
R.S.DAS,NALCO
21
R.S.DAS,NALCO
22
PROBE
R.S.DAS,NALCO
23
BOTTOM RING
HEADER
R.S.DAS,NALCO
24
VIDEO SCOPE OF
SH HEADER
STUB
R.S.DAS,NALCO
25
26
27
28
Very dirty
29
R.S.DAS,NALCO
30
R.S.DAS,NALCO
31
R.S.DAS,NALCO
32
R.S.DAS,NALCO
33
OUT PUT
TOTAL RUPTURE LIFE
REMAINING LIFE
R.S.DAS,NALCO
34
OXIDE THICKNESS IN MM
1.2
0.8
OXIDE THICKNESS
0.6
0.4
0.2
0
1
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43
45
47
COIL NO
R.S.DAS,NALCO
35
640
COIL WISE
SERVICE TEMP.
TEMPERATURE IN DEGREE
620
600
580
TEMP
560
540
520
500
1
11 13 15
17 19 21
23 25 27
29 31 33
35 37 39
41 43 45
47
COIL NO
180000
160000
REMAINING LIFE IN HR
140000
120000
100000
REMAINING LIFE IN HRS
80000
COIL WISE
REMAINING LIFE.
60000
40000
20000
0
1 3 5
7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47
COIL NO
R.S.DAS,NALCO
36
R.S.DAS,NALCO
37
R.S.DAS,NALCO
EXTRAPOLATED
LIFE OF SH COIL
38
LIFE PREDICTION
LIFE PREDICTION OF OUR RH AND PLATEN SH TUBES
WAS DONE BASED ON INSIDE OXIDE SCALE THICKNESS
MEASUREMENT.
IN UNIT-2 , 37 NO RH COILS WERE REPLACED IN 2001
BASED ON LIFE PREDICTION DONE IN 1997.
IN UNIT-1 , 34 NO RH COILS WERE REPLACED IN 2005
BASED ON LIFE PREDICTION DONE IN 2000.
IN OTHER UNITS THE PREDICTED LIFE OF RH AND SH
COILS ARE AS BELOW.
R.S.DAS,NALCO
39
PREDICTED LIFE
UNIT-4 PLATEN SH
54,500 Hrs
47,500 Hrs
56,500 Hrs
59,100 Hrs
56,100 Hrs
66,100 Hrs
R.S.DAS,NALCO
40
PREDICTED LIFE
R.S.DAS,NALCO
41
R.S.DAS,NALCO
42
R.S.DAS,NALCO
43
AREA OF
THE
BOILER PR
PARTS
01.
RLA Study of
Boiler after
1,00,000 Hrs.
of Operation
Done in
August 2000
Done in
December
2003
02.
Boiler Drum
- Visual
-Insitu Replica
-Hardness
-UT
-DP
- Deposit
analysis
No specific
recommendatio
n and found o.k
03.
Water Wall
-Visual
-Sampling(
internal
deposit and
hydrogen
embrittlement)
- Dimensions
( OD &
thickness)
No specific
recommendatio
n and found o.k
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT
#6
(OR513)
UNIT
#7
(OR696)
UNIT
#8
(OR713)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
Done April
2004
Done in July
2004
Done in June2005
Not
due
(runnin
g hrs <
100000
)
Not
due
(runnin
g hrs <
100000
)
Not
due
(runnin
g hrs <
100000
)
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
R.S.DAS,NALCO
44
SL.
NO
.
AREA OF
THE BOILER
PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNIT #
6 (OR513)
UNIT #
7 (OR696)
UNIT #
8 (OR713)
04.
Eco Coils;
- Visual
-Dimensional
checks,
-Sample check
for
metallography
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
05.
Low tem
Header ( Eco
in and
out,Bottom
ring header );
- Visual
-Fibrovision
Inspection
-Hardness
-DP
-Dimensions
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
06.
LTSH Coils;
- Visual
- Hardness
-Dimensional
checks,
-Sample check
for
metallography
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
R.S.DAS,NALCO
45
SL.
NO
.
AREA OF
THE BOILER
PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNIT #
6 (OR513)
UNIT #
7 (OR696)
UNIT #
8 (OR713)
07.
LTSH Outlet
Header ( SHH
9 );
- Visual
-Fibrovision
Inspection
-Insitu Replica
-Hardness
-UT
-DP
-Dimensions
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
08.
SH Inlet
Header ( SHH
10 );
-Fibrovision
Inspection
-Insitu Replica
-Hardness
-UT
-DP
-Dimensions
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
NA
NA
NA
R.S.DAS,NALCO
46
SL.
NO
.
AREA OF THE
BOILER PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNI
T#
6
(OR
513)
UNI
T#
7
(OR
696)
UNI
T#
8
(OR
713)
09.
SH Outlet Header (
SHH 11 );
-Fibrovision
Inspection
-Insitu Replica
-Hardness
-UT
-DP
-Dimensions
No specific
recommendation
and found o.k
No
specific
recommendati
on and found
o.k
No specific
recommendation
and found o.k
No
specific
recommend
ation and
found o.k
No specific
recommendation
and found o.k
NA
NA
NA
10.
Platen SH Coil
-IOT Measurement
-DP
-Dimension check,
-Samples for Creep
rupture &
Metallography Test.
- Hardness
Predicted life :
> 2,00,000 hrs
Predicted
life :
> 1,00,000 hrs
Predicted life :
> 1,00,000 hrs
Predicted
life :
> 1,00,000
hrs.
Predicted life :
> 1,00,000 hrs.
NA
NA
NA
11.
Desuperheater :-Fibrovision
Inspection.
-Insitu Replica
-Hardness
-UT
-DP
-Dimension check
No specific
recommendation
and found o.k
No specific
recommendati
on and found
o.k
No specific
recommendation
and found o.k
No specific
recommend
ation and
found o.k
No specific
recommendation
and found o.k
NA
NA
NA
R.S.DAS,NALCO
47
SL.
NO
.
AREA OF THE
BOILER PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNI
T#6
(OR513)
UNI
T#
7
(OR696)
UNI
T#
8
(OR713)
12.
No specific
recommendation
and found o.k
No
specific
recommendatio
n and found o.k
No specific
recommendation
and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendation
and found o.k
NA
NA
NA
13.
Reheater Outlet
Header ( RHH 2 )
-Fibrovision
Inspection
-Insitu Replica
-Hardness
-UT
-DP
- Dimensions
No specific
recommendation
and found o.k
No
specific
recommendatio
n and found o.k
No specific
recommendation
and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendation
and found o.k
NA
NA
NA
14.
Replacement of
Reheater Coils
(25 - 48) from
Interbank outlet
to HRH outlet
header; ( RLA :2000, Aug ) .
Action taken :
Reheater Coils
(15 - 48) from
Interbank outlet
to HRH outlet
header were
replaced in
May 2005.
Predicted life:
i) Front coils >
95,000 hrs
ii) Rear coils >
1,00,000 hrs
Predicted life :
> 1,00,000 hrs
Predicted life :
1. > 1,00,00 for
all coils except
HRH coil
30,.32,33 in the
fifth ckt rear.
2. Coil 30 fifth
ckt rear54,500 hrs,
3. Coil 32 fifth
ckt rear47,500 hrs
4. Coil 33 fifth
ckt rear56,500 hrs,
Predicted life :
1. > 1,00,00 for
all coils except
HRH coil
22,31,33 in the
fifth ckt rear.
2. Coil 22 fifth
ckt rear- 59,100
hrs,
3. Coil 31 fifth
ckt rear- 56,100
hrs
4. Coil 33 fifth
ckt rear- 66,100
hrs,
NA
NA
NA
R.S.DAS,NALCO
48
SL.
NO
.
AREA OF THE
BOILER PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNI
T#
6
(OR
513)
UNI
T#
7
(OR
696)
UNIT
#8
(OR713)
15.
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendati
on and found
o.k
NA
NA
NA
Reexamination
in 2008
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendati
on and found
o.k
NA
NA
NA
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No
specific
recommendati
on and found
o.k
NA
NA
NA
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
Reexamination
in 2008
No specific
recommendatio
n and found o.k
No
specific
recommendati
on and found
o.k
NA
NA
NA
e) HP Bypass Pipe
line
-Insitu Replica
-UT
-DP
-Dimension checks.
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No specific
recommendatio
n and found o.k
No
specific
recommendati
on and found
o.k
NA
NA
NA
R.S.DAS,NALCO
49
AREA OF THE
BOILER PR PARTS
UNIT # 1
(OR-369)
UNIT #2
(OR-370)
UNIT # 3
(OR-372)
UNIT # 4
(OR-382)
UNIT # 5
(OR-397)
UNIT # 6
(OR-513)
UNIT #
7 (OR696)
UNI
T#
8
(OR
713)
No specific
recommenda
tion and
found o.k
No specific
recommend
ation and
found o.k
No specific
recommendatio
n and found o.k
No specific
recommen
dation and
found o.k
No specific
recommen
dation and
found o.k
NA
NA
NA
16
.
DONE
DONE
DONE
DONE
DONE
2009
2015
2016
17
2008
2009
2009
2009
2010
S
L.
N
O
.
R.S.DAS,NALCO
50
R.S.DAS,NALCO
51
R.S.DAS,NALCO
52
NO
2
1
0
1988-2002
2002-07
YEAR
R.S.DAS,NALCO
53
NO
2
1
0
1988-2002
2002-07
YEAR
R.S.DAS,NALCO
54
R.S.DAS,NALCO
55
56
NO
6
5
4
3
NO OF TUBE LEAKAGES
2
1
0
92-93 93-94 94-95 95-96 96-97 97-98 98-99
NO OF TUBE LEAKAGES
99-
2000
01
02
03
04
O5
06
07
YEAR
R.S.DAS,NALCO
57
NO
10
8
6
4
2
0
NO OF FAILURES
9192
9293
9394
9495
9596
9697
9798
9899
10
12
10
15
14
12
YEAR
NO OF FAILURES
R.S.DAS,NALCO
58
59
Thank You
R.S.DAS,NALCO
60