A level run was carried out between Stn1 and Stn4, and the level of Stn1
was held fixed.
EQUIPMENT LIST
-
CONCLUSIONS
The misclosure on the traversing was small with a 3mm difference in
Eastings and 0mm difference in Northings which resulted in an accuracy
figure of 1:56,245 which is well.
The trig heighted levels agreed with the spirit levelling run with a
difference of 4mm on Stn1, 1mm on Stn2, 2mm on Stn3 and 2mm on
Stn4, which is well within accepted tolerances.
The misclose reflects the equipment and practices used; a 5 second total
station checked and calibrated, atmospheric corrections applied to
distances along with checked and adjusted optical plummets.
Two rounds of angles were read to improve the quality of observations and
to check for any gross errors.
The level was calibrated prior to use to ensure accuracy of readings, and
the level run agreed very well with the trig Heighting.