0% found this document useful (0 votes)
855 views27 pages

Dosing Manual PDF

INNOSPEC Marine dosing system is designed to dose into the ship's main bunkerline. The system should be switched on at start bunkering and switched OFF at end of bunkering of fuel oil. To test the dosing pump or to bleed the system, see under part commissioning (page 10 - 11).

Uploaded by

Jagankumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
855 views27 pages

Dosing Manual PDF

INNOSPEC Marine dosing system is designed to dose into the ship's main bunkerline. The system should be switched on at start bunkering and switched OFF at end of bunkering of fuel oil. To test the dosing pump or to bleed the system, see under part commissioning (page 10 - 11).

Uploaded by

Jagankumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

Dosing System Manual

Customer Technical Service - Engineering

Installation, Commissioning
and Technical Information
for the 5 - 75 L/Hr
Marine Dosing Unit

Innospec Limited
PO Box 17
Oil Sites Road
Ellesmere Port
Cheshire CH65 4EY, U.K.
tel: +44 (0)151 355 3611
fax: +44 (0)151 356 2349

The information contained in this document is provided free of charge and is based on technical data that Innospec believes to be reliable. It is intended
for use by persons having technical skill and at their own discretion and risk. Innospec accepts no liability for any loss, damage or expense arising from, or
in connection with, the use of the information. Furthermore, none of the contents of this publication should be taken as a licence to operate under any
patent, nor as a recommendation to infringe any patent.

5-75 L/Hr Dosing Unit

Issue No 1 May 2007

Dosing System Manual

Contents
Description

Page No.

System Specifications

Functional Description

General Layout Drawing

Equipment Overview Drawing

Parts Listing

Electrical Wiring Drawings

Injector Layout Drawing

Installation Procedure

9 - 10

Commissioning Procedure

10 - 11

Spare Parts

11

Technical Information and dosing graphs

12

5-75 L/Hr Dosing Unit

Page 2 of 12

Issue 1 May 2007

Dosing System Manual

System Specifications
Unit Dimensions :

500 (H) x 400 (W) x 300 (D) (mm)

Packaged Dimensions:

600 (H) x 500 (W) x 400 (D) (mm)

Packaged Weight :

~ 42 Kgs

Power Supply :

115 230 400 440 VAC 50/60 Hz

Nom. Back Pressure:

2.0 Barg

Maximum Back Pressure : 4.0 Barg at 50 Hz; 3.5 Barg at 60 Hz

Functional Description
The INNOSPEC Marine dosing system is designed to dose into the ships main bunkerline. The system
should be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automatic
Start/Stop an optional External Start/Stop cabinet has to be installed.
To test the dosing pump or to bleed the system, see under part commissioning (page 10 11).

ALWAYS ENSURE THAT THE CORRECT VOLTAGE IS CONNECTED!


Power Supply:

115 230 400 440 VAC; 50/60 Hz.

The selection switch (12) on switch cabinet (11) has to be set accordingly.

5-75 L/Hr Dosing Unit

Page 3 of 12

Issue 1 May 2007

Dosing System Manual

General Lay-Out Drawing

5-75 L/Hr Dosing Unit

Page 4 of 12

Issue 1 May 2007

Dosing System Manual

Equipment Overview

5-75 L/Hr Dosing Unit

Page 5 of 12

Issue 1 May 2007

Dosing System Manual

Equipment List

ITEM

QTY

DESCRIPTION

Dosing pump DMX 75-4

221-75-10198

GRU-DMX75-4PVT

Flow counter

VZO 8

VIT-9263000

Bleed valve

Ball valve 8 mm

ALA-74500808

Check valve spring loaded

Check valve 10 mm; 1 barg

SO-47321-10-1 bar

Injector with check valve assembly

AQ-10700200 +
SO-7300-1/2-1 bar

6-7

Suction assembly

AQ-10700XXX

Drum closer + Quick connector

Injector 1/2"x1/2" Check


valve 1/2"; 1 barg
HYD-1271983-100+TEE21042300+AQ-10700185
AQ-10700111+GEH940206+GEH-940106VIT

Drum Breather

Breather 3/4"

AQ-10700070

10

Main switch in box

Main switch 3 Phase 20


Amp Ye/Rd

SOL-5960892

11

Switch cabinet incl. transformer

CI2216A + WEC-30000020

AQ-1070XXXX

12

Selection switch

M220 61070 219M1

SOL-5960170

5-75 L/Hr Dosing Unit

Page 6 of 12

TYPE

ARTICLE CODE

AQ-107000XX

Issue 1 May 2007

Dosing System Manual

Electrical Wiring Drawings

5-75 L/Hr Dosing Unit

Page 7 of 12

Issue 1 May 2007

Dosing System Manual

Injector Layout Drawing

5-75 L/Hr Dosing Unit

Page 8 of 12

Issue 1 May 2007

Dosing System Manual

Installation Procedure
Securely mount the dosing cabinet, using the fixing brackets supplied, to a suitable location in the vicinity of the
fuel transfer pumps.

Ensure that the Octamar product drum is secured tightly to the ship build so free movement is
not possible.

SECURE
THE
OCTAMAR
PRODUCT
DRUM

Assemble the suction, bleed and discharge hoses using the components as shown in the Equipment
Overview (page 5).

5-75 L/Hr Dosing Unit

Page 9 of 12

Issue 1 May 2007

Dosing System Manual

A.

Connect the pump suction side with flexible hose to the suction assembly and drum closer with
suction filter (6, 7, 8).
Note: The suction hose should be kept as short as possible (2 metres).

B. Mount the suction hose with suction assembly, drum-closer and suction filter to the product drum.
Note: Ensure that the drum-closer is screwed in completely so that the suction valve and filter will
hang 1 cm above the bottom of the drum.
Important: The vertical distance (height) between pump unit and bottom of the product drum must
not exceed 2 meters (6,5 feet).
C. Connect the pump discharges with flexible hoses to the injection assembly and fit the injection nozzle in the
main bunkerline.
D. Connect the short air bleed hose and place a small container beneath the outlet from the bleed discharge.
E. Connect a power supply cable to main switch in box (10). The power supply is 2 phases 115 or 230 or 400
or 440 VAC 50/60 Hz. The power supply is connected directly to the main switch at terminal 1 and 3 and
Earth (PE).
F. Before powering up the system check if the selection switch (12) is set at right voltage level.

Commissioning Procedure
The INNOSPEC Marine dosing system is designed to dose into the ships main bunkerline. The system
should be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automatic
Start/Stop an optional External Start/Stop cabinet has to be installed.
Prior to putting the dosage unit into service, the system has to be primed and bled of air. After priming
of the unit is completed, setting of the correct chemical dosage rate (flow rate in L/hr) will also be required. You
will be informed of the recommended flow rate for your installation prior to commissioning.
Please follow the instructions below.
A. Make sure all connections are tight.
B. Make sure the dosing system is switched ON at main switch (10).
C. Make sure the stroke length of the dosage pump is set at 100%. This is the large knob on the pump
console. Unscrew the locking screw before turnig the knob.
D. Open the air bleed valve (3)

5-75 L/Hr Dosing Unit

Page 10 of 12

Issue 1 May 2007

Dosing System Manual

E. After a few minutes, chemical will discharge from the air bleed hose.
F. When there is a constant flow of chemical from the air bleed hose, shut air bleed valve (3).
G. Adjust the flow rate with the large knob on the pump. See dosing graph on page 12. The knob can be set
from 0 100 % and is locked tight using a locking screw. Loosen this screw before altering the setting.
Tighten the screw after setting of the desired flowrate. The flow rate can be checked with the flow counter
(2).
H. Switch OFF the power to the dosage unit and close the panel door.
Note: Re-priming of the pump may be necessary after changing the product drum and/or if the pump and hoses
are disconnected for maintenance or repair.

Spare Parts
If spare parts are required, please contact your nearest Innospec Marine Specialties office. Address
and contact details are on the inside of the cabinet door.
Please quote the pump serial number, the system serial number and item(s) you require. Please also
refer to the parts listing shown in the Equipment Overview Drawing and Parts Listing on page 5 - 6 of this
manual.

USA

Europe, Middle East, Africa

Innospec Marine Specialties


Customer Service Centre - USA
8375 South Willow Street
Littleton, CO 80124
USA
Tel: +1 800 441 9547
Fax: +1 303 792 5668
e-mail: [email protected]

Innospec Marine Specialties


Customer Service Centre - EMEA
P.O. Box 53156
CY-3301 Limassol
Cyprus
Tel: +357 25 762 535
Fax: +357 25 762 545
e-mail: [email protected]

Greece/Turkey

Asia Pacific

Innospec Hellas Ltd.


Marine Specialties
Customer Service Centre - Greece & Turkey
11, II Merarchias Street
185-35 Piraeus
Greece
Tel: +30 210 411 0727 / 8
Fax: +30 210 411 0748
e-mail: [email protected]

Innospec Marine Specialties


Customer Service Centre - Asia Pacific
47 Scotts Road, #02-03 Goldbell Towers
Singapore 228233
Tel : +65 6336 6286
Fax : +65 6336 1692
e-mail: [email protected]

5-75 L/Hr Dosing Unit

Page 11 of 12

Issue 1 May 2007

Dosing System Manual

TECHNICAL INFORMATION
Grundfos Alldos Primus 221 75-4 Motor Driven Dosing Pump
Note: The pump has been calibrated to operate between 5-75 litres per hour.
The Grundfos Alldos manual is attached for reference.

5-75 L/Hr Dosing Unit

Page 12 of 12

Issue 1 May 2007

You might also like