Dosing Manual PDF
Dosing Manual PDF
Installation, Commissioning
and Technical Information
for the 5 - 75 L/Hr
Marine Dosing Unit
Innospec Limited
PO Box 17
Oil Sites Road
Ellesmere Port
Cheshire CH65 4EY, U.K.
tel: +44 (0)151 355 3611
fax: +44 (0)151 356 2349
The information contained in this document is provided free of charge and is based on technical data that Innospec believes to be reliable. It is intended
for use by persons having technical skill and at their own discretion and risk. Innospec accepts no liability for any loss, damage or expense arising from, or
in connection with, the use of the information. Furthermore, none of the contents of this publication should be taken as a licence to operate under any
patent, nor as a recommendation to infringe any patent.
Contents
Description
Page No.
System Specifications
Functional Description
Parts Listing
Installation Procedure
9 - 10
Commissioning Procedure
10 - 11
Spare Parts
11
12
Page 2 of 12
System Specifications
Unit Dimensions :
Packaged Dimensions:
Packaged Weight :
~ 42 Kgs
Power Supply :
2.0 Barg
Functional Description
The INNOSPEC Marine dosing system is designed to dose into the ships main bunkerline. The system
should be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automatic
Start/Stop an optional External Start/Stop cabinet has to be installed.
To test the dosing pump or to bleed the system, see under part commissioning (page 10 11).
The selection switch (12) on switch cabinet (11) has to be set accordingly.
Page 3 of 12
Page 4 of 12
Equipment Overview
Page 5 of 12
Equipment List
ITEM
QTY
DESCRIPTION
221-75-10198
GRU-DMX75-4PVT
Flow counter
VZO 8
VIT-9263000
Bleed valve
Ball valve 8 mm
ALA-74500808
SO-47321-10-1 bar
AQ-10700200 +
SO-7300-1/2-1 bar
6-7
Suction assembly
AQ-10700XXX
Drum Breather
Breather 3/4"
AQ-10700070
10
SOL-5960892
11
CI2216A + WEC-30000020
AQ-1070XXXX
12
Selection switch
SOL-5960170
Page 6 of 12
TYPE
ARTICLE CODE
AQ-107000XX
Page 7 of 12
Page 8 of 12
Installation Procedure
Securely mount the dosing cabinet, using the fixing brackets supplied, to a suitable location in the vicinity of the
fuel transfer pumps.
Ensure that the Octamar product drum is secured tightly to the ship build so free movement is
not possible.
SECURE
THE
OCTAMAR
PRODUCT
DRUM
Assemble the suction, bleed and discharge hoses using the components as shown in the Equipment
Overview (page 5).
Page 9 of 12
A.
Connect the pump suction side with flexible hose to the suction assembly and drum closer with
suction filter (6, 7, 8).
Note: The suction hose should be kept as short as possible (2 metres).
B. Mount the suction hose with suction assembly, drum-closer and suction filter to the product drum.
Note: Ensure that the drum-closer is screwed in completely so that the suction valve and filter will
hang 1 cm above the bottom of the drum.
Important: The vertical distance (height) between pump unit and bottom of the product drum must
not exceed 2 meters (6,5 feet).
C. Connect the pump discharges with flexible hoses to the injection assembly and fit the injection nozzle in the
main bunkerline.
D. Connect the short air bleed hose and place a small container beneath the outlet from the bleed discharge.
E. Connect a power supply cable to main switch in box (10). The power supply is 2 phases 115 or 230 or 400
or 440 VAC 50/60 Hz. The power supply is connected directly to the main switch at terminal 1 and 3 and
Earth (PE).
F. Before powering up the system check if the selection switch (12) is set at right voltage level.
Commissioning Procedure
The INNOSPEC Marine dosing system is designed to dose into the ships main bunkerline. The system
should be switched ON at start bunkering and switched OFF at end of bunkering of fuel oil.
As an alternative the system can dose into the suction filter of the transferpump, for automatic
Start/Stop an optional External Start/Stop cabinet has to be installed.
Prior to putting the dosage unit into service, the system has to be primed and bled of air. After priming
of the unit is completed, setting of the correct chemical dosage rate (flow rate in L/hr) will also be required. You
will be informed of the recommended flow rate for your installation prior to commissioning.
Please follow the instructions below.
A. Make sure all connections are tight.
B. Make sure the dosing system is switched ON at main switch (10).
C. Make sure the stroke length of the dosage pump is set at 100%. This is the large knob on the pump
console. Unscrew the locking screw before turnig the knob.
D. Open the air bleed valve (3)
Page 10 of 12
E. After a few minutes, chemical will discharge from the air bleed hose.
F. When there is a constant flow of chemical from the air bleed hose, shut air bleed valve (3).
G. Adjust the flow rate with the large knob on the pump. See dosing graph on page 12. The knob can be set
from 0 100 % and is locked tight using a locking screw. Loosen this screw before altering the setting.
Tighten the screw after setting of the desired flowrate. The flow rate can be checked with the flow counter
(2).
H. Switch OFF the power to the dosage unit and close the panel door.
Note: Re-priming of the pump may be necessary after changing the product drum and/or if the pump and hoses
are disconnected for maintenance or repair.
Spare Parts
If spare parts are required, please contact your nearest Innospec Marine Specialties office. Address
and contact details are on the inside of the cabinet door.
Please quote the pump serial number, the system serial number and item(s) you require. Please also
refer to the parts listing shown in the Equipment Overview Drawing and Parts Listing on page 5 - 6 of this
manual.
USA
Greece/Turkey
Asia Pacific
Page 11 of 12
TECHNICAL INFORMATION
Grundfos Alldos Primus 221 75-4 Motor Driven Dosing Pump
Note: The pump has been calibrated to operate between 5-75 litres per hour.
The Grundfos Alldos manual is attached for reference.
Page 12 of 12