SECTION 27 08 00 Commissioning of Communications: Based On DFD Specification Dated 02/27/15

This document provides commissioning forms for verifying the installation of communications systems for a construction project. It includes construction verification checklists for identification of communications systems, structured cabling, patch cords and cross connects. The forms are to be filled out by installers to document inspections and tests at each stage of installation. Once completed, the forms are submitted to the commissioning agent for review prior to construction progress meetings. The document instructs the user to edit the checklist questions to reflect the specific systems being commissioned for the project.

Uploaded by

Wmjara Muñoz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views32 pages

SECTION 27 08 00 Commissioning of Communications: Based On DFD Specification Dated 02/27/15

This document provides commissioning forms for verifying the installation of communications systems for a construction project. It includes construction verification checklists for identification of communications systems, structured cabling, patch cords and cross connects. The forms are to be filled out by installers to document inspections and tests at each stage of installation. Once completed, the forms are submitted to the commissioning agent for review prior to construction progress meetings. The document instructs the user to edit the checklist questions to reflect the specific systems being commissioned for the project.

Uploaded by

Wmjara Muñoz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 32

1

SECTION 27 08 00
COMMISSIONING OF COMMUNICATIONS

BASED ON DFD SPECIFICATION DATED 02/27/15

4
5
This section has been written to cover most (but not all) situations that you will encounter. Depending
6
on the requirements of your specific project, you may have to add material, delete items, or modify what
7
is currently written. The Division of Facilities Development expects changes and comments from you.
8
9
PART 1 - GENERAL
10
11SCOPE
12This section includes commissioning forms for construction verification and functional performance testing.
13Included are the following topics:
14
15PART 1 - GENERAL
16
Scope
17
Related Work
18
Reference
19
Submittals
20PART 2 - PRODUCTS
21
(Not Used)
22PART 3 - EXECUTION
23
Commissioning Forms
24
DO NOT INCLUDE ANY COMMISSIONING FORMS for PRELIMINARY review. Just edit the list
25
below and only submit pages 27 08 00-1 through 27 08 00-2 with strikethroughs.
26
CV-27 05 53
Identification for Communications Systems
27
CV-27 10 00
Structured Cabling
28
CV-27 11 00
Communications Equipment Room Fittings
29
CV-27 16 19
Communications Patch Cords, Station Cords, and Cross-Connect Wire
30
31RELATED WORK
32Section 01 91 01 or 01 91 02 Commissioning Process
33
34REFERENCE
35Applicable provisions of Division 1 shall govern work under this section.
36
37SUBMITTALS
38Reference the General Conditions of the Contract for submittal requirements.
39
40Reference Section 01 91 01 or 01 91 02 Commissioning Process for Construction Verification Checklist and
41Functional Performance Test submittal requirements.
42
43
PART 2 PRODUCTS
44(Not Used)
45
46
PART 3 EXECUTION
47
48COMMISSIONING FORMS
49Commissioning forms are to be filled in as work progresses by the individuals responsible for installation and shall
50be completed for each installation phase.
51
52Provide a description of the work completed since the last entry, the percentage of the total work completed for the
53system for that area and the step of installation or finalization.
54

DFD Project No.

27 08 00-1

1Circle Yes or No for each commissioning form item. If the information requested for an item does not apply to the
2given stage of installation for the system, list it as N/A. Explain all discrepancies, negative responses or N/A
3responses in the negative responses section.
4
5Once the work is 100% complete and the responses to each item are complete and resolved for a given
6commissioning forms group, mark as complete, initial and date in the spaces provided.
7
8Provide copies of the commissioning forms to the commissioning agent 2 days prior to construction progress
9meetings.
10
11
Edit the individual construction verification checklists and provide additional checklists as needed to
12
reflect the verification requirements of assemblies, components, equipment and systems to be
13
commissioned on this project.
14
15

DFD Project No.

27 08 00-2

1
2
3
4
5
6
7

DO NOT INCLUDE ANY of the following


COMMISSIONING FORMS for PRELIMINARY review. Just
edit the list in Part I above and only submit pages 27 08 00-1
through 27 08 00-2 with strikethroughs.

DFD Project No.

27 08 00-3

Construction Verification Checklist


27 05 53 Identification for Communications Systems
1

CV-27 05 53 Identification for Communication Systems

1
2

3Equipment Identification/Tag: _______


4Location: _________________________
5A)

LABELING

Date

Description of Work Performed

CHECKLIST GROUP COMPLETE

%
Complete

Initials

Questions (See details below)


1)
2)
3)
4)
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
INITIALS:

5)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO

6)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
DATE:

7)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO

8)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO

9)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO

10)
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO

6Question Details
7
1) Telecommunications Outlet faceplates labeled as specified.
8
2) Cabling at Telecommunications Outlet labeled as specified.
9
3) Modular Patch Panels for Horizontal Copper Cable labeled as specified.
10
4) Termination Blocks for Horizontal Copper Cable (if applicable) labeled using correct color-coded (BLUE) Designation Strips
11
5) Termination Blocks for Backbone Copper Cable (if applicable) labeled using correct color-coded (WHITE, GRAY or BROWN) Designation Strips
12
6) Fiber Optic Patch Panels for backbone fiber optic cabling labeled as specified.
13
7) Copper Cabling at Modular Patch Panels and Termination Blocks at Main Equipment Room and Telecom Room(s) labeled in accordance with specification requirements.
14
8) Fiber Optic Cabling at Patch Panels at Main Equipment Room and Telecom Room(s) labeled in accordance with specification requirements.
15
9) Innerduct for backbone fiber optic cabling (if applicable) labeled as specified.
16
10) Backboard, Equipment Racks and Cabinets, and Enclosures labeled as specified.
2

DFD Project No.

27 08 00-4

Construction Verification Checklist


27 05 53 Identification for Communications Systems
1
1Negative
Group/
Item

Responses

Date
Found

Found
By

Location

Reason for Negative Response

Resolved
YES / NO
YES / NO
YES / NO
YES / NO
YES / NO

DFD Project No.

27 08 00-5

Date
Resolved

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1

11)

1
2
3

12) Equipment Identification/Tag: _______


13) Location: _________________________

14)

A) HORIZONTAL CABLING IN CONDUIT - INSTALLATION CHECKS

15)
D
16) Description of Work Performed
35)

57)

79)

101)

CV-27 10 00 Structured Cabling

36)

58)

80)

102)

17) %
18) C
o
m
p
l
e
t
e

37)

59)

81)

103)

20) Questions (See details below)


19) I
n
i
t
i
a
l
s

38)

60)

82)

104)

26)
2

27)
3

28)
4

29)
5

30)
6

31)
7

32)
8

39)
Y

41)
Y

43)
Y

45)
Y

47)
Y

49)
Y

51)
Y

53)
Y

40)

42)

44)

46)

48)

50)

52)

54)

61)
Y

63)
Y

65)
Y

67)
Y

69)
Y

71)
Y

73)
Y

75)
Y

62)

64)

66)

68)

70)

72)

74)

76)

83)
Y

85)
Y

87)
Y

89)
Y

91)
Y

93)
Y

95)
Y

97)
Y

84)

86)

88)

90)

92)

94)

96)

98)

105)
Y

107)
Y

109)
Y

111)
Y

113)
Y

115)
Y

117)
Y

119)
Y

106)

108)

110)

112)

114)

116)

118)

120)

25)
1)

DFD Project No.

27 08 00-6

33)

34)

55)

56)

77)

78)

99)

100)

121)

122)

Construction Verification Checklist


27 10 00 Structured Cabling
1

123)
15)
D

124)
16) Description of Work Performed

145)

167)

189)

146)

168)

190)

211) CHECKLIST GROUP COMPLETE

216)

2
3
4
5
6
7
8
9

1)
2)
3)
4)
5)
6)
7)
8)

17) %
18) C
o
m
125)
p
l
e
t

19) I
n
i
t
126)
i
a
l
s

147)

148)

169)

191)

170)

192)

20) Questions (See details below)


127)
129)
131)
133)
135)
Y
Y
Y
Y
Y

137)
Y

139)
Y

141)
Y

128)

130)

132)

134)

136)

138)

140)

142)

149)
Y

151)
Y

153)
Y

155)
Y

157)
Y

159)
Y

161)
Y

163)
Y

150)

152)

154)

156)

158)

160)

162)

164)

171)
Y

173)
Y

175)
Y

177)
Y

179)
Y

181)
Y

183)
Y

185)
Y

172)

174)

176)

178)

180)

182)

184)

186)

193)
Y

195)
Y

197)
Y

199)
Y

201)
Y

203)
Y

205)
Y

207)
Y

194)

196)

198)

200)

202)

204)

206)

208)

212)
INITIALS
:

213)

214)
DATE:

143)

144)

165)

166)

187)

188)

209)

210)

215)

Question Details

Exposed cabling has been visually inspected for physical damage and any damaged cabling has been replaced. Cabling jacket and insulation are in good condition.
Cable color(s) matches specification requirements for given cable type.
Cable listing (e.g. General Purpose, Riser, Plenum) as specified and appropriate for installation environments.
Conduits swabbed to remove foreign material prior to pulling cables.
Cables pulled though conduit at the same time, with pulling lubricant used as required to ease pulling tensions.
Cabling is splice free.
Bend radii conforms to manufacturer recommendations for each cable type.
Appropriate slack provided in length required by specifications for given cabling type and termination point.

DFD Project No.

27 08 00-7

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

217)

218)
Gr

Negative Responses
219)
Dat
e
220)
Fou
n
d

221)
Fo
222)
By

223)
Locati
o
n

224)
Reason
Response

229)

230)

231)

232)

233)

237)

238)

239)

240)

241)

245)

246)

247)

248)

249)

253)

254)

255)

256)

257)

261)

262)

263)

264)

265)

for

Negative

DFD Project No.

27 08 00-8

225)
Resolve
d
234)
YES /
NO
242)
YES /
NO
250)
YES /
NO
258)
YES /
NO
266)
YES /
NO

226)
Date
227)
Resolv
ed

228)

235)

236)

243)

244)

251)

252)

259)

260)

267)

268)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

269)

270)
D

290)

312)

334)

356)

B) UNENCLOSED HORIZONTAL CABLING - INSTALLATION CHECKS

271)
Description
Performed

291)

313)

335)

357)

of

Work

272)
%
273)
Com
p
l
e
t
e

292)

314)

336)

358)

275)

274)
Initi
a
l
s

293)

315)

337)

359)

Questions (See details below)

281)
2

282)
3

283)
4

284)
5

285)
6

286)
7

287)
8

294)
Y

296)
Y

298)
Y

300)
Y

302)
Y

304)
Y

306)
Y

308)
Y

295)

297)

299)

301)

303)

305)

307)

309)

316)
Y

318)
Y

320)
Y

322)
Y

324)
Y

326)
Y

328)
Y

330)
Y

317)

319)

321)

323)

325)

327)

329)

331)

338)
Y

340)
Y

342)
Y

344)
Y

346)
Y

348)
Y

350)
Y

352)
Y

339)

341)

343)

345)

347)

349)

351)

353)

360)
Y

362)
Y

364)
Y

366)
Y

368)
Y

370)
Y

372)
Y

374)
Y

361)

363)

365)

367)

369)

371)

373)

375)

280)
1)

DFD Project No.

27 08 00-9

288)

289)

310)

311)

332)

333)

354)

355)

376)

377)

Construction Verification Checklist


27 10 00 Structured Cabling
1

378)
270)
D

400)

422)

444)

1
2
3
4
5
6
7
8
9
10

379)
271)
Description
Performed

of

Work

401)

423)

445)

466)

CHECKLIST GROUP COMPLETE

471)

Question Details

1)
2)
3)
4)
5)
6)
7)
8)

272)
%
273)
Com
380)
p
l
e
t
402)

424)

446)

274)
Initi
381)
a
l
s

403)

425)

447)

275)
382)
Y

Questions (See details below)


384)
386)
388)
390)
392)
Y
Y
Y
Y
Y

394)
Y

396)
Y

383)

385)

387)

389)

391)

393)

395)

397)

404)
Y

406)
Y

408)
Y

410)
Y

412)
Y

414)
Y

416)
Y

418)
Y

405)

407)

409)

411)

413)

415)

417)

419)

426)
Y

428)
Y

430)
Y

432)
Y

434)
Y

436)
Y

438)
Y

440)
Y

427)

429)

431)

433)

435)

437)

439)

441)

448)
Y

450)
Y

452)
Y

454)
Y

456)
Y

458)
Y

460)
Y

462)
Y

449)

451)

453)

455)

457)

459)

461)

463)

467)
INITIALS
:

468)

469)
DATE:

398)

399)

420)

421)

442)

443)

464)

465)

470)

Exposed cabling has been visually inspected for physical damage and any damaged cabling has been replaced. Cabling jacket and insulation are in good condition.
Cable color(s) matches specification requirements for given cable type.
Cable listing (e.g. General Purpose, Riser, Plenum) as specified and appropriate for installation environments.
Cabling supported via J-hook or bridal-type supports at spacing defined within specifications. (Bridal-type supports configured with bend-radius control.)
Supports are independent of piping, ductwork, equipment, cable tray or other conduit.
Minimum separations provided for cabling per specifications to minimize EMI.
Cabling is splice free.
Bend radii conform to manufacturer recommendations for each cable type.
Appropriate slack provided in length required by specifications for given cabling type and termination point.

DFD Project No.

27 08 00-10

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

472)

473)
Gr

Negative Responses
474)
Dat
e
475)
Fou
n
d

476)
Fo
477)
By

478)
Locati
o
n

479)
Reason
Response

484)

485)

486)

487)

488)

492)

493)

494)

495)

496)

500)

501)

502)

503)

504)

508)

509)

510)

511)

512)

516)

517)

518)

519)

520)

for

Negative

DFD Project No.

27 08 00-11

480)
Resolve
d
489)
YES /
NO
497)
YES /
NO
505)
YES /
NO
513)
YES /
NO
521)
YES /
NO

481)
Date
482)
Resolv
ed

483)

490)

491)

498)

499)

506)

507)

514)

515)

522)

523)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

524)

525)
D

545)

568)

591)

614)

C) TELECOMMUNICATIONS OUTLET - INSTALLATION CHECKS

526)
Description
Performed

546)

569)

592)

615)

of

Work

527)
%
528)
Com
p
l
e
t
e

547)

570)

593)

616)

530)

529)
Initi
a
l
s

548)

571)

594)

617)

Questions (See details below)

536)
2

537)
3

538)
4

539)
5

540)
6

541)
7

542)
8

543)
9

549)
Y

551)
Y

553)
Y

555)
Y

557)
Y

559)
Y

561)
Y

563)
Y

565)
Y

550)

552)

554)

556)

558)

560)

562)

564)

566)

572)
Y

574)
Y

576)
Y

578)
Y

580)
Y

582)
Y

584)
Y

586)
Y

588)
Y

573)

575)

577)

579)

581)

583)

585)

587)

589)

595)
Y

597)
Y

599)
Y

601)
Y

603)
Y

605)
Y

607)
Y

609)
Y

611)
Y

596)

598)

600)

602)

604)

606)

608)

610)

612)

618)
Y

620)
Y

622)
Y

624)
Y

626)
Y

628)
Y

630)
Y

632)
Y

634)
Y

619)

621)

623)

625)

627)

629)

631)

633)

635)

535)
1)

DFD Project No.

27 08 00-12

544)

567)

590)

613)

636)

Construction Verification Checklist


27 10 00 Structured Cabling
1

637)
525)
D

660)

683)

706)

1
2
3
4
5
6
7
8
9
10

638)
526)
Description
Performed

of

Work

661)

684)

707)

729)

CHECKLIST GROUP COMPLETE

734)

Question Details

527)
%
528)
Com
639)
p
l
e
t
662)

685)

708)

529)
Initi
640)
a
l
s

663)

686)

709)

530)
641)
Y

Questions (See details below)


643)
645)
647)
649)
651)
Y
Y
Y
Y
Y

653)
Y

655)
Y

657)
Y

642)

644)

646)

648)

650)

652)

654)

656)

658)

664)
Y

666)
Y

668)
Y

670)
Y

672)
Y

674)
Y

676)
Y

678)
Y

680)
Y

665)

667)

669)

671)

673)

675)

677)

679)

681)

687)
Y

689)
Y

691)
Y

693)
Y

695)
Y

697)
Y

699)
Y

701)
Y

703)
Y

688)

690)

692)

694)

696)

698)

700)

702)

704)

710)
Y

712)
Y

714)
Y

716)
Y

718)
Y

720)
Y

722)
Y

724)
Y

726)
Y

711)

713)

715)

717)

719)

721)

723)

725)

727)

730)
INITIALS
:

731)

732)
DATE:

1) Telecommunications Outlet faceplate material and color are as specified.


2) Outlets installed at locations and heights specified in contract documents for given outlet type.
Outlets mounted at same height for given outlet type throughout facility.
3) Outlets are level.
4) Outlets are flush to finished surface.
5) Connector types and colors are as specified.
6) Connector positions and faceplate layout are as specified. Faceplate layout for a given configuration is same throughout installation.
7) Unused connector positions fitted with a bank insert color-matched to the faceplate color.
8) Connectors fitted with Dust Covers as specified and as applicable.

DFD Project No.

27 08 00-13

733)

659)

682)

705)

728)

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

9) Outlets secured using tamper-resistant fasteners (if applicable).

735)

736)
Gr

Negative Responses
737)
Dat
e
738)
Fou
n
d

739)
Fo
740)
By

741)
Locati
o
n

742)
Reason
Response

747)

748)

749)

750)

751)

755)

756)

757)

758)

759)

763)

764)

765)

766)

767)

771)

772)

773)

774)

775)

779)

780)

781)

782)

783)

for

Negative

DFD Project No.

27 08 00-14

743)
Resolve
d
752)
YES /
NO
760)
YES /
NO
768)
YES /
NO
776)
YES /
NO
784)
YES /
NO

744)
Date
745)
Resolv
ed

746)

753)

754)

761)

762)

769)

770)

777)

778)

785)

786)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

787)

788)
D

808)

828)

848)

868)

D) HORIZONTAL CABLING AT EQUIPMENT ROOM - INSTALLATION CHECKS

789)
Description
Performed

809)

829)

849)

869)

of

Work

790)
%
791)
Com
p
l
e
t
e

810)

830)

850)

870)

793)

792)
Initi
a
l
s

811)

831)

851)

871)

Questions (See details below)

799)
2

800)
3

801)
4

802)
5

803)
6

812)
Y

814)
Y

816)
Y

818)
Y

820)
Y

822)
Y

813)

815)

817)

819)

821)

823)

832)
Y

834)
Y

836)
Y

838)
Y

840)
Y

842)
Y

833)

835)

837)

839)

841)

843)

852)
Y

854)
Y

856)
Y

858)
Y

860)
Y

862)
Y

853)

855)

857)

859)

861)

863)

872)
Y

874)
Y

876)
Y

878)
Y

880)
Y

882)
Y

873)

875)

877)

879)

881)

883)

798)
1)

DFD Project No.

27 08 00-15

804)

805)

806)

807)

824)

825)

826)

827)

844)

845)

846)

847)

864)

865)

866)

867)

884)

885)

886)

887)

Construction Verification Checklist


27 10 00 Structured Cabling
1

888)
788)
D

908)

928)

948)

889)
789)
Description
Performed

of

Work

909)

929)

949)

790)
%
791)
Com
890)
p
l
e
t
910)

930)

950)

792)
Initi
891)
a
l
s

911)

931)

951)

793)
892)
Y

Questions (See details below)


894)
896)
898)
900)
902)
Y
Y
Y
Y
Y

893)

895)

897)

899)

901)

903)

912)
Y

914)
Y

916)
Y

918)
Y

920)
Y

922)
Y

913)

915)

917)

919)

921)

923)

932)
Y

934)
Y

936)
Y

938)
Y

940)
Y

942)
Y

933)

935)

937)

939)

941)

943)

952)
Y

954)
Y

956)
Y

958)
Y

960)
Y

962)
Y

953)

955)

957)

959)

961)

963)

904)

905)

906)

907)

924)

925)

926)

927)

944)

945)

946)

947)

964)

965)

966)

967)

968)

CHECKLIST GROUP COMPLETE

973)

Question Details

2
3
4
5
6
7
8

1) Modular Patch Panels and Termination Blocks provided as specified.


2) Cable is supported at rear of Patch Panels and at entry to Termination Blocks.
3) Copper Twisted Pair terminated as specified. Cable jacket is removed only to the extent required for termination and within manufacturers recommended limits.
Cable pairs untwisted only to the extent required for termination and within manufacturers recommended limits.
4) Coaxial cabling terminated and secured as specified.
5) Cabling secured using hook-and-loop ties within the room.
6) Horizontal Jumper Management in place on Equipment Racks as specified.

969)
INITIALS
:

DFD Project No.

27 08 00-16

970)

971)
DATE:

972)

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

974)

975)
Gr

Negative Responses
976)
Dat
e
977)
Fou
n
d

978)
Fo
979)
By

980)
Locati
o
n

981)
Reason
Response

986)

987)

988)

989)

990)

994)

995)

996)

997)

998)

1002)

1003)

1004)

1005)

1006)

1010)

1011)

1012)

1013)

1014)

1018)

1019)

1020)

1021)

1022)

for

Negative

DFD Project No.

27 08 00-17

982)
Resolve
d
991)
YES /
NO
999)
YES /
NO
1007)
YES /
NO
1015)
YES /
NO
1023)
YES /
NO

983)
Date
984)
Resolv
ed

985)

992)

993)

1000)

1001)

1008)

1009)

1016)

1017)

1024)

1025)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

1026)

1027)
D

1047)

1070)

1093)

1116)

E) BACKBONE CABLING - INSTALLATION CHECKS

1028)
Description
Performed

1048)

1071)

1094)

1117)

of

Work

1029)
%
1030)
Com
p
l
e
t
e

1049)

1072)

1095)

1118)

1032)

1031)
Initi
a
l
s

1050)

1073)

1096)

1119)

Questions (See details below)

1038)
2

1039)
3

1040)
4

1041)
5

1042)
6

1043)
7

1044)
8

1045)
9

1051)
Y

1053)
Y

1055)
Y

1057)
Y

1059)
Y

1061)
Y

1063)
Y

1065)
Y

1067)
Y

1052)

1054)

1056)

1058)

1060)

1062)

1064)

1066)

1068)

1074)
Y

1076)
Y

1078)
Y

1080)
Y

1082)
Y

1084)
Y

1086)
Y

1088)
Y

1090)
Y

1075)

1077)

1079)

1081)

1083)

1085)

1087)

1089)

1091)

1097)
Y

1099)
Y

1101)
Y

1103)
Y

1105)
Y

1107)
Y

1109)
Y

1111)
Y

1113)
Y

1098)

1100)

1102)

1104)

1106)

1108)

1110)

1112)

1114)

1120)
Y

1122)
Y

1124)
Y

1126)
Y

1128)
Y

1130)
Y

1132)
Y

1134)
Y

1136)
Y

1121)

1123)

1125)

1127)

1129)

1131)

1133)

1135)

1137)

1037)
1)

DFD Project No.

27 08 00-18

1046)

1069)

1092)

1115)

1138)

Construction Verification Checklist


27 10 00 Structured Cabling
1

1139)
1027)
D

1162)

1185)

1208)

1
2
3
4
5
6
7
8
9
10

1140)
1028)
Description
Performed

of

Work

1163)

1186)

1209)

1231)

CHECKLIST GROUP COMPLETE

1236)

Question Details

1029)
%
1030)
Com
1141)
p
l
e
t
1164)

1187)

1210)

1031)
Initi
1142)
a
l
s

1165)

1188)

1211)

1032)
1143)
Y

Questions (See details below)


1145) 1147) 1149) 1151) 1153)
Y
Y
Y
Y
Y

1155)
Y

1157)
Y

1159)
Y

1144)

1146)

1148)

1150)

1152)

1154)

1156)

1158)

1160)

1166)
Y

1168)
Y

1170)
Y

1172)
Y

1174)
Y

1176)
Y

1178)
Y

1180)
Y

1182)
Y

1167)

1169)

1171)

1173)

1175)

1177)

1179)

1181)

1183)

1189)
Y

1191)
Y

1193)
Y

1195)
Y

1197)
Y

1199)
Y

1201)
Y

1203)
Y

1205)
Y

1190)

1192)

1194)

1196)

1198)

1200)

1202)

1204)

1206)

1212)
Y

1214)
Y

1216)
Y

1218)
Y

1220)
Y

1222)
Y

1224)
Y

1226)
Y

1228)
Y

1213)

1215)

1217)

1219)

1221)

1223)

1225)

1227)

1229)

1232)
INITIALS
:

1)
2)
3)
4)
5)

1233)

1234)
DATE:

1235)

Fiber Optic Patch Panels and Termination Blocks provided as specified.


Unused Fiber Optic Patch Panel positions fitted with blanks or cover plates as applicable.
Cable color(s) matches specification requirements for given cable type.
Cable listing (e.g. General Purpose, Riser, Plenum) as specified and appropriate for installation environments.
Cabling supported within equipment rooms and in vertical chases as specified. Supports are independent of piping, ductwork, equipment, cable tray or other conduit.
Wire-mesh-type support grips or other approved means used where cable must bear stress.
6) Appropriate slack provided in length required by specifications for given cabling type and termination point.
7) Cabling is splice free.
8) Fiber Optic Duplex Coupling orientation (e.g. A-B, B-A) is as specified. Fibers positioned in sequence; positions are same at both ends of cable.

DFD Project No.

27 08 00-19

1161)

1184)

1207)

1230)

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

9) Metallic Cable armor and/or Shielding bonded to telecommunications ground.

1237)

1238)
Gr

Negative Responses
1239)
Dat
e
1240)
Fou
n
d

1241)
Fo
1242)
By

1243)
Locati
o
n

1244)
Reason
Response

1249)

1250)

1251)

1252)

1253)

1257)

1258)

1259)

1260)

1261)

1265)

1266)

1267)

1268)

1269)

1273)

1274)

1275)

1276)

1277)

1281)

1282)

1283)

1284)

1285)

for

Negative

1289)

DFD Project No.

27 08 00-20

1245)
Resolve
d
1254)
YES /
NO
1262)
YES /
NO
1270)
YES /
NO
1278)
YES /
NO
1286)
YES /
NO

1246)
Date
1247)
Resolv
ed

1248)

1255)

1256)

1263)

1264)

1271)

1272)

1279)

1280)

1287)

1288)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

1290)

1291)
D

1311)

1332)

1353)

1374)

F) CABLING AND PATHWAYS (GENERAL) - INSTALLATION CHECKS

1292)
Description
Performed

1312)

1333)

1354)

1375)

of

Work

1293)
%
1294)
Com
p
l
e
t
e

1313)

1334)

1355)

1376)

1296)

1295)
Initi
a
l
s

1314)

1335)

1356)

1377)

Questions (See details below)

1302)
2

1303)
3

1304)
4

1305)
5

1306)
6

1307)
7

1315)
Y

1317)
Y

1319)
Y

1321)
Y

1323)
Y

1325)
Y

1327)
Y

1316)

1318)

1320)

1322)

1324)

1326)

1328)

1336)
Y

1338)
Y

1340)
Y

1342)
Y

1344)
Y

1346)
Y

1348)
Y

1337)

1339)

1341)

1343)

1345)

1347)

1349)

1357)
Y

1359)
Y

1361)
Y

1363)
Y

1365)
Y

1367)
Y

1369)
Y

1358)

1360)

1362)

1364)

1366)

1368)

1370)

1378)
Y

1380)
Y

1382)
Y

1384)
Y

1386)
Y

1388)
Y

1390)
Y

1379)

1381)

1383)

1385)

1387)

1389)

1391)

1301)
1)

DFD Project No.

27 08 00-21

1308)

1309)

1310)

1329)

1330)

1331)

1350)

1351)

1352)

1371)

1372)

1373)

1392)

1393)

1394)

Construction Verification Checklist


27 10 00 Structured Cabling
1

1395)
1291)
D

1416)

1437)

1458)

1396)
1292)
Description
Performed

of

Work

1417)

1438)

1459)

1479)

CHECKLIST GROUP COMPLETE

1484)

Question Details

2
3
4
5
6
7
8

1)
2)
3)
4)
5)
6)
7)

1293)
%
1294)
Com
1397)
p
l
e
t
1418)

1439)

1460)

1295)
Initi
1398)
a
l
s

1419)

1440)

1461)

1296)
1399)
Y

Questions (See details below)


1401) 1403) 1405) 1407) 1409)
Y
Y
Y
Y
Y

1411)
Y

1400)

1402)

1404)

1406)

1408)

1410)

1412)

1420)
Y

1422)
Y

1424)
Y

1426)
Y

1428)
Y

1430)
Y

1432)
Y

1421)

1423)

1425)

1427)

1429)

1431)

1433)

1441)
Y

1443)
Y

1445)
Y

1447)
Y

1449)
Y

1451)
Y

1453)
Y

1442)

1444)

1446)

1448)

1450)

1452)

1454)

1462)
Y

1464)
Y

1466)
Y

1468)
Y

1470)
Y

1472)
Y

1474)
Y

1463)

1465)

1467)

1469)

1471)

1473)

1475)

1480)
INITIALS
:

1481)

Cable bend radii conform to manufacturer recommendations for given wire type and gauge.
Penetrations through floor and rated walls are sealed as specified using an Assembly rated for the wall or floor penetrated.
Penetrations through non-rated walls are sealed as specified for given space type.
Communications Cabling pulled in separate conduits from normal power, emergency power, security and control systems.
Conduit junction boxes are painted and tagged in accordance with specification requirements.
Pull cord provided in each conduit. Includes occupied and vacant conduit.
Cross-connects are complete and documented as specified.

DFD Project No.

27 08 00-22

1482)
DATE:

1413)

1414)

1415)

1434)

1435)

1436)

1455)

1456)

1457)

1476)

1477)

1478)

1483)

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

1485)

1486)
Gr

Negative Responses
1487)
Dat
e
1488)
Fou
n
d

1489)
Fo
1490)
By

1491)
Locati
o
n

1492)
Reason
Response

1497)

1498)

1499)

1500)

1501)

1505)

1506)

1507)

1508)

1509)

1513)

1514)

1515)

1516)

1517)

1521)

1522)

1523)

1524)

1525)

1529)

1530)

1531)

1532)

1533)

for

Negative

DFD Project No.

27 08 00-23

1493)
Resolve
d
1502)
YES /
NO
1510)
YES /
NO
1518)
YES /
NO
1526)
YES /
NO
1534)
YES /
NO

1494)
Date
1495)
Resolv
ed

1496)

1503)

1504)

1511)

1512)

1519)

1520)

1527)

1528)

1535)

1536)

Resolution

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

1537)

1538)
D

1558)

1579)

1600)

1621)

G) TESTING CHECKS

1539)
Description
Performed

1559)

1580)

1601)

1622)

of

Work

1540)
%
1541)
Com
p
l
e
t
e

1560)

1581)

1602)

1623)

1543)

1542)
Initi
a
l
s

1561)

1582)

1603)

1624)

Questions (See details below)

1549)
2

1550)
3

1551)
4

1552)
5

1553)
6

1554)
7

1562)
Y

1564)
Y

1566)
Y

1568)
Y

1570)
Y

1572)
Y

1574)
Y

1563)

1565)

1567)

1569)

1571)

1573)

1575)

1583)
Y

1585)
Y

1587)
Y

1589)
Y

1591)
Y

1593)
Y

1595)
Y

1584)

1586)

1588)

1590)

1592)

1594)

1596)

1604)
Y

1606)
Y

1608)
Y

1610)
Y

1612)
Y

1614)
Y

1616)
Y

1605)

1607)

1609)

1611)

1613)

1615)

1617)

1625)
Y

1627)
Y

1629)
Y

1631)
Y

1633)
Y

1635)
Y

1637)
Y

1626)

1628)

1630)

1632)

1634)

1636)

1638)

1548)
1)

DFD Project No.

27 08 00-24

1555)

1556)

1557)

1576)

1577)

1578)

1597)

1598)

1599)

1618)

1619)

1620)

1639)

1640)

1641)

Construction Verification Checklist


27 10 00 Structured Cabling
1

1642)
1538)
D

1663)

1684)

1705)

1643)
1539)
Description
Performed

of

Work

1664)

1685)

1706)

1726)

CHECKLIST GROUP COMPLETE

1731)

Question Details

2
3
4
5
6
7
8

1)
2)
3)
4)
5)
6)
7)

1540)
%
1541)
Com
1644)
p
l
e
t
1665)

1686)

1707)

1542)
Initi
1645)
a
l
s

1666)

1687)

1708)

1543)
1646)
Y

Questions (See details below)


1648) 1650) 1652) 1654) 1656)
Y
Y
Y
Y
Y

1658)
Y

1647)

1649)

1651)

1653)

1655)

1657)

1659)

1667)
Y

1669)
Y

1671)
Y

1673)
Y

1675)
Y

1677)
Y

1679)
Y

1668)

1670)

1672)

1674)

1676)

1678)

1680)

1688)
Y

1690)
Y

1692)
Y

1694)
Y

1696)
Y

1698)
Y

1700)
Y

1689)

1691)

1693)

1695)

1697)

1699)

1701)

1709)
Y

1711)
Y

1713)
Y

1715)
Y

1717)
Y

1719)
Y

1721)
Y

1710)

1712)

1714)

1716)

1718)

1720)

1722)

1727)
INITIALS
:

Maximum Horizontal Cable (Voice & Data) length is less than 295.
Copper Horizontal Twisted-pair Cabling Tested and Documented as specified.
Copper Backbone Twisted-pair Cabling Tested and Documented as specified.
Copper Horizontal Coax Cabling Tested and Documented as specified.
Copper Backbone Coax Cabling Tested and Documented as specified.
Fiber Optic Backbone Cabling Tested and Documented as specified.
Shielded cabling shield and drain wire continuity tested and results are acceptable.

DFD Project No.

27 08 00-25

1728)

1729)
DATE:

1660)

1661)

1662)

1681)

1682)

1683)

1702)

1703)

1704)

1723)

1724)

1725)

1730)

Construction Verification Checklist


27 10 00 Structured Cabling
1
1

1732)

1733)
Gr

Negative Responses
1734)
Dat
e
1735)
Fou
n
d

1736)
Fo
1737)
By

1738)
Locati
o
n

1739)
Reason
Response

1744)

1745)

1746)

1747)

1748)

1752)

1753)

1754)

1755)

1756)

1760)

1761)

1762)

1763)

1764)

1768)

1769)

1770)

1771)

1772)

1776)

1777)

1778)

1779)

1780)

for

Negative

DFD Project No.

27 08 00-26

1740)
Resolve
d
1749)
YES /
NO
1757)
YES /
NO
1765)
YES /
NO
1773)
YES /
NO
1781)
YES /
NO

1741)
Date
1742)
Resolv
ed

1743)

1750)

1751)

1758)

1759)

1766)

1767)

1774)

1775)

1782)

1783)

Resolution

Construction Verification Checklist


27 11 00 Communications Equipment Room Fittings
1

1784)

CV-27 11 00 Communications Equipment Room Fittings

1
2
3
4

1785)
1786)
1787)

Equipment Identification/Tag: _______


Location: _________________________

1788)

A) EQUIPMENT RACKS, CABLE RUNWAY AND MISCELLANEOUS EQUIPMENT ROOM FITTINGS

1789)
D

1809)

1829)

1849)

1790)
Description
Performed

1810)

1830)

1850)

of

Work

1791)
%
1792)
Com
p
l
e
t
e

1811)

1831)

1851)

1794)

1793)
Initi
a
l
s

1812)

1832)

1852)

Questions (See details below)

1800)
2

1801)
3

1802)
4

1803)
5

1804)
6

1813)
Y

1815)
Y

1817)
Y

1819)
Y

1821)
Y

1823)
Y

1814)

1816)

1818)

1820)

1822)

1824)

1833)
Y

1835)
Y

1837)
Y

1839)
Y

1841)
Y

1843)
Y

1834)

1836)

1838)

1840)

1842)

1844)

1853)
Y

1855)
Y

1857)
Y

1859)
Y

1861)
Y

1863)
Y

1854)

1856)

1858)

1860)

1862)

1864)

1799)
1)

DFD Project No.

27 08 00-27

1805)

1806)

1807)

1808)

1825)

1826)

1827)

1828)

1845)

1846)

1847)

1848)

1865)

1866)

1867)

1868)

Construction Verification Checklist


27 11 00 Communications Equipment Room Fittings
1

1869)
1789)
D

1889)

1909)

1929)

1949)

1870)
1790)
Description
Performed

of

Work

1890)

1910)

1930)

1950)

1791)
%
1792)
Com
1871)
p
l
e
t
1891)

1911)

1931)

1951)

1793)
Initi
1872)
a
l
s

1892)

1912)

1932)

1952)

1794)
1873)
Y

Questions (See details below)


1875) 1877) 1879) 1881) 1883)
Y
Y
Y
Y
Y

1874)

1876)

1878)

1880)

1882)

1884)

1893)
Y

1895)
Y

1897)
Y

1899)
Y

1901)
Y

1903)
Y

1894)

1896)

1898)

1900)

1902)

1904)

1913)
Y

1915)
Y

1917)
Y

1919)
Y

1921)
Y

1923)
Y

1914)

1916)

1918)

1920)

1922)

1924)

1933)
Y

1935)
Y

1937)
Y

1939)
Y

1941)
Y

1943)
Y

1934)

1936)

1938)

1940)

1942)

1944)

1953)
Y

1955)
Y

1957)
Y

1959)
Y

1961)
Y

1963)
Y

1954)

1956)

1958)

1960)

1962)

1964)

1969)

CHECKLIST GROUP COMPLETE

1974)

Question Details

2
3
4

1) Equipment Rack(s) and/or Cabinet(s) installed as specified, including clearances, anchoring to floor and side bracing.
2) Equipment Rack(s) configured with vertical management per specification.
3) Cable Runway installed per specification.

1970)
INITIALS
:

DFD Project No.

27 08 00-28

1971)

1972)
DATE:

1885)

1886)

1887)

1888)

1905)

1906)

1907)

1908)

1925)

1926)

1927)

1928)

1945)

1946)

1947)

1948)

1965)

1966)

1967)

1968)

1973)

Construction Verification Checklist


27 11 00 Communications Equipment Room Fittings
1
1
2
3
4

4) Drop-outs in place where cable exits cable runway to equipment rack to control cable bending to within bend-radius specifications.
5) Equipment Rack(s), cable runway and other hardware as specified bonded to Telecommunications Ground (TGB or TGMB) in accordance specification requirements.
Rack or cabinet finish (paint) removed at point-of-contact with grounding hardware.
6) Power Strip / Surge Suppressor installed per specification.

1975)

1976)
Gr

Negative Responses
1977)
Dat
e
1978)
Fou
n
d

1979)
Fo
1980)
By

1981)
Locati
o
n

1982)
Reason
Response

1987)

1988)

1989)

1990)

1991)

1995)

1996)

1997)

1998)

1999)

2003)

2004)

2005)

2006)

2007)

2011)

2012)

2013)

2014)

2015)

2019)

2020)

2021)

2022)

2023)

for

Negative

DFD Project No.

27 08 00-29

1983)
Resolve
d
1992)
YES /
NO
2000)
YES /
NO
2008)
YES /
NO
2016)
YES /
NO
2024)
YES /
NO

1984)
Date
1985)
Resolv
ed

1986)

1993)

1994)

2001)

2002)

2009)

2010)

2017)

2018)

2025)

2026)

Resolution

Construction Verification Checklist


27 16 19 Communications Patch Cords, Station Cords, and Cross-Connect
Wire
1

7) CV-27 16 19 Communications Patch Cords, Station Cords,


8) And Cross-Connect Wire

1
2
3
4

9) Equipment Identification/Tag: _______


10) Location: _________________________

11)

A) COMMUNICATIONS PATCH CORDS, WORK AREA CORDS, AND CROSS-CONNECT WIRE

12)
D
13) Description of Work Performed
32)

50)

68)

33)

51)

69)

14) %
15) C
o
m
p
l
e
t
e

34)

52)

70)

17) Questions (See details below)


16) I
n
i
t
i
a
l
s

35)

53)

71)

23)
2

24)
3

25)
4

36)
Y

38)
Y

40)
Y

42)
Y

37)

39)

41)

43)

54)
Y

56)
Y

58)
Y

60)
Y

55)

57)

59)

61)

72)
Y

74)
Y

76)
Y

78)
Y

73)

75)

77)

79)

22)
1)

DFD Project No.

27 08 00-30

26)

27)

28)

29)

30)

31)

44)

45)

46)

47)

48)

49)

62)

63)

64)

65)

66)

67)

80)

81)

82)

83)

84)

85)

Construction Verification Checklist


27 16 19 Communications Patch Cords, Station Cords, and Cross-Connect
Wire
1

86)
12)
D

87)
13) Description of Work Performed

104)

122)

140)

158)

105)

123)

141)

159)

14) %
15) C
o
m
88)
p
l
e
t

16) I
n
i
t
89)
i
a
l
s

106)

107)

124)

142)

160)

125)

143)

161)

176)

CHECKLIST GROUP COMPLETE

181)

Question Details

2
3

1) Fiber Optic Patch Cords delivered to Agency.


2) Copper Twisted Pair Patch Cords and Work Area Cord Cords delivered to Agency.

17) Questions (See details below)


90)
92)
94)
96)
Y
Y
Y
Y
91)

93)

95)

97)

108)
Y

110)
Y

112)
Y

114)
Y

109)

111)

113)

115)

126)
Y

128)
Y

130)
Y

132)
Y

127)

129)

131)

133)

144)
Y

146)
Y

148)
Y

150)
Y

145)

147)

149)

151)

162)
Y

164)
Y

166)
Y

168)
Y

163)

165)

167)

169)

177)
INITIALS
:

DFD Project No.

27 08 00-31

178)

98)

99)

100)

101)

102)

103)

116)

117)

118)

119)

120)

121)

134)

135)

136)

137)

138)

139)

152)

153)

154)

155)

156)

157)

170)

171)

172)

173)

174)

175)

179)
DATE:

180)

Construction Verification Checklist


27 16 19 Communications Patch Cords, Station Cords, and Cross-Connect
Wire
1
1
2

3) Coax Patch Cords and Work Area Cords delivered to Agency.


4) Cross-connect wire and Spool holders delivered to Agency.

182)

183)
Gr

Negative Responses
184)
Dat
e
185)
Fou
n
d

186)
Fo
187)
By

188)
Locati
o
n

189)
Reason
Response

194)

195)

196)

197)

198)

202)

203)

204)

205)

206)

210)

211)

212)

213)

214)

218)

219)

220)

221)

222)

226)

227)

228)

229)

230)

for

Negative

234)

DFD Project No.

27 08 00-32

190)
Resolve
d
199)
YES /
NO
207)
YES /
NO
215)
YES /
NO
223)
YES /
NO
231)
YES /
NO

191)
Date
192)
Resolv
ed

193)

200)

201)

208)

209)

216)

217)

224)

225)

232)

233)

Resolution

You might also like