100% found this document useful (2 votes)
3K views8 pages

Background MRP Procedure

This document provides steps to run MRP in the background for all plants in the network. It involves creating a planning variant using transaction code MDBT, selecting scope and processing options, and saving the variant. The variant is then used to start an immediate background MRP run. Its status and results can be monitored through job overview and viewing the generated MRP list.

Uploaded by

ranedivakar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
3K views8 pages

Background MRP Procedure

This document provides steps to run MRP in the background for all plants in the network. It involves creating a planning variant using transaction code MDBT, selecting scope and processing options, and saving the variant. The variant is then used to start an immediate background MRP run. Its status and results can be monitored through job overview and viewing the generated MRP list.

Uploaded by

ranedivakar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Procedure for how to take Background MRP Run

1.0 PURPOSE :
To understand how to take MRP Run in Background for All Network Plants, using
Transaction Code:-MDBT.

2.0 SCOPE:
To view Background MRP List.

3.0 METHOD:
Please follow the procedure as given below:

Transaction code MDBT


Menu Path SAP menu  Logistics  Production  MRP  Planning  Total
Planning  MDBT--Background MRP

Enter T. code:- MDBT

Or Select easy access

1
Procedure for how to take Background MRP Run

Click here to Create


Planning Variant

Enter Name of
Planning Variant

2
Procedure for how to take Background MRP Run

Select All
Selection Screens

Click Here

3
Procedure for how to take Background MRP Run

Click Here

Select Scope of Planning


Select Processing Key: NETCH,
Create Purchase Req: 1,
Schedule Line: 1 No Schedule Line,
Create MRP List: 1 MRP List,
Planning Mode: 3 Delete & recreate
planning data,
Scedulling: 2 Lead Time Scheduling
and Capacity Planning,
Planning Date: Blank

Select 001-Deterministic MRP run (Materials with


MRP type 'PD')

After filling information please click on Attributes. Here you need to do configuration for Scope of
Planning (Tcode: OM0E) or you can select single plant also. In Scope of planning you take
multiple plants.

4
Procedure for how to take Background MRP Run

Save It (Ctrl S)

Enter Meaning Full Description

Here you select different option as per your requirement like protect variant.
After Saving Variant you will get Variant SCM VB Saved.

See here New Planning


Variant Created.

we need to start our background MRP Run through Tcode- MDBT.

5
Procedure for how to take Background MRP Run

Click here to start immediately


Background MRP Run

Here you will see Planning


Variant is Started

Then go Tcode: SM37- Job Overview


Execute

Enter User ID from which you have


started Background MRP

6
Procedure for how to take Background MRP Run

Click on Spool

Select Background Job


(RMMRP000)

After Successful completion of Background Job, please select the Job & then Click on Spool

Click here to see


MRP List

7
Procedure for how to take Background MRP Run

Here you will MRP list generated through Background MRP Job. This list will show which
materials are planned with Plant & their exception group.

You might also like