Norman "Destin Landing" PUD Narrative

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

DESTIN LANDING

NORMAN, OKLAHOMA

A PROJECT BY SHAZ INVESTMENTS AND RIEGER, L.L.C.

PLANNED UNIT DEVELOPMENT


APPLICATION FOR REZONING AND
MASTER DEVELOPMENT PLAN

Revised Draft 4 February 2016


SUBMITTED BY:
SHAZ INVESTMENT GROUP LLC AND RIEGER, L.L.C.

PREPARED BY:

Attn: Phil Stuepfert


651 Prairie Pointe Drive
Suite 201
Yorkville, IL 60560

TABLE OF CONTENTS
I.

INTRODUCTION
A. Background and Intent

II.

PROPERTY DESCRIPTION/GENERAL SITE CONDITIONS


A.
B.
C.
D.
E.
F.
G.

III.

Location
Existing Land Use and Zoning
Elevation and Topography
Drainage/Detention
Utility Services
Fire Protection Services
Traffic Circulation, Access and Impact

MASTER PLAN AND DESIGN STANDARDS


A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.

Process for City approval


Overall Design Intent
Greenways Parks, Trails and Open Space
Stormwater and Utilities
Land Use, Density and Design Standards
Single-Family Residential District - Estate;
Single-Family Residential District - Low Density;
Single-Family Residential District - Medium;
Single-Family Residential District - High Density;
Single-Family Residential District - Patio Homes;
Multifamily District; Apartments or Townhomes;
Multifamily/Senior Housing District
Commercial District
Mixed Use District
Miscellaneous Development Criteria

EXHIBITS
A.
B.
C.
D.
E.
F.
G.
H.

Proposed Master Development Plan


Wastewater Collection Study (on file at the City of Norman)
Traffic Impact Analysis (on file at the City of Norman)
Greenspace
Drainage Impact Report (on file at the City of Norman)
Phasing Plan
Preliminary Landscaping Plan
Typical lot layouts.

Destin Landing

Page 1

I.

INTRODUCTION
A. Background and Intent:
The DESTIN LANDING PROJECT (Project) is a 762 acre master planned
community in the southeast portion of the City of Norman. The legal descriptions of
the PROJECT are being provided concurrently herewith through the Master
Development Plan submittals as part of the overall submittal. While the primary
focus of the PROJECT is residential, the PROJECT also features commercial, mixed
use and service that play an integral part in creating a unique mixed use master
planned community environment. The greenways and open space areas will be a
primary focus of the development providing recreational and scenic amenities for the
entire community.
The Applicants are requesting an amendment to the Norman 2025 Land Use Plan,
and a rezoning of the properties to Planned Unit Development (PUD), and are
submitting a Rezoning Application, 2025 Application, and Master Development Plan.
This PUD is intended to carry out the goals of this master planned community. The
PUD is written to ensure a unified, quality development. Through creativity in design,
sensitivity to the characteristics of the site and compatibility of land uses, a
commitment is made to the future of the community.
The following principles will be used in guiding development toward a planned
community which can respond to changing market conditions:

Encouraging innovation through FLEXIBILITY in site design with respect to


building spacing, setbacks, height and density of buildings, open space, and
parking.

Allowing a variety of CREATIVE SOLUTIONS to the PROJECT design that


may not be possible through the strict application of the local zoning
ordinance and subdivision regulations.

Encouraging a mixed-use, MASTER PLANNED community providing for


residential, recreational, commercial, and service uses.

Encouraging INNOVATIONS in land use that result in the availability of


attractive development opportunities.

Promoting more EFFICIENT use of land and energy through reasonable


infrastructure requirements.

Maximizing the UNIQUE and beautiful physical features of the site.

Creating development patterns and PROJECT design that further the overall
GOALS and POLICIES of the City of Norman.

Destin Landing

Page 2

Providing appropriate TRANSITIONS between land uses and to adjacent


properties while encouraging an overall community focus.

Providing FLEXIBILITY for both land use type and density to be


TRANSFERRED between parcels, responding better to the needs of the
changing market conditions over a long period of time.

Encourage FLEXIBILITY and CREATIVITY in the design of streets to allow


departure from strict enforcement of present codes regarding design
standards, street widths, drainage, curb and gutters, street lighting,
landscaping, utilities and similar aspects.

Upon completion, the PUD will provide a more appealing residential and pedestrian
friendly community than would otherwise be attainable under conventional practices
and regulations. Therefore, flexibility in the design helps to provide a more
innovative and livable community which is positive for future residents. This more
efficient design within the PROJECT will allow for uniquely large amounts of natural
open space, which will enable the protection of more areas of the natural
environment.
The PROJECT is brought forth as a collaborative planning effort by two independent
and unaffiliated owners of the two Tracts of land that form this PUD. The Rieger
Tract is comprised of approximately 160 acres on the north side of Cedar Lane
Road. The Shaz Tract is comprised of approximately 600 acres to the south of
Cedar Lane Road. The Applicants have come together in this PUD and Master
Development Planning in order to provide a better planned development of all 762.65
acres such that public infrastructure of roads, utilities, and the like can be cohesively
planned in a most efficient manner. The parties however are not affiliated and
therefore the tracts of land may follow different paths and methods as preliminary
and final plats are submitted for approval and as they develop in the future under the
auspices and direction of each independent owner.

Destin Landing

Page 3

II.

PROPERTY DESCRIPTON/GENERAL SITE CONDITIONS


A. Location
The PROJECT is located in the southeast area of the City of Norman. The property
is generally located west and east of 36th Avenue SE, north and south of Cedar
Lane Road, north of Post Oak Road and south of State Highway No. 9.
B. Existing Land Use and Zoning
The property is all currently zoned A-2, Rural Agricultural District. The majority of the
site is currently raw land, with the only uses being agricultural and one active oil well
on the Rieger, L.L.C. Tract. Norman 2025 has the property shown as Very Low
Density Residential. To the west of the PROJECT is The Links multifamily golf
course development. To the north is Saxon Park, to the south and east is primarily
single family estate and agricultural uses. The property lies within both the Norman
and Noble Public School Districts, with Cedar Lane Road being the dividing line
between the two.
C. Elevation and Topography
The site consists of a variety of topographies; although generally of gentle terrain,
some areas along the proposed greenways have some steeper slopes. Generally
the site drains to the northeast direction, however, the far southwest section of the
property flows to the southwest. There are some areas of floodplain and WQPZ
which are proposed to be in open space and future detention areas.
D. Drainage/Detention
A Drainage Report has been prepared to illustrate the general detention
requirements and the solutions planned. A prominent feature of this PROJECT is
the intent to manage the storm water through environmentally natural methodologies
as much as reasonably feasible. A regional drainage solution, embracing the entire
area within the PUD, is submitted as EXHIBIT E. Specific detention plans will be
submitted with each Preliminary Plat and Final Plat, as required by City of Norman
ordinances.
E. Utility Services
Many of the required utility systems for the PROJECT (including water,
wastewater/sewer, gas, telephone and electric) are currently located in general
proximity to the overall property area and boundaries. The Master Development
Plan, as submitted herewith, provides the schematic plan as to extension of the
necessary utilities to service the PROJECT. EXHIBIT B provides a description of the
wastewater collection plan for the PROJECT.
F. Fire Protection Services
Fire Protection services will be provided by the City of Norman Fire Department and
by Owner provided building sprinkler systems where required by building codes.

Destin Landing

Page 4

G. Traffic Circulation, Access and Impact


Traffic circulation and access in the PROJECT is intended to be pedestrian friendly.
The vehicular circulation will be creative in order to create a strong community
character and feel. Therefore, the traffic patterns are intentionally designed to create
an environment that is not dominated by the vehicle yet allowing both pedestrians
and vehicles to exist in a cohesive manner. The main community access drives
through the PROJECT are curvilinear in nature with well-placed scenic views to open
space and parks.
1. Access:
The access to the PROJECT will be as shown on the Master Development Plan.
Primary vehicular access to the PROJECT is planned along the section line
corridors, specifically Cedar Lane Road, Post Oak Road, and 36th Avenue SE.
The PROJECT has initially planned public streets to serve all residential lots.
However, the Applicants have the option to develop private streets in some
parcels where a gated area is desired so long as gated entries are designed and
constructed to City of Norman standards. All internal streets will have adequate
circulation provided for the fire department and City Waste Management
Services.
Due to the general nature of a Master Development Plan, it is premature to list
the number of public street intersections. Subdivision streets shall not open onto
an arterial street except at an average interval of not less than one-quarter mile,
measured from the centerlines. The number of full access street intersections
along Cedar Lane Road, Post Oak Road and 36th Avenue SE will comply with
the City's Subdivision Regulations (e.g., no closer than 1/3 of a mile apart).
Due to the general nature of a Master Development Plan, it is premature to list
the number of driveways that will be allowed. The number and location of
driveways will be established at a later date in accordance with the City's
Engineering Design Criteria (EDC). Such approval will coincide with the
approval of the final site plan.
Minimum spacing between driveways may vary (330 to 660 feet) depending on
the number of trips generated by the development served by each driveway. The
corner clearance between a driveway and a public street intersection may vary
between 200 and 350 feet, depending on the type of intersection traffic control at
the intersection.
2. Traffic Impact:
A Revised Traffic Impact Analysis (TIA) EXHIBIT C has been provided
herewith.
Further, the City's EDC requires the preparation of a Traffic Impact Analysis for
developments that cause a significant increase in traffic (100 vehicle-per-hour
increase in traffic during the peak hour).

Destin Landing

Page 5

The general nature of a Master Plan and the anticipated changes in land use that
come with the refinement of the plan, will affect the projected traffic used for
analysis in the TIA. To support a fluid process that defines specific land uses
over the next 30 years, the TIA shall be revised as future plats are reviewed and
considered.
As the project develops over the next 30 years, subsequent traffic studies will be
performed on each development. These additional studies will have specific land
uses, sizes and driveway information which will assist in fine tuning the analyses
and recommendations as the project develops.

III. MASTER PLAN AND DESIGN STANDARDS


A. Process for City Approval
This 762 acre Master Development Plan is being submitted in a process that is
designed to allow for the overall master planning of the area to be structured and
adopted first, and then to allow preliminary plats to come forward through the
planned phasing as each phase is ready for development. Along with this PUD, the
City Greenbelt Commission will review the Master Development Plan, multiple Predevelopment meetings will be or have been held, and a 2025 Plan Change will be
considered. Consequently all processes as related to the zoning and land uses will
be followed as usual with the Master Development Plan. This Master Development
Plan will set forth the long term strategy and rules for development of the Property,
including but not limited to the maximum amounts, type and location of future
development over decades through the Master Development Plan.
The Master Development Plan through this PUD will allow for a regulatory framework
to guide development, and will provide an effective context for decision making by
both the Developer and the City as to the various components of the Master
Development Plan. The Master Development Plan will address such issues as
parks, trails, recreation and open spaces, and master utility plans, and phasing
plans.
The City Council and Planning Commission will review and consider all preliminary
plats as normal as each preliminary plat comes forward. Each preliminary plat will be
brought forward in conformity to this adopted PUD structure and will therefore set the
Master Development Plan into motion through the preliminary plats as they are
presented in full detail.
Due to the very long term buildout anticipated in such a large 762 acre development,
the Master Plan PUD document allows for some flexibility where certain aspects of
the PROJECT can adapt as time progresses over decades.
B. Overall Design Intent
This master planned community is creatively planned as a high quality, mixed use
community with a blend of commercial, mixed use, multifamily, and multiple densities
of residential uses. The vision for the community is based upon the expansive

Destin Landing

Page 6

network of open space and trails that interconnect to the neighborhoods as well as to
regional locations such as Saxon Park on the north side of this PROJECT. This
community has been designed to create pedestrian friendly neighborhoods which are
closely knit and linked to the non-residential uses. The blending of uses and
pedestrian/bicycle friendly design is intended to reduce the dependency on the
vehicle within the community and provide an environment which encourages
alternative modes of transportation (bicycle or walking).
1. Individual parcels shall be designed around a neighborhood focus/theme while
reinforcing the overall identity and character of the PROJECT.
2. The clustering of buildings is encouraged in order to minimize the amount of land
used, create open space areas, shorten vehicular trips, reduce hard surface areas
for drainage, cost, and aesthetics, and to provide visual interest to the community.
3. Buildings, streets, and open space areas shall be situated to maximize the
amount and qualities of views and natural light.
4. Building placement, size, height, mass and scale shall be compatible with the
surrounding area and provide a reasonable transition from adjacent streets and
properties.
5. The use of unifying elements, including but not limited to the use of building
materials, colors, landscaping, and signage, is encouraged.
6. The natural features (i.e., drainage ways and existing trees) of the site have been
identified and incorporated into the planning process. The Master Development Plan
preserves these features to their best advantage and further enhances these
elements to create an open space network and quality environment in which to live.
C. Greenways - Parks, Trails and Open Space
Greenways and Open Space Network:
The greenways and open space network including parks, trails, stormwater control
areas, and passive open space is the primary focus of this community. Significant
and expansive open space of at least 210.57 acres is provided in this community
(see EXHIBIT D).
Parks:
A roughly 4.4 acre neighborhood public park is the centerpiece of the southwest
quadrant and expansive greenways are interwoven throughout the entire PROJECT.
Smaller parks are located at key locations within residential neighborhoods and next
to or within the commercial/mixed uses.
Private park land, as may be proposed, shall be owned and maintained by a property
owners association. All plats and development shall comply with the parkland
dedication ordinance and all park land decisions shall be made as approved by the
City Council, after review and recommendation of the Norman Board of Parks
Commissioners. Any single preliminary plat containing 2,500 or more of projected
population will be required to provide public parkland only, with no option for fee in
lieu of land or private park.
Trails:
A significant feature of this PROJECT is that the various neighborhoods and nonresidential areas are intended to be connected by a network of trails. The various
uses of commercial, residential, multifamily, mixed use and service shall interconnect

Destin Landing

Page 7

with minimal crossing of major roads. Streets within the PROJECT are intended to
slow traffic without the need for any calming devices to be superimposed within the
streets.
D. Stormwater & Utilities Design - Environmentally Friendly Solutions
Stormwater
One of the main goals of this community is to provide environmentally friendly
stormwater solutions and to be sensitive to the regional water supply (Lake
Thunderbird). Therefore, water quality methods are incorporated into the open space
network and multiple solutions are provided within and adjacent to the Water Quality
Protection Zones (WQPZ). Some of the specific goals of this PROJECT are:
Utilize innovative storm water management features within the open space
network and within the residential neighborhoods where appropriate.
Provide storm water treatment Best Management Practices (BMPs).
The size, depth, and outlet of the storm water detention elements is to be determined
by Final Engineering Plans, after acceptance of each preliminary plat, based upon a
controlled release rate of storm water runoff which shall not exceed the rate allowed
by the City of Norman.
Water System:
The water system is being proposed as a master plan that presents a solution for the
extension of water services to all phases of the site over the life of the project. The
proposed water system is such that it expands in line with the phasing of the project
and thus is fitting to the expansion of the project as it progresses. The master plans
for the water solution are being submitted herewith to the City and are being
approved with this Master Development Plan PUD. It may be that, as the project
evolves and develops, different strategies and plans are adopted to accommodate
the project as it develops over decades. For now, upon adoption the system as put
forth in the master plan will sufficiently serve the project needs.
Sanitary Sewer System:
Likewise, the sanitary sewer system is being proposed as a master plan that
presents a solution for the extension of sanitary sewer services to all phases of the
site over the life of the project. The proposed sanitary sewer system is such that it
expands in line with the phasing of the project and thus is fitting to the expansion of
the project as it progresses. The master plans for the sanitary sewer solution are
being submitted herewith to the City and are being approved with this Master
Development Plan PUD. It may be that, as the project evolves and develops,
different strategies and plans are adopted to accommodate the project as it develops
over decades. For now, upon adoption the system as put forth in the master plan will
sufficiently serve the project needs.
E. Land Use, Density and Design Standards
EXHIBITS attached hereto are incorporated herein by reference and further depict
the development criteria for each section. At this juncture, the Applicants have no
way of knowing what configuration for a parcel, lot or specific use, any buyer/tenant
might want for the areas shown. The Master Development Plan carefully and
thoughtfully divides the Property and designates separate Sub-Development Areas
(SDA). The SDAs are expected to be developed successively, each over a period

Destin Landing

Page 8

of multiple years, with the first SDA to be commenced within five (5) years of the
approval of the Master Development Plan, subject to the allowance for an extension
of time from the City through the extension procedures allowed for preliminary plats.
This does not preclude two or more SDAs being developed within the same time
frame. The entire Property is anticipated to take thirty (30) years or more to develop,
depending on economic and market conditions. Approval of a Final Plat for any part
of any SDA will continue the time allowance for the remaining SDA preliminary plats
to be brought forward into final plats under this adopted PUD. However, water and
sewer improvements for an entire SDA will be installed, for that particular SDA, at the
time the first part of that particular SDA is developed. Applicants propose the
following-described uses for all 762 acres of the Property, subject to further
qualifications as provided for in this PUD:
Residential Any uses currently permitted as a matter of right in the RE, R-1,
R-1A, R-2, R-3, and RM-6 zoning districts of the City of Norman Zoning
Ordinance;
Commercial Any uses currently permitted as a matter of right in the C-1,C-2,
O-1, and CO zoning districts of the City of Norman Zoning Ordinance;
Mixed Use Any uses currently permitted as a matter of right in the MUD
zoning district of the City of Norman Zoning Ordinance, or any uses put forward
as a combination of the above commercial, office, and low or high density
residential uses.

The primary land use categories, acres and percent of each land use:
Use
Acres
Percent
Single Family Estate
Single Family Low
Single Family Medium
Single Family High
Single Family Patio Homes
Multi-family/Apartments/Townhomes
Multi-family/Apartments/Senior
Total Residential

85.90
42.55
97.75
123.01
45.83
78.71
17.42
491.17

11
6
13
16
6
10
2
64

Total Commercial
Total Mixed Use
Total Multi-Family/Senior Housing/Service
Total Equestrian Facility
Total Open Space

37.89
8.91
9.41
4.70
210.57

5
1
1
1
28

Project Totals

762.65

100.0

The maximum total units for this PROJECT shall not exceed 3,500 dwelling units
(800 units on the Rieger Tract and 2,700 on the Shaz Tract). At 3,500 total dwelling
units per the entire Property of 762 acres, the gross density calculates to 4.5 units
per acre. Preliminary planned density and units may be shifted and transferred
between SDAs, but only within each ownership Tract (i.e,.density and units may be
transferred within the Rieger Tract and within the Shaz Tract, but no transfer of
density from the Rieger Tract to the Shaz Tract or vice versa), so long as the total
PROJECT units are not exceeded for each ownership Tract (800 Rieger; 2,700

Destin Landing

Page 9

Shaz) and the entire unit cap for the PROJECT (3,500). For purposes of calculating
traffic an average density is shown below for each land use SDA and on the
Preliminary Site Development Plan. However, the land uses and densities identified
for each SDA are flexible to allow for responsiveness to market conditions, while
maintaining the character and integrity of the overall development plan. For example,
Multi-Family/Apartments density may range from 8 du/ac to 22 du/ac as long as the
PROJECT total of allowable units is not exceeded. Zero lot line development and
cluster housing are also permitted in all multi-family residential SDAs and shall meet
building code. All other permitted uses shall follow the City of Norman Zoning
Ordinance and shall meet all building codes.

Residential Land Use

Average Density

Residential Estate (single family lots)


Residential Low Density (single family)
Residential Medium Density (single family)
Residential High Density (single family)
Patio Homes
Service (Assisted Living/Nursing Home)
Multi-Family/Apartments

1 lot/acre
3 lots/acre
4 lots/acre
6 lots/acre
6 lots/acre
13 beds/acre
15 units/acre

SDA boundaries are as depicted on the Master Development Plan to establish the
general parameters of each SDA, but they are NOT exact and may be adjusted
freely as necessary to maximize the useable land area. The actual areas or
boundaries of the SDAs may be modified by up to 20% prior to final plat approval, or
up to the edges of the WQPZ zones and FEMA flood plain zones, as such zones
may exist or pursuant to City of Norman subdivision regulations, and subject to open
space and detention requirements, and subject to adopted development regulations
of the City of Norman as pertaining to FEMA flood plains and WQPZ zones, and as
per US Army Corps regulated Blue Line streams requirements. An approved final
plat shall determine the actual final boundary of each SDA. Densities noted for each
land use are gross densities for the SDA and are not intended to represent final lot
sizes or final areas of each SDA. Allowable lot sizes are provided below. Transfer of
densities is permitted between SDAs within each ownership of Rieger and Shaz (but
not transferable from Rieger Tract to Shaz Tract or vice versa). Downzoning
(change to a less intense use) is allowed in all SDA parcels.
The PROJECT is being brought forth as a collaborative comprehensive planning
PROJECT by two different and unaffiliated owners and developers, Rieger and
Shaz, for the purpose of creating a unity of planning and cohesive connections and
trails. However, the developers, Rieger and Shaz, each retain the right to proceed
forward with the development of this PUD independently within each ownership after
the Master Development Plan is adopted.
Each separate development shall
continue to meet the PUD and Master Development Plan as adopted.
Approval of a preliminary plat by the City Council shall be valid for a period of five (5)
years from the date of approval; provided, however, that if one (1) or more
final plats are filed of record within said five (5) years time frame, the preliminary
plat validity shall be extended for two (2) years, or a total of seven (7) years from the
initial date of approval by the City Council. Prior to the expiration of a preliminary
plat, previously approved by Planning Commission and City Council, the period of

Destin Landing

Page 10

validity may be administratively renewed by the Development Committee for one (1)
subsequent five-year term upon application by the property owner if the preliminary
plat to be renewed is identical to the preliminary plat on file or contains only minor
amendments.
F. Single-Family Residential District; Estate (30,000 s.f minimum lot size)
For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, single family detached residential density and units can be shifted
between parcels depending on current market conditions. Once a parcel is identified
for a specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the R-1 zoning uses subject to the
following qualifications, and to allow for at least the following within this
district:
a.
b.

c.

d.

2.

Setbacks shall be as provided as shown on attached EXHIBIT H.


Lots to be at least 30,000 gross square feet in area with
dimensions being generally 100-130 feet wide and 200-300 feet
deep, but with such dimensions not being a requirement as lot
dimensions can be widely varied throughout the community.
Open space areas are located throughout the community and
form an extensive feature of the PROJECT, and thus due to
extensive common area open space, impervious area coverage
ratios of each lot in this district shall be allowed up to 60%.
Any fencing on lot boundaries backing on to the major perimeter
roads (Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the
Community Drive will be installed by the developer and
maintained by the HOA in order to have a consistent aesthetic
look throughout the community.

Housing Construction
Homes in this district shall be standard construction, single family,
detached homes. Houses will be of standard wood frame construction.
Houses may be one or two stories, and may have attic storage areas
and/or basement areas, with a total dwelling height not to exceed 35 feet
at the eave. Each house shall have enclosed garages of two vehicles or
more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.
Up to one detached Guest House or secondary house unit shall be
allowed on the lots, so long as such structure:

Destin Landing

Page 11

a.
b.
c.

Is not taller in height than the main dwelling house; and


Does not have habitable conditioned area that is more than
twenty-five percent (25%) of the floor area of the habitable
conditioned space in the main dwelling house.
Is a detached or attached accessory building of a permanent type
of construction which includes living area and may include a full or
half bath. A guest house cannot be leased, subleased, rented or
sub-rented separately from the main dwelling. A guest house
must be located closer to the primary dwelling on the subject lot
than to a primary dwelling on any adjacent lot. The guest house
shall not be located more than one hundred feet (100') from the
primary dwelling on the subject lot, except where the City
determines that a greater setback is appropriate in light of
topography, vegetation or unique physical characteristics.

G. Single-Family Residential District; Low Density (9,800 s.f. minimum lot size)
For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, single family detached residential density and units can be shifted
between parcels depending on current market conditions. Once a parcel is identified
for a specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the R-1 zoning uses subject to the
following qualifications, and to allow for at least the following within this
district:
a.
b.

c.

d.

2.

Setbacks shall be as provided as shown on attached EXHIBIT H.


Lots to be at least 9,800 gross square feet in area with dimensions
being generally 70 feet wide and 140 feet deep, but with such
dimensions not being a requirement as lot dimensions can be
widely varied throughout the PROJECT.
Open space areas are located throughout the PROJECT and form
an extensive feature of the PROJECT, and thus due to extensive
common area open space, impervious area coverage ratios of
each lot in this district shall be allowed up to 70%.
Any fencing on lot boundaries backing on to the major perimeter
roads (Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the
Community Drive will be installed by the developer and
maintained by the HOA in order to have a consistent aesthetic
look throughout the community.

Housing Construction
Homes in this district shall be standard construction, single family,
detached homes. Houses will be of standard wood frame construction.
Houses may be one or two stories, and may have attic storage areas
and/or basement areas, with a total dwelling height not to exceed 35 feet

Destin Landing

Page 12

at the eave. Each house shall have enclosed garages of two vehicles or
more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.
Up to one detached Guest House or secondary house unit shall be
allowed on the lots, so long as such structure:
a. Is not taller in height than the main dwelling house; and
b. Does not have habitable conditioned area that is more than
thirty percent (30%) of the area of the habitable conditioned space
in the main dwelling house.
c. Is a detached or attached accessory building of a permanent
type of construction which includes living area and may include a
full or half bath. A guest house cannot be leased, subleased,
rented or sub-rented separately from the main dwelling. A guest
house must be located closer to the primary dwelling on the
subject lot than to a primary dwelling on any adjacent lot. The
guest house shall not be located more than one hundred feet
(100') from the primary dwelling on the subject lot, except where
the City determines that a greater setback is appropriate in light of
topography, vegetation or unique physical characteristics.
H. Single-Family Residential District; Medium (5,500 s.f. minimum lot size)
For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, single family detached residential density and units can be shifted
between parcels depending on current market conditions. Once a parcel is identified
for a specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the R-1 zoning uses subject to the
following qualifications, and to allow for at least the following within this
district:
a.
b.

c.

Destin Landing

Setbacks shall be as provided as shown on attached EXHIBIT H.


Lots to be at least 5,500 gross square feet in area with dimensions
being generally 50 feet wide and 110 feet deep or 45 feet wide by
125 feet deep, but with such dimensions not being a requirement
as lot dimensions can be widely varied throughout the PROJECT.
Open space areas are located throughout the PROJECT and form
an extensive feature of the PROJECT, and thus due to extensive
common area open space, impervious area coverage ratios of
each lot in this district shall be allowed up to 75%.

Page 13

e.

2.

Any fencing on lot boundaries backing on to the major perimeter


roads (Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the
Community Drive will be installed by the developer and
maintained by the HOA in order to have a consistent aesthetic
look throughout the community.

Housing Construction
Homes in this district shall be standard construction, single family,
detached homes. Houses will be of standard wood frame construction.
Houses may be one or two stories, and may have attic storage areas
and/or basement areas, with a total dwelling height not to exceed 35 feet
at the eave. Each house shall have enclosed garages of two vehicles or
more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.

I. Single-Family Residential District; High Density (4,000 s.f. minimum lot size)
For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, single family detached residential density and units can be shifted
between parcels depending on current market conditions. Once a parcel is identified
for a specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the R-1 or R-1A zoning uses subject
to the following qualifications, and to allow for, at least the following within
this district:
a.
Setbacks shall be as provided as shown on attached EXHIBIT H.
b.
Lots to be at least 4,000 gross square feet in area with dimensions
being generally 40 feet wide and 100 feet deep, but with such
dimensions not being a requirement as lot dimensions can be
widely varied throughout the PROJECT.
c.
Open space areas are located throughout the PROJECT and form
an extensive feature of the PROJECT, and thus due to extensive
common area open space, impervious area coverage ratios of
each lot in this district shall be allowed up to 75%.
d.
Any fencing on lot boundaries backing on to the major perimeter
roads (Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the
Community Drive will be installed by the developer and
maintained by the HOA in order to have a consistent aesthetic
look throughout the community.

2.

Destin Landing

Housing Construction

Page 14

Homes in this district shall be standard construction, single family, and/or


single family attached homes. Houses will be of standard wood frame
construction. Houses may be one or two stories, and may have attic
storage areas and/or basement areas, with a total dwelling height not to
exceed 35 feet at the eave. Each house shall have enclosed garages of
two vehicles or more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.
J. Single-Family Residential District; Patio Homes (4,000 s.f. minimum lot)
For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, single family detached residential density and units can be shifted
between parcels depending on current market conditions. Once a parcel is identified
for a specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the R-1 zoning uses subject to the
following qualifications, and to allow for at least the following within this
district:
a.
b.

c.

f.

2.

Setbacks shall be as provided as shown on attached EXHIBIT H.


Lots to be at least 4,000 gross square feet in area with dimensions
being generally 40 feet wide and 100 feet deep, but with such
dimensions not being a requirement as lot dimensions can be
widely varied throughout the PROJECT.
Open space areas are located throughout the PROJECT and form
an extensive feature of the PROJECT, and thus due to extensive
common area open space, impervious area coverage ratios of
each lot in this district shall be allowed up to 80%.
Any fencing on lot boundaries backing on to the major perimeter
roads (Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the
Community Drive will be installed by the developer and
maintained by the HOA in order to have a consistent aesthetic
look throughout the community.

Housing Construction
Homes in this district shall be standard construction, single family,
detached homes. Houses will be of standard wood frame construction.
Houses may be one or two stories, and may have attic storage areas
and/or basement areas, with a total dwelling height not to exceed 35 feet

Destin Landing

Page 15

at the eave. Each house shall have enclosed garages of two vehicles or
more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.
K.

Multifamily District; Apartments or Townhomes


For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A, however, multi-family density and units can be shifted between parcels to meet
current market conditions, so long as traffic impact, drainage and other issues of
infrastructure are adequate to handle such shift, and meet the requirements of the
traffic and storm water drainage master plans. Once a parcel is identified for a
specific land use, at the time of final plat, the following standards will apply.
1.

Lot Design
The purpose for the PUD is to extend the RM-6 zoning uses subject to the
following qualifications, and to allow for at least the following in this
District:
a.
b.
c.
d.

e.

f.

g.

Destin Landing

10 foot front yard building setback line. This is intended to allow


for the capability of living areas of the brownstone inspired
townhouses to come forward and embrace the streetscape.
5 foot side yard building setback line.
5 foot rear yard building setback line, or setback to the utility
easement along the back of yard if applicable, whichever is
greater.
The density of this area of the PUD shall generally be fifteen (15)
dwelling units per acre, however up to twenty (20) dwelling units
per acre may be achieved on some parcels as long as the total
PROJECT units is not exceeded.
Open space areas are located throughout the overall PUD
PROJECT and form an extensive feature of the PROJECT, and
thus due to extensive common area open space, there is no
minimum open space ratio and impervious area coverage ratios of
each lot in this district shall be allowed up to 85%.
Recreation space for this district is intended to be included in the
overall open space within the overall PUD, as it is intended that
this district will be easily walkable and connected to the open
spaces throughout the PROJECT.
Any fencing on unit lots backing on to the major perimeter roads
(Cedar Lane Rd, Post Oak Rd and 36th Ave.) and the Community
Drive will be installed by the developer and maintained by the
HOA in order to have a consistent aesthetic look throughout the
community.

Page 16

h.
i.

2.

No dumpsters may be located within 25 feet of a single family


residential lot.
RM-6 uses herein shall be exempt from open space ratio
requirements and floor area ratio requirements.

Housing Construction
Buildings in this district will be standard construction, wood frame
construction. Buildings may be three or more stories, with a maximum
eave height of 45 feet. Each dwelling unit shall have at least 1.8 parking
spaces total per unit if two or more bedrooms per unit, or one parking
space per one bedroom unit, of which parking spaces may be provided in
garages within or attached or detached to units and/or in common area
parking lots. Parking lots in this area of the PROJECT shall be generally
hidden behind the dwelling structures as related to the public frontage
streets. Garages, where provided, shall be accessed from the rear of the
dwelling units.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.

L.

Multifamily/Senior Housing District;


For location of this use refer to the Master Development Plan, as shown on EXHIBIT
A.
1.

Lot Design
The purpose for the PUD is to extend the RM-6 zoning uses subject to the
following qualifications, and to allow for at least the following in this
District:
a.
b.
c.

d.
e.

f.

Destin Landing

5 foot front yard building setback line.


5 foot side yard building setback line.
10 foot rear yard building setback line, or setback to the utility
easement along the back of yard, whichever is greater. If this land
use abuts single family a 20 rear yard building setback line will be
provided.
Impervious area coverage ratios of each lot in this district shall be
allowed up to 85%.
Recreation space for this district is intended to be included in the
overall open space within the overall PUD, as it is intended that
this district will be easily walkable and connected to the open
spaces throughout the community.
RM-6 uses herein shall be exempt from open space ratio
requirements and floor area ratio requirements.

Page 17

2.

Housing Construction
This district is planned to be developed as a location for multi-family uses.
Buildings may be one or more stories, with a maximum eave height of 45
feet.
Garages may be included within any independent dwelling
structures with one vehicle or more capacity.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. See
Section O.12.

3.

Parking
Parking may be accommodated by way of garages within each dwelling
where individual dwelling units are constructed, and/or by way of common
area parking lots within the district, and/or by way of parallel parking
along the streets within this district. Street parking in the public right of
way may not be counted towards required parking counts. Parking will be
provided at 1.8 spaces per unit basis.

4.

Ancillary Uses
In this community the uses allowable under RM-6 designation, this area
of the PUD will also allow commercial uses that are reasonably incidental
to, and supportive of, the operations of a senior housing/service oriented
businesses, such as, but not limited to, beauty salon, coffee shop, gift
shop, etc.

M.

Commercial District
For location of this use refer to the Preliminary Site Development Plan, as shown on
EXHIBIT A.
This community includes vibrant walkable commercial areas at key locations within
the PROJECT, which are connected back into the residential areas with trails. In
essence, the commercial districts serve at least in part as the town center focal
points of the residential community. The commercial area would feature walkable
streetscapes, with minimal or no building setback lines in order to create an intimate
pedestrian commercial feel to pedestrians passing by, and coming from, the homes
in the community.
1.

Uses Permitted.
The commercial areas of the PUD are intended to allow for any of the
following uses to be permitted:

Destin Landing

Page 18

a.

b.

2.

Any use that is permitted as a matter of right in the following


districts, subject to restrictive covenants as may be applicable:
O-1 Office-Institutional
CO Suburban Office Commercial
C-1 Local Commercial
C-2 General Commercial
Live/work units (of non-retail uses), where a single space is used
jointly for a permitted non-residential use as well as a residence
for the owner or operator of the non-residential use. The
residence must be placed on the 2nd floor or higher.

Parking Count Requirements.


Parallel parking may be allowed on the streets within the commercial
district to the extent the street width allows for parallel parking, and only in
front of commercial lots that have at least a 10 foot front yard setback
line. However, new cut back parking areas will be allowed only on
roadways carrying less than an average of 1,000 vehicles per day. Where
allowed, sufficient maneuvering space for safe backing must be provided.
The minimum width of the parking area, measured perpendicularly from
the edge of the travel lane, shall be as follows: Parallel 21 feet,
perpendicular 9 feet.
Parking quantities shall conform to the City of Norman zoning ordinance
on parking requirements as per use of each platted lot.

3.

Layout, Area and Height Requirements.


Setbacks:

a.

Side yard setback may be zero, except when buildings in this area
of the PROJECT abut property zoned for single-family detached
dwellings. In that case, side yard setback must be a minimum of
ten feet (10) for one story buildings, plus an additional five feet
(5) for each additional story, or portion thereof. (All is subject to
the building construction code and any adjustments required
therein.)

b.

Rear yard setback may be zero, except when buildings in this


area of the PROJECT abut property zoned for single-family
detached dwellings. In that case, the rear yard setback must be a
minimum of twenty feet (20) for up to two story buildings, plus an
additional ten feet (10) for every additional two stories, or portion
thereof.

There are no height


within a distance of
district the height of
required continuous
boundary.

Destin Landing

restrictions in the commercial district, except that


one hundred feet of any single family residential
any buildings shall be limited to fifty feet, with a
10 wide landscape buffer of trees along such

Page 19

Front facades of buildings shall be oriented toward public streets within or


abutting the commercial tract.
Blank unarticulated walls shall not be permitted along any exterior wall
facing a public street. Such walls shall have architectural treatments that
are the same as the front faade, including consistent style, materials,
colors, windows, and details.
Impervious area coverage ratios of each lot in this district shall be allowed
up to 90%.
All aspects of all exterior improvements made to any property in the
community, must be approved by a Property Owner Association (POA)
Architectural Control Committee in writing, in its sole discretion, prior to
commencement of construction. The City of Norman shall not issue a
building permit unless and until the POA has provided written approval of
the proposed improvements in the building permit application. Review by
the Architectural Committee is also required prior to the submittal to the
City of Norman. See Section O.12.
4.

Fencing
Within the commercial area, any fencing that is visible from the arterial
and internal roads shall be constructed primarily from the same exterior
materials of the commercial buildings the fences are associated with, or
from ornamental metal, decorative masonry fencing, decorative wood that
is in harmony with the primary structures on the property, or natural living
plant materials as a continuous barrier so long as such materials and
landscaping is maintained in good condition as an adequate screen by
the POA and/or property owner. If the commercial use is adjacent to
single family residential uses a 6 minimum opaque fence will be installed.
This fence shall be maintained by the POA (if one exists in a multi-owner
situation), or the owner, to ensure a consistent aesthetic feel throughout
the community.

5.

Loading/Service Areas
Any loading or service areas shall be located at the side or rear of the
commercial buildings, and screened from view of public roads, and in
such a manner that they are not visible from the adjacent arterial roads.
Screening walls shall be built from similar material to the exterior of the
primary faade of the commercial buildings and shall be located around
the loading and service areas such that they are screened from any
abutting residential lots.

6.

Dumpster and Trash Enclosures


Dumpsters shall be kept within an enclosure that is approved per City
standards and is primarily constructed of similar exterior materials as the
primary faade of the commercial building(s) it is associated with.

Destin Landing

Page 20

Dumpsters may be shared between multiple property occupants and


uses.
7.

Signage
All signage shall be in conformance with the City of Normans sign codes,
as amended from time to time, and comply with applicable commercial
regulations, subject to the POA Architectural Committee review and
approval in POA Architectural Committees sole discretion.

N. Mixed Use District


For location of this use refer to the Preliminary Site Development Plan, as shown on
EXHIBIT A.
This district includes a vibrant walkable mixed use and commercial area at key
locations within the PROJECT, which is connected back into the residential areas
with trails. The mixed use district area would feature walkable streetscapes, and
may feature minimal or no building setback lines in order to create an intimate
pedestrian commercial/mixed use feel to pedestrians passing by, and coming from,
the homes in the community.
1.

Uses Permitted.
The Mixed Use District of the PUD is intended to allow for the following
uses to be permitted:
a. Any use that is permitted as a matter of right in the following districts:
All uses listed in the Commercial Districts above.
b. Mixed-use buildings in which one or more dwelling units may be
located on the upper floor(s) provided that at least the first floor use is
a permitted use in C-1 districts.
c. Live/work units, where a single space is used jointly for a permitted
non-residential use as well as a residence for the owner or operator of
the non-residential use.

2.

Parking Count Requirements.


Parking quantities shall conform to the City of Norman zoning ordinance
on parking requirements as per use of each platted lot.

3.

Layout, Area and Height Requirements.


Setbacks:
a.

Destin Landing

Side yard setback may be zero, except when buildings in this area
of the PROJECT abut property zoned for any single-family
detached dwellings. In that case, side yard setback must be a

Page 21

minimum of five feet (5) for one story buildings, plus an additional
five feet (5) for each additional story, or portion thereof.
b.

Rear yard setback may be zero, except when buildings in this


area of the PROJECT abut property zoned for single-family
detached dwellings. In that case, the rear yard setback must be a
minimum of ten feet (10) for up to two story buildings, plus an
additional ten feet (10) for each additional two stories, or portion
thereof.

c.

Buildings should generally be constructed at the front property


line, but may be set back up to ten feet (10) from the property line
to accommodate for architecturally required indentations or for
increased public sidewalk or plaza areas. Building step-backs are
permitted above the second floor of any building.

There are no height restrictions in the mixed use district, except that
within a distance of one hundred feet of any single family residential
district the height of any buildings shall be limited to fifty feet, with a
required continuous 10 landscape buffer of trees along such boundary.
Blank unarticulated walls shall not be permitted along any exterior wall
facing a street, parking area, or walking area. Such walls shall have
architectural treatments that are the same as the front faade, including
consistent style, materials, colors, windows, and details.
Open space areas are located throughout the overall PROJECT and form
an extensive feature of the PROJECT, and thus due to extensive
common area open space, impervious area coverage ratios of each lot in
this district shall be allowed up to 90%.
4.

Fencing/Screening
Within the mixed use area, any fencing that is visible from the arterial and
internal roads shall be constructed primarily from the same exterior
materials of the commercial buildings the fences are associated with, or
from ornamental metal, decorative masonry fencing, decorative wood, or
natural living plant materials as a continuous barrier. If the nonresidential use is adjacent to single family residential uses a 6 minimum
opaque fence will be installed. This fence shall be maintained by the
HOA to ensure a consistent aesthetic feel throughout the community.
This fence should be maintained by the HOA (if one exists in a multiowner situation), or the owner, to ensure a consistent aesthetic feel
throughout the community.

5.

Loading/Service Areas
Any loading or service areas shall be located at the side or rear of the
commercial buildings, and in such a manner that they are not visible from
the adjacent arterial roads. Screening walls shall be built from similar
material to the exterior of the primary faade of the commercial buildings,

Destin Landing

Page 22

and/or living natural plants shall be located around the loading and
service areas such that they are screened from any abutting residential
lots. Applicants may request an alley waiver on preliminary plats for the
mixed use areas in this PROJECT.
6.

Dumpster and Trash Enclosures


Dumpsters shall be per City standards and kept within an enclosure that
is primarily constructed of similar exterior materials as the primary faade
of the commercial building(s) it is associated with. Dumpsters may be
shared between multiple property occupants and uses.

7.

Signage
All signage in any area of the PROJECT shall be in conformance with the
City of Normans sign codes, as amended from time to time, and comply
with applicable commercial or mixed use regulations, subject to the POA
Architectural Committee review and approval in POA Architectural
Committees sole discretion.

O.

Miscellaneous Development Criteria


1.

Site Plan and Final Plat


For all cases of subdividing and development within the scope of this
Master Development Plan, a preliminary plat of the land in question shall
be drawn and submitted to the Planning Commission and City Council.
This Master Development Plan is not intended to comply with or fulfill the
requirements of a preliminary plat and thus the requirements of a
preliminary plat and all associated documentation shall be fulfilled upon
each part of the Master Development Plan as it is brought forward for
consideration. The Master Development Plan currently submitted with
this PUD may be further refined, subject to final approval by the Norman
City Council, once preliminary and final site development plans and plats
are submitted with each preliminary and final plat. As the PUD process is
intended to foster innovative and creative design, the Applicants may
exercise some flexibility in the design and layout of the roads and parcels
as shown on the preliminary plat at such time of preliminary plat
submittal.
Changes/modifications to the Master Development Plan:
Major Changes:
Major changes shall include any significant and substantial changes to
the proposed Master Development Plan as submitted herewith and
changes that require a formal amendment of this Ordinance, or any other
change for which a public hearing is required by law or by the City Code
except as specifically provided herein. Major changes are those that
significantly alter the layout, densities, and uses put forth in the Master
Development Plan, alter any traffic master plans except as allowed below,
or significantly alter the design or scope of the Master Development Plan.

Destin Landing

Page 23

Whether a change is major or minor shall first be determined by the City


Planning Director. If a developer or landowner disagrees with the City
Planning Directors decision, appeal may be taken to the City Council. It
is noted that pursuant to Section III.E. above, density locations and
boundaries of each of the SDAs may be changed and thus will NOT be
considered major changes. However, the maximum densities cannot be
changed without City Council approval.
Changes to parkland location, for either a permanent or temporary park,
may be approved administratively by the Development Committee but
only upon approval by the Director of Parks and Recreation, or his or her
designee. If the Director of Parks and Recreation or his or her designee
denies a proposed change in parkland location, the application for
renewal of the preliminary plat cannot be approved administratively.
Traffic master plan alterations may be approved by the Development
Committee, so long as the layouts of the traffic corridors are not
substantially altered. All alterations to the traffic master plan must
conform to adopted public safety and traffic management standards
before being approved administratively. If the Director of Public Works or
his or her designee denies a proposed change in the traffic master plan,
the application for renewal of the preliminary plat cannot be approved
administratively.
Major changes must be approved by the City Council after such hearing
and recommendation by the Planning Commission as required by statute
or City Ordinance pursuant to submittal and processing of a petition filed
by Owner, with notice to all owners within 350 feet of the subject property,
as set forth in the City Code.
Minor Changes:
Minor changes shall include any change not defined herein as a major
change or a technical change. Minor changes may be approved by the
Development Committee.
Technical Changes:
Technical changes shall include any change to the engineering plans and
specifications, any change to the building plans or changes in the Master
Development Plan which are determined by the Development Committee
as in substantial compliance with the PUD.
2.

Park/Open Space/Amenities
a.

Destin Landing

At least fifteen percent (15%) of the total land areas within each of
the two Tracts of ownership (15% of the Shaz 600 acres, and 15%
of the Rieger 160 acres) within the Property will be designated as
permanent open space. Subject to the modifications allowable
under Section III.E., at a minimum the open space areas will be as
shown on Exhibit D Greenspace Exhibit; additional open space
areas may be included on future preliminary plats. Within this

Page 24

community open space and green space areas consist of planned


walkways, trails, playground areas, and landscape/natural areas.
The open spaces also include the areas planned for private park
land and associated structures and uses consistent with Park
Land Zoning District are allowed for in the open space areas.
b.

Public park donation will comply with the requirements of the City
of Norman parkland dedication code, as being either a public
parkland donation, a private parkland commitment in twice the
amount of the required public donation, or a fee in lieu of a public
park dedication, or may be a combination of any of the three
methods (such as partially a public dedication and partially a fee in
lieu of).

c.

Walking trails will be constructed at various locations throughout


the greenways and open space common areas, with such trails
being built from hard surfaces and/or natural surfaces, and/or
other suitable materials as appropriate to the location within the
community.

d.

The PROJECT will comply with City Ordinances and regulations


relating to landscaping and drainage detention.
On-site
landscaping (including streetscaping) will be installed when a
Building Permit is issued.

The owner of any given lot will always be responsible for the installation
and maintenance of landscaping, plus the installation of any applicable
streetscaping on each such lot.
3.

Project Signage
Each and every sign must comply fully with the City of Norman sign
ordinance, except as specifically modified by the following:
a.

Destin Landing

Entranceways to residential areas:


Each entrance to this PROJECT (as shown on the Preliminary
Plat) from the main adjacent roads (Cedar Lane, Post Oak and
36th Avenue) may contain an entryway sign(s) designating the
PROJECT or area name. The sign(s) may be lit and landscaped
with appropriate vegetation and planter areas designed so as not
to interfere with traffic sight lines.
The setback for ground entranceway signs may be a minimum
of ten feet (10) from the right of way, which includes signs that
can have an increased size under existing City ordinances.
Signage can bear only the name of this PUD Development
(the Rieger tract and the Shaz tract may have different
names).
Signage must be less than 15 in height.
All signage shall be outside of the traffic sight line triangles as
this is not a consent to encroach upon such.

Page 25

4.

b.

Model Signage
Each model home shall be allowed one (1) model description sign
per Section 18-411 of the Norman Sign Code.

c.

Each Applicant shall be allowed up to four (4), two-sided,


temporary sales signs of one hundred (100) square feet on each
Tract of the PROJECT. Said signs shall be removed when 100%
of the lots have been sold to residential homeowners.

Streets, parking and sidewalks


a.

Streets:
Streets within the PROJECT are designed creatively to foster a
unique community feel. Curvilinear streets and reduced pavement
widths provide less impervious surface and less storm water
runoff. The Arterial streets will be constructed per the City of
Norman standards. Streets within commercial and mixed use
parcels can follow the City of Norman standards. For residential
streets within the PROJECT the following street standards apply:
Collector (Community Drive):
60 right of way width
34 pavement (face of curb to face of curb)
5 sidewalks on both sides of the street
10 tree yard between the curb and sidewalk
No on street parking
Local Street (internal to single family detached parcels):
50 right of way width
26 pavement (face of curb to face of curb)
4 sidewalks on both sides of the street
9 tree yard between the curb and sidewalk
Minor Local Street (within the Single Family Estate and Low
Density parcels):
50 right of way width with curb and gutter or 60 width with ditches
(no curb and gutter)
24 pavement (curb to curb)
4 sidewalk on both sides of the street
9 tree yard between the curb and sidewalk
Local Street (internal to multi-family parcels only):
60 right of way width
36 pavement (curb to curb)-10 travel lanes and 8 parking lane on
both sides
4 sidewalks on both sides of the street
9 tree yard between the curb and sidewalk
o
New cut back parallel parking areas will be allowed only
on roadways carrying less than an average of 1,000
vehicles per day. Where allowed, sufficient maneuvering
space for safe backing must be provided. The minimum

Destin Landing

Page 26

width of the parking area, measured perpendicularly from


the edge of the travel lane, shall be as follows: Parallel 21
feet.

5.

b.

Sidewalks:
All sidewalks will be at least four feet (4) wide and provide
adequate access to the buildings along with all PROJECT
amenities. A five-foot wide City sidewalk will be provided generally
along the section line roads that abut the PROJECT, constructed
to City of Norman Standards. Sidewalks shall be placed no less
than 1' from the abutting property lines.

c.

Sidewalks in single family detached parcels:


Sidewalks within single family detached parcels will be provided
on both sides of the street.

d.

Sidewalks along Cedar Lane:


Current City of Norman ordinances require two (2), five foot (5)
wide sidewalks, one on each side of Cedar Lane, each running
the entire east-west length of the Property

e.

ADA guidelines:
Sidewalks will meet ADA guidelines, however, any trails within the
PROJECT shall be excluded from any requirements to meet ADA
guidelines as many of them are planned to follow the natural
landscape and feature the natural beauty of the terrain. Therefore,
meeting ADA guidelines may not be feasible.

f.

Block length:
Block length within single family detached parcels can be
generally up to 700 in length, measured along the centerline of
block.

g.

Cul-de-sac:
A cul-de-sac shall not generally exceed 600' in length. In large
estate lot areas, cul-de-sacs shall not exceed 1200' or 16 lots,
whichever is greater.

Transportation Improvements
Transportation improvements shall be provided pursuant to the Traffic
Impact Analysis and recommendations therein, as such have been
adopted with this PUD, or with future preliminary and final plats.

6.

Right of Way
Transportation improvements shall be provided pursuant to the Traffic
Impact Analysis and recommendations therein, as such have been
adopted with this PUD, or with future preliminary and final plats

7.

Destin Landing

Development Phasing

Page 27

The Applicants shall be permitted to develop the PROJECT in phases.


Each phase shall be considered separately and shall not need to satisfy
the open space, bulk density, or other requirements under the Citys
Code, provided that upon completion of development of all phases, in
accordance with the Master Development Plan, said requirements shall
be satisfied by the development considered as a whole, in accordance
with this PUD as approved by the Norman City Council. PROJECT may
be developed in phases at pace determined by market demand.
Therefore, the market demand will be the determining factor in the
number of units constructed in each SDA on lots, the number of lots
developed at any given time, the progression of amenities that will serve
the community, and all other aspects of sequence and timing in the
development of the PROJECT, as determined by the Developer excluding
the required public improvements necessary to serve the PROJECT as it
is constructed. EXHIBIT F depicts the general phasing approach for
infrastructure and construction of the PROJECT. At each phase a
revised calculation of density, open space coverage shall be submitted to
the City of Norman in keeping with proposal approved by the City Council.
8.

Utilities/Infrastructure
Public utilities are planned as shown on the proposed Master
Development Plan submitted herewith.
Utilities will be extended throughout the property as necessary to permit
development of the property.

9.

Lighting
All lighting over any common areas will be shielded from adjacent singlefamily homes. New commercial projects lighting shall meet the standards
of the commercial lighting ordinance where applicable. Decorative street
lights will be allowed within the common areas and parks within the PUD.

10.

Sales Trailers
A temporary trailer will be allowed for use by sales representatives within
each of the residential districts in the PROJECT. The trailer will have a
parking area for customers per City specifications. The trailer will be
removed within approximately twelve months after being on the site.

11.

Landscaping
Landscape within the PROJECT for residential and non-residential uses
will meet the City of Norman Ordinance. See Exhibit G (Preliminary
Landscaping Plan)

12.

Destin Landing

Property Owner Association

Page 28

A mandatory POA will be created to maintain all common elements, the


intended pathways and all private open areas and improvements. The
Developer may create one POA for the entire PROJECT, or may create
one POA for the commercial and mixed use districts and one POA for the
residential districts, with such decision being at the Developers
discretion. All aspects of all exterior improvements made to any property,
must first be approved in writing by the Architectural Control Committee,
in its sole discretion, of the applicable Property Owners Association prior
to issuance of building permit and prior to commencement of any
construction on any lot. The requirements set forth herein are not
exhaustive or exacting as to the requirements that may be set forth by the
Architectural Control Committee in its reviewing judgment, which may be
much more extensive, restrictive, prohibitive, and descriptive than any of
the requirements in this PUD or the building code. The separate tracts of
ownership (Rieger and Shaz) may be developed under separate and
independent POAs and governed independently, under different names
and management. Additionally, the following requirements shall apply:
Applications shall not be submitted to, or accepted by, City for review
unless POA approval is included in application packet.
All covenants shall be reviewed and approved at the Norman City
Attorneys Office for compliance with City Code prior to approval of any
final plat within this Project.

Destin Landing

Page 29

EXHIBITS

A.
B.
C.
D.
E.
F.
G.
H.

Proposed Master Development Plan


Wastewater Collection Study (on file at the City of Norman)
Traffic Impact Analysis (on file at the City of Norman)
Greenspace
Drainage Impact Report (on file at the City of Norman)
Phasing Plan
Preliminary Landscaping Plan
Typical Lot Layouts

Destin Landing

Page 30

EXHIBIT A
Proposed Master Development Plan

Destin Landing

Page 31

EXHIBIT B
Wastewater Collection Study (on file at the City of Norman)

Destin Landing

Page 32

EXHIBIT C
Traffic Impact Analysis (on file at the City of Norman)

Destin Landing

Page 33

EXHIBIT D
Greenspace

Destin Landing

Page 34

EXHIBIT E
Drainage Impact Report (on file at the City of Norman)

Destin Landing

Page 35

EXHIBIT F
Phasing Plan

Destin Landing

Page 36

EXHIBIT G
Preliminary Landscaping Plan

Destin Landing

Page 37

EXHIBIT H
Typical Lot Layouts, Setbacks:

Destin Landing

Page 38

You might also like